| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.7 LAccepted-AOC | L1 | Accepted-AOC as per aoc minutes | |
| 2 | L1₹15.4 LAccepted-AOC | L1 | Accepted-AOC as per aoc minutes | |
| 3 | L1₹15.4 LAccepted-AOC | L1 | Accepted-AOC as per aoc minutes | |
| 4 | Rejected-Technical | - | Rejected-Technical as per enclouser |
Tender Value
₹42.6 L
EMD Value
₹85,266
Closing Date
18 Jun 2024, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Superintending Engineer Nagaon circle Irrigation
REVIVAL OF DAKARGHAT LEFT LIS UNDER SOPD _G FOR THE YEAR 2023_24
2024_ID_37528_1
SEI/T-27/ET-1/2024-25/162
Open Tender
Civil Works
Item Rate
90 days
Dakarghat
Please refer Tender documents.
3 documents required · 3 mandatory
₹900
₹85,266
Yes
2 Aug 2024
7 Jun 2024
18 Jun 2024
7 Jun 2024
18 Jun 2024
7 Jun 2024
Amount
Repairing of intake Reservoir
Labour cost for dismantling of old CC canal lining and carriage of the materials and depositing the same in a safe distance as directed complete. : Carriage up to lead of 30 M and lift upto 1.50 M
Soling in foundation at all levels including filling intersides, ramming etc complete as directed and of specified thickness with 9 cm brick on flat including sand packing.
CC work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc. with hard broken stoneaggregate of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete asdirected. (Shuttering, scaffolding cost will be paid separately).
12 mm cement plastering including clearing surface and curing, complete as directed. (ii) In proportion 1:4
Repairing of Main Canal Rectangular Section
River sand filling in plinth, canal bed, canal slopes, bases of structure, etc in layers not more than 150 mm thick including necessary carriage, watering etc, complete as directed as specified.
Soling in foundation at all levels including filling intersides, ramming etc complete as directed and of specified thickness with 9 cm brick on flat including sand packing.
CC work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc. with hard broken stoneaggregate of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete asdirected. (Shuttering, scaffolding cost will be paid separately).
1st class brick work in cement mortar in abutment and wing wall, parapet wall etc,including racking out joints and curing etc, complete as directed.(i) In proportion 1:4
12 mm cement plastering including clearing surface and curing, complete as directed. (ii) In proportion 1:4
Repairing of Main Canal Bed and Side walls From Ch. 0.00m to Ch.900.00m at different stretches
Labour cost for dismantling of old CC canal lining and carriage of the materials and depositing the same in a safe distance as directed complete. : Carriage up to lead of 30 M and lift upto 1.50 M
Labour for preparation of subgrade of lined canal section as per design drawing and grade by ramming and rolled to level and according to the required cross section of the typical lined canal including cutting, filling the existing canal section where necessary compacting the earth in layers in not more than 15 cm thick to form a firm compacted bed & side for lining including watering to obtain required moisture content where necessary etc, complete as directed. (i) For ordinary soil
Soling in foundation at all levels including filling intersides, ramming etc complete as directed and of specified thickness with 9 cm brick on flat including sand packing.
CC work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc. with hard broken stoneaggregate of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete asdirected. (Shuttering, scaffolding cost will be paid separately).
12 mm cement plastering including clearing surface and curing, complete as directed. (ii) In proportion 1:4
Earthwork in filling in Marginal bund / Guide bank / Afflux bund / Canal embankment etc. to the design section and grade by obtaining earth from outside borrow pits and filling in uniform layers not exceeding 15 cm thick including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps from the seat of embankment and borrow pit area, breaking clods not more than 10 mm cube, ramming, watering, dressing and roughening the seat of embankment, profiling etc. Paying compensation of earth borrowed from private or forest land if any, lead upto 30 M and lift upto 1.5 M, complete as directed.
Sub canal from Main canal at different chainage 6 nos.
Labour cost for dismantling of old CC canal lining and carriage of the materials and depositing the same in a safe distance as directed complete. : Carriage up to lead of 30 M and lift upto 1.50 M
Soling in foundation at all levels including filling intersides, ramming etc complete as directed and of specified thickness with 9 cm brick on flat including sand packing.
CC work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc. with hard broken stoneaggregate of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete asdirected. (Shuttering, scaffolding cost will be paid separately).
1st class brick work in cement mortar in abutment and wing wall, parapet wall etc. Including racking out joints and curing etc. complete (ii) In proportion 1:4 .
12 mm cement plastering including clearing surface and curing, complete as directed. (ii) In proportion 1:4
Supplying, fitting, fixing PVC pipes (IS 12818, 6 kg/cm2), joining pipes with relevant cement, levelling, testing leakages etc, complete as directed. (Cost of E/W foundation trenches will be paid separately).
Construction of Hume Pipe Cross-Drainage Works [ 2 Rows -5 No. Each row - 900 Ø ]
Earthwork in excavation in foundation of canal structures in all types of soils as per design and drawing including dressing the foundation, shoring etc. removing the surplus spoils by head load to safe distance from the working place and depositing the required spoils in uniform layers, dressing, watering, breaking clods to not more than 10 mm cube with compensation, complete as directed at site. (Including bailing out stagnant rain water where necessary). A. All type of soils except soil mixed with gravel & boulders. (ii) For normal lead of 60.0 m and lift of 3.0 m
Collection of sand gravel (40% sand and 60% gravel of gravel of size 25 mm to 60 mm) free from dust and dirt including stacking in measurable stacks at quarry site and making payment of forest royalty etc. as directed complete.
Carriage of boulders, gravels, metal screening, stacking in measurable stacks at site, complete as directed. (A) For normal road upto 25.0 Km (ii) With Contractor's Profit & GST
Labour charges for spreading hard river shingles / sand gravels to required thickness over approach subway etc. including ramming, dressing the seat before laying the materials lead upto 30 M and lift 1.5 M, complete as directed.
Cement concrete work in proportion 1:2:4 in foundation / abutment / piers / wing walls etc. with hard river shingles of size 6 mm to 20 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately)
Supply and Carriage of 0.9 M Dia Hume Pipe 2.5 m length including Coller to site godown complete as directed
Labour for fitting and fixing hume pipe in position with collars including joining the cement mortar in proportion 1:3 and curing, including carrying the same from godown to site and complete as directed (iii) For 90 cm to 120 cm
Centering and shuttering including propping etc. where necessary and removal of forms after completion of CC and RCC works, complete as directed. (Measurement to be taken on the face area timbered). Shuttering (Beam) without Prop.
Earth work in back filling of structure obtained from outside borrow pits filling in 15cm layers, ramming, dressing, watering including paying compensation of land if any (with lead upto 30.0 m and lift 1.50m).
KUNTAL BARUAH
RABIN CHANDRA SARMAH
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .