Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.6 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹11.7 L+₹14,517.50 (1.25%)Admitted-Finance | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | S. MUTHU L1 | WILSON ANANTHA RAJ L2 |
|---|---|---|---|---|---|
| 1.00Providing BT Patch work | |||||
| 1.01 | Advance Patch work 13.20mm Providing Advancve Patch work using 50mm consolidated Thickness by using 1 m3 of 13.20mm IRC Metal with 44kg of Bittumen per 1 m3 of Metal For Pre Mixing For existing surface advance Patch work including cost and conveyance of materials to the work site and stacking them to the departmental metric guage for the premeasurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 60-70KN power roller for premix carpet and seal coat seperately including labour charges for spreading the mix for premix carpet application of bitumen for seal coat over premix carpet, including labour charges for spreading seal coat seperately over premix carpet etc. including higher charges and fuel charges for , bitumen boiler and all other tools and plant employed etc. complete as per of MoRTH Rev - V Specifications | 130 | m3 | 4,354 ₹5,66,020 Lowest | 4,358 ₹5,66,540 |
| 1.02 | Providing and laying tack coat of 2kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications | 2,545 | m2 | 25 ₹63,625 Lowest | 27 ₹68,715 |
| 1.03 | Providing and laying 20mm compacted thick Premix carpet with seal coat type B using 0.18 cum of 13.2 mm IRC size HBG metal and 0.09 cum of 11.20 mm IRC size HBG metal with 14.60 kgs of of bitumen for premixing per 10 sqm of premix carpet and 0.06 cum of Sand with 6.00 kgs of bitumen for seal coat type B per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature for premix carpet in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site,spreading the mix in required temperature for uniform thickness of 20 mm with mechanical paver to the specified grades and cross sections and compaction by 80-100 KN power roller for premix carpet and seal coat seperately to the required density etc., including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site application of bitumen for sealcoat over premix carpet ,spreading tof seal coat etc., including hire charges and fuel charges for C M P with bitumen boiler,tipper trucks,paver finisher, power rollers and all other tools and plants required,including all other incidental charges etc.,complete using C M P clause 509 of Morth specifications. | 2,545 | m2 | 208 ₹5,29,360 Lowest | 211.5 ₹5,38,267.5 |
Tender Value
Refer Docs
EMD Value
₹14,000
Closing Date
8 Aug 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Commissioner Nagercoil City Municipal Corporation
City Municipal Corporation Office Nagercoil 629001 Ph.No. 04652230984
Nagercoil Corporation Providing BT Patch work South Zone at ward no.33,34,35,36,37, 43, 44,45,46, 49,50, 51,52 (Phase I)
2025_MAWS_587103_1
193/2025-2026
Open Tender
Civil Works
Lump-sum
90 days
Nagercoil Corporation Providing BT Patch work Sou
Registered Contractor
4 documents required · 4 mandatory
₹0
₹14,000
11 Aug 2025
30 Jul 2025
8 Aug 2025
30 Jul 2025
8 Aug 2025
30 Jul 2025
Amount
Providing BT Patch work
Advance Patch work 13.20mm Providing Advancve Patch work using 50mm consolidated Thickness by using 1 m3 of 13.20mm IRC Metal with 44kg of Bittumen per 1 m3 of Metal For Pre Mixing For existing surface advance Patch work including cost and conveyance of materials to the work site and stacking them to the departmental metric guage for the premeasurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 60-70KN power roller for premix carpet and seal coat seperately including labour charges for spreading the mix for premix carpet application of bitumen for seal coat over premix carpet, including labour charges for spreading seal coat seperately over premix carpet etc. including higher charges and fuel charges for , bitumen boiler and all other tools and plant employed etc. complete as per of MoRTH Rev - V Specifications
Providing and laying tack coat of 2kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications
Providing and laying 20mm compacted thick Premix carpet with seal coat type B using 0.18 cum of 13.2 mm IRC size HBG metal and 0.09 cum of 11.20 mm IRC size HBG metal with 14.60 kgs of of bitumen for premixing per 10 sqm of premix carpet and 0.06 cum of Sand with 6.00 kgs of bitumen for seal coat type B per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature for premix carpet in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site,spreading the mix in required temperature for uniform thickness of 20 mm with mechanical paver to the specified grades and cross sections and compaction by 80-100 KN power roller for premix carpet and seal coat seperately to the required density etc., including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site application of bitumen for sealcoat over premix carpet ,spreading tof seal coat etc., including hire charges and fuel charges for C M P with bitumen boiler,tipper trucks,paver finisher, power rollers and all other tools and plants required,including all other incidental charges etc.,complete using C M P clause 509 of Morth specifications.
WILSON ANANTHA RAJ (BID ID -1423767)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .