| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAccepted-AOC | ₹1.5 L Quoted ₹1.9 L | L1 | Accepted-AOC Work was Awarded |
| 2 | L2₹2.4 LRejected-AOC | ₹2.4 L | L2 | Rejected-AOC Work was Not Awarded |
| Sl No | Description | Qty | Unit | SARASWATHY ENGINEERING AND CONTRACTORS L2 | Vinisha Engineering works L1 |
|---|---|---|---|---|---|
| 1.00 | Charges for maintenance works in HV Condenser Bushings of 250MVA Three phase Generator Transformers and 216 KV LAS: Disconnection of HV jumper connections in Generator Transformers R,Y and B phases, support insulators, 216 kv lightning arrestors and neutral grounding CT, cleaning of HV condenser bushings, support insulators, neutral bushings, 216 kv LAS, connecting leads for MRT testing, restoring of all jumper connections and tightness checking. | 3 | Nos | 12,225 ₹14,425.50 | 11,412 ₹13,466.16 |
| 2.00 | Cleaning of Neutral earth resistance of UAT 2A &2B, UST-II, SST-II, Generator neutral grounding reactor and Generator neutral grounding Transformer. Assisting for testing, meggering and measuring resistance value. | 4 | Nos | 13,140 ₹15,505.20 | 12,268 ₹14,476.24 |
| 3.00 | Charges for maintenance works in 230 KV strung bus of 250MVA Three phase Generator Transformer R,Y and B phases: Transportation of ladder from switch yard II, Tightness checking at the joints of jumpers from Generator Transformers , Support insulator and LAS to strung bus, checking the conditions of aluminium clamps and replacing if needed. | 3 | Nos | 12,291 ₹14,503.38 | 11,475 ₹13,540.50 |
| 4.00 | Opening the manholes in UAT 2A & 2B, disconnection of primary links at both transformers, cleaning the primary terminal bushings. Opening the LV chamber of UAT 2A & 2B, Cleaning the LV Bushings and bus bars, Tightness checking of LV side cables, After completion of work closing the LV chamber. Assisting during testing. Restoration after completion of the works. | 1 | No | 15,153 ₹17,880.54 | 14,146 ₹16,692.28 |
| 5.00 | UST-II and SST-II Opening the HV side adopter box cover of the transformer, terminal tightness checking, and cleaning changing of the gasket for top cover and closing. Tightness checking at LV side cables, arresting of oil leaks if any, assisting for meggering and Buchholz relay testing, external cleaning. Restoration after completion of the works. | 2 | Nos | 14,010 ₹16,531.80 | 13,078 ₹15,432.04 |
| 6.00 | Excitation transformer Disconnection of the bus links from HV/LV side, cleaning the transformer, assisting for testing and meggering, LV side cable tightness checking. Restoration of the links after completion of the works. | 1 | No | 11,127 ₹13,129.86 | 10,387 ₹12,256.66 |
| 7.00 | BUS DUCT (Phase side) Opening the manhole in the phase side bus duct and disconnection of the horizontal bus bars in all the three phases. Inspection of flexible copper jumbers and connectors & tightness checking. Assisting for testing, meggering. Restoration of the bus bar links after completion of the works and closing the manholes. | 3 | Nos | 22,893 ₹27,013.74 | 21,369 ₹25,215.42 |
| 8.00 | BUS DUCT (Neutral side) Opening the manhole in neutral bus duct and disconnection of the vertical bus bars for all the three phases and cleaning. Inspection of flexible copper jumbers and connectors & tightness checking. Assisting for testing, meggering. Restoration of the links and closing of the man holes after completion of the works. | 3 | Nos | 22,893 ₹27,013.74 | 21,369 ₹25,215.42 |
| 9.00 | Bus duct man hole opening at all the phases, cleaning of the buses from Generator Phase side to Generator transformer both out side and inside, tightness checking of all the joints, cleaning of the supporting insulators, LAVT Cubicles assisting for testing and meggering. Restoration of covers after completion of the works. | 3 | Nos | 18,783 ₹22,163.94 | 17,532 ₹20,687.76 |
| 10.00 | Cleaning and tightness checking of LAVT cubicles, bus bars, dismantling of 3 Nos. 18 KV lightning arrestors from LAVT cubicle Transporting to MRT Lab for testing &restoration after testing. | 3 | Nos | 7,737 ₹9,129.66 | 7,224 ₹8,524.32 |
Tender Value
Refer Docs
EMD Value
₹1,400
Closing Date
5 Jan 2026, 2:00 pmClosed
CE/TTPS
Chief Engineer / TTPS, Tuticorin
TTPS ES Circle EM I Annual Maintenance of Transformers and Generator Bus duct of Unit II during the Annual overhauling for the year 2025 2026
2025_EB_634617_1
CE/SE/ES/TTPS/187/2025-26
Open Tender
Electrical and Maintenance Works
30 days
TTPS
As per BQR conditions in NIT
6 documents required · 6 mandatory
₹0
₹1,400
Yes
7 Mar 2026
19 Dec 2025
6 Jan 2026
19 Dec 2025
5 Jan 2026
19 Dec 2025
Charges for maintenance works in HV Condenser Bushings of 250MVA Three phase Generator Transformers and 216 KV LAS: Disconnection of HV jumper connections in Generator Transformers R,Y and B phases, support insulators, 216 kv lightning arrestors and neutral grounding CT, cleaning of HV condenser bushings, support insulators, neutral bushings, 216 kv LAS, connecting leads for MRT testing, restoring of all jumper connections and tightness checking.
Cleaning of Neutral earth resistance of UAT 2A &2B, UST-II, SST-II, Generator neutral grounding reactor and Generator neutral grounding Transformer. Assisting for testing, meggering and measuring resistance value.
Charges for maintenance works in 230 KV strung bus of 250MVA Three phase Generator Transformer R,Y and B phases: Transportation of ladder from switch yard II, Tightness checking at the joints of jumpers from Generator Transformers , Support insulator and LAS to strung bus, checking the conditions of aluminium clamps and replacing if needed.
Opening the manholes in UAT 2A & 2B, disconnection of primary links at both transformers, cleaning the primary terminal bushings. Opening the LV chamber of UAT 2A & 2B, Cleaning the LV Bushings and bus bars, Tightness checking of LV side cables, After completion of work closing the LV chamber. Assisting during testing. Restoration after completion of the works.
UST-II and SST-II Opening the HV side adopter box cover of the transformer, terminal tightness checking, and cleaning changing of the gasket for top cover and closing. Tightness checking at LV side cables, arresting of oil leaks if any, assisting for meggering and Buchholz relay testing, external cleaning. Restoration after completion of the works.
Excitation transformer Disconnection of the bus links from HV/LV side, cleaning the transformer, assisting for testing and meggering, LV side cable tightness checking. Restoration of the links after completion of the works.
BUS DUCT (Phase side) Opening the manhole in the phase side bus duct and disconnection of the horizontal bus bars in all the three phases. Inspection of flexible copper jumbers and connectors & tightness checking. Assisting for testing, meggering. Restoration of the bus bar links after completion of the works and closing the manholes.
BUS DUCT (Neutral side) Opening the manhole in neutral bus duct and disconnection of the vertical bus bars for all the three phases and cleaning. Inspection of flexible copper jumbers and connectors & tightness checking. Assisting for testing, meggering. Restoration of the links and closing of the man holes after completion of the works.
Bus duct man hole opening at all the phases, cleaning of the buses from Generator Phase side to Generator transformer both out side and inside, tightness checking of all the joints, cleaning of the supporting insulators, LAVT Cubicles assisting for testing and meggering. Restoration of covers after completion of the works.
Cleaning and tightness checking of LAVT cubicles, bus bars, dismantling of 3 Nos. 18 KV lightning arrestors from LAVT cubicle Transporting to MRT Lab for testing &restoration after testing.
Cleaning of the Generator Transformer bushings of R, Y & B Phases and other supporting insulators, lightning arrestors and checking of oil leaks, cleaning of the top surface of the transformers, tightness checking of the jumper joints
Charges for maintenance works in 250 MVA Three phase Generator Transformer R,Y and B Phases: Opening of LV turret covers in Generator transformers R,Y and B phases, disconnection of flexible links in 24 kv bus duct to GT LV side, cleaning the transformer, meggering, topping up of oil if needed and assisting for testing of bucholz relay, surge relay and PRV, restoration of LV side links after completion of works.
Labour charges for H2 gas Regenerative type drier cleaning both A & B chamber internal cleaning ,gasket changing work.
Charges for cleaning of Generator Transformer & its radiators, UAT2A, UAT 2B & its radiators, UST-II and SST-II with sodakaram and water during completion of overhauling works.
SARASWATHY ENGINEERING AND CONTRACTORS (BID ID -1552184)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_759369.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid