Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹9.1 Laccepted-aoc | ₹9.1 L | accepted-aoc |
Tender Value
Refer Docs
EMD Value
₹23,000
Closing Date
22 Apr 2026, 10:30 pmClosed
Agriculture Produce Marketing Committee
Aravind P Patil
Providing CC TV camera in Main market yard, cattle market and Old market yard of Dharwad APMC approved under Annual Action Plan 2025-26
APMC/2025-26/OW/WORK_INDENT915
APMC/2025-26/OW/WORK_INDENT915
Open
Other Works
Two Tender Document System(Two Cover)
SECRETARY APMC Office DHARWAD
6 documents required · 6 mandatory
Department Registration Details
Total value of civl engineering works executed and payments received in the last five years (year-wise)
List of existing commitments and ongoing work
List of works for which tenders already submitted
Banker Details
All Technical Criteria as per KW3
₹500
₹23,000
22 Apr 2026
10 Apr 2026
24 Apr 2026
15 Apr 2026
Providing CC TV camera in Main market yard, cattle market and Old market yard of Dharwad APMC approved under Annual Action Plan 2025-26
4MP Dual Light Bullet Camera STQC 1/2.7 4MP PSCMOS Image Sensor 0.9407 Centimeters Max. 4MP2688 15201 25 30fps 25601440)1 25 30fps Instastream, H.265, H.264, H.264H, H.264B, MJPEG Support Quad stream ...
1/1.8 4 MP CMOS sensor 1.411 Centimeters STQC Max. 4MP (2688 1520 30fps H.265, H.264M, H.264H, H.264B, MJPEG 10 mm 50 mm Motorized Lens WDR140dB, Day Night ICR, 3D NR, BLC, HLCIR Range of 30 Mtr., IP6...
32ch 4K Channel 4 Sata HDD Network Video Recorder - Smart H.26+H.265/ Smart H.264+/H.264 decoding format, Up to 16 MP Resolution & Max 10ch@ 1080P decoding, Max 256Mbps Incoming Bandwidth, 8 SATA HDD ...
Supply and Installation of 6 TB Enterprice Hard Disk including cost of aul materials, machinery labour etc complete as directed by the Engineer in charge.
Supply and Installation of 6U Rack including cost of all materials, machinery labour etc complete as directed by the Engineer in charge.
Supply and Installation of 8 Port POE 2 Giga Uplink Switch with SFP Ports including cost of all materials, machinery labour etc complete as directed by the Engineer in charge.
Supply and Installation of 1 GBPS Media Convertor with SFP including cost of all materials, machinery labour etc complete as directed by the Engineer in charge.
Supply and Installation of 8 Port 1000 mbps Lan Switch including cost of all materials, machinery labour etc complete as directed by the Engineer in charge.
Supply and Installation of Extension Box with MCB & Switch including cost of all materials, machinery labour etc complete as directed by the Engineer in charge.
Supply and Installation of 1.5sqmm 3 Core Power Cable as directed by the Engineer in charge including cost of all materials, machinery, labour, etc.
Supply and Installation of 6 Core OF Cable as directed by the Engineer in charge including cost of all materials, machinery, labour, etc.
Supply and Installation of Cat 6 Lan Cable as directed by the Engineer in charge including cost of all materials, machinery, labour, etc.
Installation for OFC Splicing including cost of all materials. machinery labour etc complete as directed by the Engineer in charge.
Supply and Installation of LC to LC Patch Cord Meters including cost of all materials, machinerylabour etc complete as directed by the Engineer in charge.
Supply and Installation of OFC Termination Box including cost of all materials, machinery labour etc complete as directed by the Engineer in charge.
Supply and Installation of 32'' LED Monitor
Supply and Installation of metal box
Supply Installation & Testing with one year AMC
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
C C CAMERA.pdf
Instructions to Tenderers • 0.46 MB
KW-1 CC Camera new.docx
Tender Document • 0.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .