Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
23 Apr 2025, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, TLMD-IV, Jammu
Office of Executive Engineer, TLMD-IV, Jammu
RATE CONTRACT FOR Preventive/ Routine/ Breakdown Maintenance of Components for RATE CONTRACT FOR Preventive/ Routine/Breakdown Maintenance of Components for Grids and Lines falling under the jurisdiction of TLMD-IV JKPTCL, Jammu for the year 2025-26
2025_PDD_275223_1
TLMD-IV/J/02 of 2025-26 Dated 04-04-2025
Open Tender
Electrical and Maintenance Works
Item Wise
365 days
Gss Barn
As per SBD and NIT
3 documents required · 3 mandatory
₹2,000
Executive Engineer, TLMD-IV, Jammu
₹50,000
Office of Executive Engineer, TLMD-IV, Jammu
3 Jul 2025
4 Apr 2025
25 Apr 2025
4 Apr 2025
23 Apr 2025
10 Apr 2025
7 Apr 2025
Break-down work (Emergency works) for 220KV Lines
Jumpers (Replacement of burnt/damaged jumpers and tightening of remaining jumpers on the same tower)
Disc Insulators ( Replacement of damaged disc insulators)
Tension String
Suspension String
Power Conductor
Restoration of snapped power conductor(per phase). Complete job including mid-span compression joint, laying of conductor, rough sagging, tensioning of conductor dead-end assembly etc. upto span of 500 metres.
Restoration of snapped power conductor(per phase). Complete job including mid-span compression joint, laying of conductor, rough sagging, tensioning of conductor dead-end assembly etc. beyond span of 500 metres and upto 1000 metres.
Earth Wire
Restoration of snapped earthwire complete job including mid-span compression joint, laying of conductor, rough sagging, tensioning of earthwire, dead-end assembly etc. upto span length of 500 metres
Restoration of snapped earthwire complete job including mid-span compression joint, laying of conductor, rough sagging, tensioning of earthwire, dead-end assembly etc. beyond span length of 500 meters and upto 1000 meters
Planned works
Checking and tightening of jumpers
Replacement of damaged /burnt out jumpers
Fixing of damper/vibrator on earthwire/ACSR/Panther Conductor
Replacement of damaged disc insulators
Tension string
Suspension string
Repairing of power conductor when lowering of conductor is necessary. Complete job including laying of conductor, making of compression joint/compression sleeve, if any, rough sagging tensioning of conductor, fixing dead end assembly etc. upto span of 500 meter
Repairing of power conductor when lowering of conductor is necessary. Complete job including laying of conductor, making of compression joint/compression sleeve, if any, rough sagging tensioning of conductor, fixing dead end assembly etc beyond span of 500 metre and upto 1000mts.
Repairing of ground wire (earthwire) when lowering of conductor is necessary. Complete job including laying of conductor, making of compression joint/Repair Sleeve (compression type), if any, rough sagging tensioning of conductor, fixing dead end assembly etc. upto span of 500 meter
Repairing of ground wire (earthwire) when lowering of conductor is necessary. Complete job including laying of conductor, making of compression joint/Repair Sleeve (compression type), if any, rough sagging tensioning of conductor, fixing dead end assembly etc. beyond span of 500 meter and upto 1000 meters
Stringing and saging of conductors including sagging, tensioning, fitting of dead end assamblies etc.(complete job)
Stringing and saging of ground wire including sagging, tensioning, fitting of dead end assamblies etc.(complete job)
For Double circuit tower including Shutdown factor
Foundation:- Repairing of damaged foundation/top sealing including material .
Repairing of protection wall(Revetment) including back filling of earth with RR Masonry including material.
Repairing of RCC concreating including material..
Earth work in excavation in all kinds of soil
Backfilling of good earth in the tower platform or behind the protection wall or whereever required
Provision of providing crate wall (Gabbon wall)
Checking & Tightening of nuts and bolts of tower superstructures and replacement of missing ones.
a) Tower weight more than 4 tonnes to 7.5 tonnes
b) Tower weight more than 7.5 tonnes
Checking / tightening of tower footing earthing bolts and measuring tower footing resistance.
Branch cutting under the corridor of transmission line
Making temporary approach path
Deweeding/Platform clearance/corridor clearance of the area under the tower/transmission line
Replacement of missing tower members.
Reparing damaged conductor by using helical sleeve/Armour Rod/repair sleeve or Bolted or by shorting method with out lowering the conductor.
Fixing of anti-climbing device/Bird Guard over S/C & D/C tower
Fixing of phase plates/No. plates/danger plates over S/C & D/C tower
Maintaining the adequate spacing between the two consecutive conductors by way of cutting the conductors and making use of new tension fittings
Maintaining the adequate spacing between the two consecutive conductors by way of adding or pull out the disc insulators from the Disc insulators string
Dismantling works
Dismantling of Emergency Restoration System (ERS) T&P Material i.e. articulated base (Gimbal), mast sections, box sections, guy plates/swivels, bolts, & nuts etc.
Dismantling of conductor used in Emergency Restoration System (ERS) per phase(per string)
Dismantling of anti-climbing device/Bird Guard over S/C & D/C tower
Dismantling of phase plates/No. plates/danger plates over S/C & D/C tower
Dismantling of tower member from the tower
Dismantling of vibration damper on conductor/earthwire
Dismantling of damaged conductor/conductor from the towers per phase(per string)
Dismantling of damaged Earth wire/earthwire from the towers
Collection of Dismantled/damaged ACSR Zebra/Panther conductor from the site of work to store by way of making its loops and then its loading in the mechanical vehicle.
Providing of Skilled /Semi-Skilled / UnSkilled labour for the works which are not covered in the above
Skilled Labour ( Rigger/Fitter)
Semi-skilled Labour ( Asstt. Fitter)
UnSkilled Labour
Manual Carriage(for first 100m distance)
carriage of Emergency Restoration System (ERS) T&P Material
carriage of tower material members
carriage of T&P items i.e Foursheave ,comealong clamp,pulleys, rollers,PP ropes etc.
carriage of Disc insulators /Dampers/conductor fittings
carriage of ACSR zebra/Panther conductor
Manual Carriage(for every subsequent 100 meter distance)
carriage of Emergency Restoration System (ERS) T&P Material i.e. articulated base (Gimbal), mast sections, box sections, guy plates/swivels, bolts, & nuts etc.
carriage of tower material members
carriage of T&P items i.e Foursheave ,comealong clamp,pulleys, rollers,PP ropes etc.
carriage of Disc insulators /Dampers/conductor fittings
carriage of ACSR zebra/panther conductor
Loading and unloading
loading of Emergency Restoration System (ERS) T&P Material i.e. articulated base (Gimbal), mast sections, box sections, guy plates/swivels, bolts, & nuts etc.
unloading ofEmergency Restoration System (ERS) T&P Material i.e. articulated base (Gimbal), mast sections, box sections, guy plates/swivels, bolts, & nuts etc.
loading of ACSR zebra/Panther conductor in Mechanical transport
unloading of ACSR zebra/Panther condutor from mechanical transport
loading of T&P items i.e Foursheave ,comealong clamp,pulleys, rollers,PP ropes etc. in Mechanical transport
unloading of T&P items i.e Foursheave ,comealong clamp,pulleys, rollers,PP ropes etc. in Mechanical transport
loading of Disc insulators /Dampers/conductor fittings etc in Mechanical transport
unloading of Disc insulators /Dampers/conductor fittings etc in Mechanical transport
Erection and Stringing of Emergency Restroration System(ERS)
Erection of Emergency Restroration System(ERS) complete in all aspects as per requirement at site including articulated base (Gimbal), mast sections, box sections, guy plates/swivels, bolts, & nuts etc.
Stringing of Emergency Restroration System(ERS) complete in all aspects as per requirement at site with ACSR Zebra Conductor
Stringing of Emergency Restroration System(ERS) complete in all aspects as per requirement at site with Panther Conductor
Store handling:
Unloading / Loading of T&P Material(i.e Four Sheaves pulley ,Pulleys ,Ropes ,Compression machine etc) for Transmission Line works in divisional stores narwal/bhatindi including manual carriage within store yard by way of sorting and its checking
Unloading / Loading of Emergency Restoration System (ERS) T&P Material( i.e. articulated base (Gimbal), mast sections, box sections, guy plates/swivels, bolts, & nuts etc.) for Transmission Line Restoration works in divisional stores narwal/bhatindi including manual carriage within store yard by way of sorting and its checking
Unloading / Loading of Cement in divisional store narwal/bhatindi including manual Carriage within store yard).
Unloading / Loading of Crates in divisional store narwal/bhatindi including manual Carriage within store yard).
Unloading / Loading of Disc Insulators/Fittings in divisional store narwal/bhatindi Including manual Carriage within store yard) by way of sorting and its checking for breakage.
Unloading / Loading of ACSR/Panther conductor etc in divisional store narwal/bhatindi Including manual Carriage within store yard) by way of sorting,unreeling from the drum and its checking.
Sorting of tower members in the divisonal store and its stacking at proper place including its manual carriage within store yard.
Unloading / Loading of Iron material such as Tar steel / MS angle/MS Flat etc in divisional store narwal/bhatindi Including manual Carriage within store yard) by way of sorting and its checking.
PVC panelling of wall
Mechanical Carriage of T&P and other allied material from divisional store to site of work and back carriage of T&P
Average distance upto 40Km
Average distance upto 60Km
Average distance upto 80Km
Average distance upto 200Km
Average distance upto 300 Km
Average distance upto 400 Km
Mechanical Carriage of Emergency Restoration System(ERS)T&P and other allied material from divisional store to site of work and back carriage of T&P
Average distance upto 40Km
Average distance upto 60Km
Average distance upto 80Km
Average distance upto 200Km
Average distance upto 300 Km
Average distance upto 400 Km
Description of Work / Item(s)
Break-down work (Emergency works) for 132KV Lines
Jumpers (Replacement of burnt/damaged jumpers and tightening of remaining jumpers on the same tower)
Disc Insulators ( Replacement of damaged disc insulators)
Tension String
Suspension String
Power Conductor
Restoration of snapped power conductor(per phase). Complete job including mid-span compression joint, laying of conductor, rough sagging, tensioning of conductor dead-end assembly etc. upto span of 500 metres.
Restoration of snapped power conductor(per phase). Complete job including mid-span compression joint, laying of conductor, rough sagging, tensioning of conductor dead-end assembly etc. beyond span of 500 metres and upto 1000 metres.
Earth Wire
Restoration of snapped earthwire complete job including mid-span compression joint, laying of conductor, rough sagging, tensioning of earthwire, dead-end assembly etc. upto span length of 500 metres
Restoration of snapped earthwire complete job including mid-span compression joint, laying of conductor, rough sagging, tensioning of earthwire, dead-end assembly etc. beyond span length of 500 meters and upto 1000 meters
Planned works
Checking and tightening of jumpers
Replacement of damaged /burnt out jumpers
Fixing of damper/vibrator on earthwire/ACSR/Panther Conductor
Replacement of damaged disc insulators
Tension string
Suspension string
Repairing of power conductor when lowering of conductor is necessary. Complete job including laying of conductor, making of compression joint/compression sleeve, if any, rough sagging tensioning of conductor, fixing dead end assembly etc. upto span of 500 meter
Repairing of power conductor when lowering of conductor is necessary. Complete job including laying of conductor, making of compression joint/compression sleeve, if any, rough sagging tensioning of conductor, fixing dead end assembly etc beyond span of 500 metre and upto 1000mts.
Repairing of ground wire (earthwire) when lowering of conductor is necessary. Complete job including laying of conductor, making of compression joint/Repair Sleeve (compression type), if any, rough sagging tensioning of conductor, fixing dead end assembly etc. upto span of 500 meter
Repairing of ground wire (earthwire) when lowering of conductor is necessary. Complete job including laying of conductor, making of compression joint/Repair Sleeve (compression type), if any, rough sagging tensioning of conductor, fixing dead end assembly etc. beyond span of 500 meter and upto 1000 meters
Stringing and saging of conductors including sagging, tensioning, fitting of dead end assamblies etc.(complete job)
Stringing and saging of ground wire including sagging, tensioning, fitting of dead end assamblies etc.(complete job)
For Double circuit tower including Shutdown factor
Foundation:- Repairing of damaged foundation/top sealing including material.
Repairing of protection wall(Revetment) including back filling of earth with RR Masonry including material
Repairing of RCC concreating including material.
Earth work in excavation in all kinds of soil
Backfilling of good earth in the tower platform or behind the protection wall or whereever required
Provision of providing crate wall (Gabbon wall)
Checking & Tightening of nuts and bolts of tower superstructures and replacement of missing ones.
a) Tower weight more than 4 tonnes to 7.5 tonnes
b) Tower weight more than 7.5 tonnes
Checking / tightening of tower footing earthing bolts and measuring tower footing resistance.
Branch cutting under the corridor of transmission line
Making temporary approach path
Deweeding/Platform clearance/corridor clearance of the area under the tower/transmission line
Replacement of missing tower members.
Reparing damaged conductor by using helical sleeve/Armour Rod/repair sleeve or Bolted or by shorting method with out lowering the conductor.
Fixing of anti-climbing device/Bird Guard over S/C & D/C tower
Fixing of phase plates/No. plates/danger plates over S/C & D/C tower
Maintaining the adequate spacing between the two consecutive conductors by way of cutting the conductors and making use of new tension fittings
Maintaining the adequate spacing between the two consecutive conductors by way of adding or pull out the disc insulators from the Disc insulators string
Dismantling works
Dismantling of Emergency Restoration System (ERS) T&P Material i.e. articulated base (Gimbal), mast sections, box sections, guy plates/swivels, bolts, & nuts etc.
Dismantling of conductor used in Emergency Restoration System (ERS) per phase(per string)
Dismantling of anti-climbing device/Bird Guard over S/C & D/C tower
Dismantling of phase plates/No. plates/danger plates over S/C & D/C tower
Dismantling of tower member from the tower
Dismantling of vibration damper on conductor/earthwire
Dismantling of damaged conductor/conductor from the towers per phase(per string)
Dismantling of damaged Earth wire/earthwire from the towers
Collection of Dismantled/damaged ACSR Zebra/Panther conductor from the site of work to store by way of making its loops and then its loading in the mechanical vehicle.
Providing of Skilled /Semi-Skilled / UnSkilled labour for the works which are not covered in the above
Skilled Labour ( Rigger/Fitter)
Semi-skilled Labour ( Asstt. Fitter)
UnSkilled Labour
Manual Carriage(for first 100m distance)
carriage of Emergency Restoration System (ERS) T&P Material
carriage of tower material members
carriage of T&P items i.e Foursheave ,comealong clamp,pulleys, rollers,PP ropes etc.
carriage of Disc insulators /Dampers/conductor fittings
carriage of ACSR zebra/Panther conductor
Manual Carriage(for every subsequent 100 meter distance)
carriage of Emergency Restoration System (ERS) T&P Material i.e. articulated base (Gimbal), mast sections, box sections, guy plates/swivels, bolts, & nuts etc.
carriage of tower material members
carriage of T&P items i.e Foursheave ,comealong clamp,pulleys, rollers,PP ropes etc.
carriage of Disc insulators /Dampers/conductor fittings
carriage of ACSR zebra/panther conductor
Loading and unloading
loading of Emergency Restoration System (ERS) T&P Material i.e. articulated base (Gimbal), mast sections, box sections, guy plates/swivels, bolts, & nuts etc.
unloading ofEmergency Restoration System (ERS) T&P Material i.e. articulated base (Gimbal), mast sections, box sections, guy plates/swivels, bolts, & nuts etc.
loading of ACSR zebra/Panther conductor in Mechanical transport
unloading of ACSR zebra/Panther condutor from mechanical transport
loading of T&P items i.e Foursheave ,comealong clamp,pulleys, rollers,PP ropes etc. in Mechanical transport
unloading of T&P items i.e Foursheave ,comealong clamp,pulleys, rollers,PP ropes etc. in Mechanical transport
loading of Disc insulators /Dampers/conductor fittings etc in Mechanical transport
unloading of Disc insulators /Dampers/conductor fittings etc in Mechanical transport
Erection and Stringing of Emergency Restroration System(ERS)
Erection of Emergency Restroration System(ERS) complete in all aspects as per requirement at site including articulated base (Gimbal), mast sections, box sections, guy plates/swivels, bolts, & nuts etc.
Stringing of Emergency Restroration System(ERS) complete in all aspects as per requirement at site with ACSR Zebra Conductor
Stringing of Emergency Restroration System(ERS) complete in all aspects as per requirement at site with Panther Conductor
Store handling:
Unloading / Loading of T&P Material(i.e Four Sheaves pulley ,Pulleys ,Ropes ,Compression machine etc) for Transmission Line works in divisional stores narwal/bhatindi including manual carriage within store yard by way of sorting and its checking
Unloading / Loading of Emergency Restoration System (ERS) T&P Material( i.e. articulated base (Gimbal), mast sections, box sections, guy plates/swivels, bolts, & nuts etc.) for Transmission Line Restoration works in divisional stores narwal/bhatindi including manual carriage within store yard by way of sorting and its checking
Unloading / Loading of Cement in divisional store narwal/bhatindi including manual Carriage within store yard).
Unloading / Loading of Crates in divisional store narwal/bhatindi including manual Carriage within store yard).
Unloading / Loading of Disc Insulators/Fittings in divisional store narwal/bhatindi Including manual Carriage within store yard) by way of sorting and its checking for breakage.
Unloading / Loading of ACSR/Panther conductor etc in divisional store narwal/bhatindi Including manual Carriage within store yard) by way of sorting,unreeling from the drum and its checking.
Sorting of tower members in the divisonal store and its stacking at proper place including its manual carriage within store yard.
Unloading / Loading of Iron material such as Tar steel / MS angle/MS Flat etc in divisional store narwal/bhatindi Including manual Carriage within store yard) by way of sorting and its checking.
PVC panelling of wall
Mechanical Carriage of T&P and other allied material from divisional store to site of work and back carriage of T&P
Average distance upto 40Km
Average distance upto 60Km
Average distance upto 80Km
Average distance upto 200Km
Average distance upto 300 Km
Average distance upto 400 Km
Mechanical Carriage of Emergency Restoration System(ERS)T&P and other allied material from divisional store to site of work and back carriage of T&P
Average distance upto 40Km
Average distance upto 60Km
Average distance upto 80Km
Average distance upto 200Km
Average distance upto 300 Km
Average distance upto 400 Km
Description of Work / Item(s)
Auto-Transformers/Power Transformers :- A) Checking of Auto starting of fans, External cleaning of radiators,oil pumps, ONAF/OFAF cooling,Cleaning and checking of marshalling boxes of transformer and OLTC, (ii) Tightening of terminations, Checking of OLTC driving mechanism, Electrical checking/ testing of pressure relief device, Buchholz relay, OLTC surge relay/ checking of alarm/ trip and checking/ replacement of the gaskets of the terminal box, Checking / Tightning of earthing connections, Checking of earth resistance of Neutral, Replacement of Silca Gel of breathers and oil toping of transformers and tightning of bushing clamps on HV/IV/LV sides of Auto transformers and Power transformers. Checking of space heater and illumination,etc. required as per schedule of maintenance.B199
160 MVA , 220/132 KV
160 MVA , 220/66 KV
50 MVA , 220/132 KV
50 MVA , 132/33 KV
Replacement of Silca Gel of breathers and oil toping of transformers (upto 160MVA).
Routine Maintenance of Auxilliary Transformers including checking of gaskets,checking and tightening of earthing connections,tightening of bushing clamps,replacement of Silica Gel if needede etc
630KVA, 11/0.433 KV Auxilliary Transformer
250KVA, 33/0.440 KV Auxilliary Transformer
Draning/ De-sludging of oil of transformers
Filling of oil, filtration and dehydration of transformer including carriage of filteration plant to be provided by the Department.
Reparing of cooling fans of transformers including replacement of damaged winding, bearing etc.
Lifting of top lid of power transformer for complete physical inspection & replacement of gaskets.
Replacement of damaged core bolts/Earthing strip etc.
Testing of Transformer:-
Tandelta testing of bushing/ winding and winding resistance of Transformer.
SFRA testing including arrangement of KIT by successful bidder.
Turn Ratio testing of Transformer.
IR Testing
BDV testing of transformer oil
Low voltage testing:
Magnetic balance test
short circuit test
DGA and PPM of Transformer from accredited laboratories (it include cost of collection of sample from site, its delivery to the testing labortary and depositing back the sampling bottle)
Replacement of damaged/outlived bushing having high tan delta including crane/ mechanical equipment if required.
220 KV Bushing
132 KV Bushing
66 KV Bushing
33 KV Bushing
11 KV Bushing
VCB/SF6 Checking of gas pressure drop during duty cycle operation check, Checking of auto-starting /pressure switch setting,etc, Checking of operation of safety valve, Cleaning of breaker units, checking of protection equipments and replacement of defective ones, i.e., complete inspection and testing of SF6/MOCB type circuit breakers inclusive of operating mechanism. Checking of driving mechanism, trip/closing circuits/ checking of spring charge motor and checking of tripping and closing coils. checking of equipment earthing and strucure earthing. Maintaning gas levels, venting of circuit breakers, replacement of o-rings , gas kets including circuit breaker analysis by Circuit breaker analyser. Checking of space heater and illumination. Required as per schedule of maintenance
220KV SF6 Breaker
132KV SF6 Breaker
66 KV SF6 Breaker
33 KV VCB
Installation, testing and commissioning of CT/PT including making connection at secondary winding and in M.K box.
Testing: VCB/MOCB/SF6 Testing of SF6/VCB/MOCB type circuit breakers by Circuit breaker analyser Test kit.
220KV SF6 Breaker
132KV SF6 Breaker
66 KV SF6 Breaker
33 KV VCB
Replacement of damaged/defective pole of the circuit Breaker after thorough inspection.
220KV SF6 Breaker
132KV SF6 Breaker
66 KV SF6 Breaker
33 KV VCB
Replacement of damaged/defective operating mechanism box of the circuit Breaker after thorough inspection.
220KV SF6 Breaker
132KV SF6 Breaker
66 KV SF6 Breaker
33 KV VCB
CVT's /CT's /PT's :- Visual checking of earthing HF point (in case it is not being used for PLCC,Checking of any breakage or cracks in porclean insulator, Cleaning of CVT capacitor stacks and tightness of terminal connections,Checking and tightness of all connections including earth connections.Checking of healthiness of gaskets, Checking of neutral earthing in CVT, healthiness of all gaskets and oil level and its topping if needed. Releasing of gas pressure if any.
CVT's /CT's /PT's :- Measurement of IR value and tightening of all connections and droppers.
CVT's /CT's /PT's :- Primary injection test of CT/PT and tightening of all connections and droppers.
Dismantalling of CT/PT including its carriage
Surge Arrestors :- Testing of counters and leakage current meters, Cleaning of insulators, Checking of earth connections between surge arrester,surge monitor and earth, Checking of leakage current after cleaning of porcelain surface, cleaning of LA insulators. Measurement of IR value and tightening of droppers.
Surge Arrestors :- Checking of leakage current(third harmonic resistive current)
Replacement of damaged Surge Arrestor
Isolators :- Checking of moving/fixed contacts, Cleaning of auxiliary switch contacts and greasing with silca grease, cleaning of support insulators, termination contacts, checking of electrical / mechanical interlocks with E/S and CB, mounting bolts, alignment, nuts, pins, auxiliary contacts, alignment of earthing blades, operation of earth switch, almunium / copper flexible conductor, earth connections of structures and MB. lubrication of operating mechanism, hinges lock joints, levers, bearings, main contacts, cleaning of post insulators, tightening of clamps.
Replacement of damaged Isolators.
Reparing of Three phase motors of isolators.
Droppers/Jumpers Replacement of damaged / burnt droppers or jumpers of isolators/ breakers/transformers /CT/PT etc. 220/132/66/33/11 KV Yard.
Clamp: Replacement of damaged/burnt PG/ PAD/T/CT/Bushing clamp/spacers etc
Post Insulators :- Checking of insulators for cracks and cleaning of insulators.
Post Insulators :- Replacement of damaged/cracked Post Insulators.
Replacement of damaged Disc Insulators when lowering of conductor is necessary.
Replacement of LED in the outdoor switch yard
Replacement of LED/CFL along with fitting in the control room/ division building/office complex
Battery Bank: Checking and cleaning of battery cell terminals, application of petroleum gelly/anti rust spray if required and Checking of positive/Negative earth fault of dc.Terminal tightening.
Battery Bank: conduction of battery impendence test and discharge test checking voltage temperature, current, terminals voltage of individual cells, battery discharge testing etc.
Battery Charger :- Checking of control cards, measurement of test point voltage values, testing of DC earthfault and U/V relays, IR measurement of charger transformer, checking of earthing etc. Checking of charger panel / DCDB for electrical connections, cleanliness etc.
Protection System :- Checking of relays and application of CCl4 for cleaning, replacement of worn out / defunct relays, checking and replacement of control wiring, if required, primary & secondery injection testing,software settings etc.
Cleaning of cable trenches/ ducts including disposal of malba outside the premises of Grid Station.
sub main
Dressing of cables on trays/racks including repairing of trays/racks if required.
sub main
Repairing of damaged cable duct covers.
sub main
Gantry Columns and Beams :- Tightening of all nuts / bolts and providing of missing nuts / bolts and replacement of damaged members if required.
L.T. Transformer :- Testing of oil BDV, IR measurement, Testing /checking of OTI,WTI and Buchholz (if provided, Checking of healthiness of Pressure relief diaphragm, Checking healthiness of Buchholz relay.
L.T. Panel: Cleaning of panels,bus bar insulators etc. Relays Testing, Tightning of all electrical connections,Checking of indicating meters ,Check for change-over facility, if provided,Check operation /indications in OFF Load condition of MCCB,
Earthing Mat :- Measurment of earth resistivity, checking of electrical continuity of equipment earthings, tightening of earthing connectors, removal of rust from bolted earth connectors and tightening and additional earthing wherever required.
220/132 kV Transformer including allied equipment
220/66 KV Transformer including allied equipment
132/33 KV Transformer including allied equipment
Replacement/repairing of Earthing of various Equipments.
DC Distribution Board :- Checking of connections, wiring, replacement of wiring if needed and checking of healthiness of all D/C and dc circuits of 220/132/66/33/11 KV yards
AC Distribution Board :- Checking of connections, wiring, replacement of wiring if needed, fuses, MCB, bus bar CT, relays, MFM, LT switchs etc and checking of healthiness of all connections and AC circuits of 220/132/66/33/11 KV yards
Control cables:- Replacement of damaged/outlived/burnt control cables of different cores icluding proper ferruling, thimbling and tagging and finally with all appropriate connections including lifting of duct covers
below 10 core
above 10 core
Marshelling kiosk:- checking and replacing if required of all Terminal blocks, space heaters, light illumination, checking of all connnections and its cleaning. Fixing of cable glands earthing and checking of all other electrical accessories. Fixing of damaged hinges/locks(including their cost if any) if required and plugging of holes if any.
BUS BAR :- Replacement of damaged ACSR Conductor along with its fittings.
220 KV yard
132 KV yard
66 KV yard
33 KV yard
Automatic voltage regulator:- checking and tightening of connections, auto control unit, oil and its overhaulling
Diesel Generator set: Maintenance and checking of its operation.
Diesel Generator set: overhauling of DG set including all material required for it.
Deweeding of switch yard
Painting of outdoor equipments (Transformers, MK's, CT/PT/CVT, Protection wall, Circuit breaker, isolators, poles etc.
AC/FC Units: Checking and Servicing of Installed AC unit inside control room (1- 3 Ton)
White-Washing of Control Room/Residencial Quarters/Office building at Grid Station.
Upkeep of Sanitary installed in the control room/ office building/division building/residential quarters/Toilets and replacement of any damaged item if required.
Upkeep of electrical accessories installed in the control room/ office building/division building/residential quaters/Toilets and replacement of any damaged item if required.
Store handling:
Unloading / Loading of C&R Panels, in divisional store Bhatindi Including manual Carriage within store yard).
Unloading / Loading of Angle iron, Tor steel , Tower material in divisional store Ambedkar Chowk/Bhatindi Including manual Carriage within store yard).
Unloading / Loading of CT/CVT/PT/CB/LA etc in divisional store Ambedkar Chowk/Bhatindi Including manual Carriage within store yard).
Carriage of T&P and other allied material from divisional store to the site of work and back carriage of T&P
From Divisional Store to Grid Station Barn (Average distance 25 Kms)
From Divisional Store to Grid Station IGC Samba (Average distance 45 Kms)
From Divisional Store to Grid Station Battal-Manwal (Average distance 75 Kms)
From Divisional Store to Grid Station Katra (Average distance 60 Kms)
Sorting, loading, unloading and weight measurement of Iron sorts such as MS angle/flat Tor steel/tower material etc at Divisional store.
Loading and unloading of CT/PT/LA of 220 KV level at Divisional store.
Loading and unloading of CT/PT/LA of 132 KV level at Divisional store.
Loading and unloading of CT/PT/LA of 66 KV level at Divisional store.
Loading and unloading of CT/PT/LA of 33 KV level at Divisional store.
Sorting, loading, unloading and length measurement of ACSR Moose at Divisional store.
Sorting, loading, unloading and length measurement of ACSR Zebra at Divisional store.
Sorting, loading, unloading and length measurement of ACSR Panther at Divisional store.
Sorting, loading, unloading and length measurement of control cable of sorts at Divisional store.
Foundation:- Repairing of damaged foundation/top sealing including material.
Repairing of protection wall(Revetment) including back filling of earth with RR Masonry including material
Providing/Laying of RCC concreating including material.
Repairing of RCC concreating including material.
Earth work in excavation in all kinds of soil
Backfilling of good earth in the tower platform or behind the protection wall whereever required
Removal of rank vegetation/jungle clearance/bush cutting inside the Grid periphery
Cleaning of drains by removing of silt/mulba etc
Repairing of Doors/Windows including material
Repairing of chail link mesh fensing including material
Painting to chain link mest fensing including material
Berm dressing along road inside grid's periphery
Cleanings of water tanks underground/overhead tankies
Repair to plaster whereever required including material
Painting/color washing to walls/doors/windows including material
Repair to sanitary fittings including material
Replacing damaged glass pans including providing fixing same
M/S DAYAL BUILD TECH (BID ID -2360552)
M/S RAJ ELECTRICAL CONTRACTOR (BID ID -2360515)
M/S SWASTIC ELECTRICAL CONTRACTOR AND SUPPLIERS (BID ID -2360566)
SAI ENGINEERING AND CONTRACTOR (BID ID -2360111)
Patiaya Enterprises (BID ID -2360226)
M/s GCS Associates (BID ID -2359592)
M/S KUNDAL ELECTRICAL WORKS AND SUPPLIERS (BID ID -2359953)
M/s Wazir Agencies (BID ID -2356247)
M/S RAJ ELECTRICAL CONTRACTOR (BID ID -2360515)
M/S DAYAL BUILD TECH (BID ID -2360552)
SAI ENGINEERING AND CONTRACTOR (BID ID -2360111)
M/S SWASTIC ELECTRICAL CONTRACTOR AND SUPPLIERS (BID ID -2360566)
Patiaya Enterprises (BID ID -2360226)
M/S KUNDAL ELECTRICAL WORKS AND SUPPLIERS (BID ID -2359953)
M/s GCS Associates (BID ID -2359592)
M/s Wazir Agencies (BID ID -2356247)
M/S RAJ ELECTRICAL CONTRACTOR (BID ID -2360515)
M/S DAYAL BUILD TECH (BID ID -2360552)
M/S SWASTIC ELECTRICAL CONTRACTOR AND SUPPLIERS (BID ID -2360566)
Patiaya Enterprises (BID ID -2360226)
SAI ENGINEERING AND CONTRACTOR (BID ID -2360111)
M/S KUNDAL ELECTRICAL WORKS AND SUPPLIERS (BID ID -2359953)
M/s GCS Associates (BID ID -2359592)
M/s Wazir Agencies (BID ID -2356247)
Bidder Name
M/S DAYAL BUILD TECH
M/S RAJ ELECTRICAL CONTRACTOR
M/S A A ENTERPRISES
Restoration of snapped power conductor(per phase). Complete job including mid-span compression joint, laying of conductor, rough sagging, tensioning of conductor dead-end assembly etc. upto span of 500 metres.
Branch cutting under the corridor of transmission line
Low voltage testing:
Maintaining the adequate spacing between the two consecutive conductors by way of adding or pull out the disc insulators from the Disc insulators string
DGA and PPM of Transformer from accredited laboratories (it include cost of collection of sample from site, its delivery to the testing labortary and depositing back the sampling bottle)
Tension String
Replacement of Silca Gel of breathers and oil toping of transformers (upto 160MVA).
M/S A A ENTERPRISES
Jumpers (Replacement of burnt/damaged jumpers and tightening of remaining jumpers on the same tower)
Filling of oil, filtration and dehydration of transformer including carriage of filteration plant to be provided by the Department.
M/S RAJ ELECTRICAL CONTRACTOR
M/S DAYAL BUILD TECH
Restoration of snapped earthwire complete job including mid-span compression joint, laying of conductor, rough sagging, tensioning of earthwire, dead-end assembly etc. upto span length of 500 metres
160 MVA , 220/132 KV
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .