Tender Value
Refer Docs
EMD Value
₹6.5 L
Closing Date
21 Apr 2026, 12:00 pmClosed
SE BSRO PWD BULANDSHAHR
SE BSRO PWD BULANDSHAHR
Construction of a culvert and approach road at Harauda kothi Gande Nala to Khagoi Road in Hapur district
2026_CEMRT_1137425_2
3288/96M /E-TENDER/BSR CIRCLE/2025-26 Dated 21.03.2026
Open Tender
Civil Works - Bridges
Percentage
180 days
HAUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹6.5 L
Yes
2 Jun 2026
16 Apr 2026
21 Apr 2026
16 Apr 2026
21 Apr 2026
16 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling reinforced cement concrete or reinforced brick work including stacking of materials as directed by the Engineer-incharge within a distance of 60 metre (200 feet). (As per SOR No-694) rates are including supply of all material, labour, T&P all taxes royalty,labour cess etc. required for proper completion of work as per direction by the Engineer In-charge but excluding the cost of GST | - | cum | - | - |
| 2 | Dismantling brick work or stone work in lime or cement mortar and including stacking of materials as directed be the Engineer-incharge within a distance of 60 meter (200 feet). (As per SOR No-692) rates are including supply of all material, labour, T&P all taxes royalty,labour cess etc. required for proper completion of work as per direction by the Engineer In-charge but excluding the cost of GST | - | cum | - | - |
| 3 | Excavation for roadwork in soil with hydraulic excavator of 0.90 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000 m as per Technical Specification Clause 302.3 rates are including supply of all material, labour, T&P all taxes royalty,labour cess etc. required for proper completion of work as per direction by the Engineer In-charge but excluding the cost of GST | - | cum | - | - |
| 4 | Providing concrete for Plain/Reinforced cement (PCC M15) concrete in open foundation complete as per drawing and technical specifications Clauses 802,803,1202&1203 Sr No. 11.4 Ref No.800 & 1200 rates are including supply of all material, labour, T&P all taxes royalty,labour cess etc. required for proper completion of work as per direction by the Engineer In-charge but excluding the cost of GST | - | cum | - | - |
| 5 | Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. rates are including supply of all material, labour, T&P all taxes royalty,labour cess etc. required for proper completion of work as per direction by the Engineer In-charge but excluding the cost of GST | - | cum | - | - |
| 6 | Providing concrete for Plain/Reinforced cement concrete (M25) in open foundation complete as per drawing and technical specifications Clauses 802,803,1202&1203 Sr No. 11.4 Ref No.800 & 1200 including necessary centering and shuttering etc.complete rates are including supply of all material, labour, T&P all taxes royalty,labour cess etc. required for proper completion of work as per direction by the Engineer In-charge but excluding the cost of GST | - | cum | - | - |
| 7 | Providing concrete for Plain/Reinforced cement concrete (M-25) in sub structuren complete as per drawing and technical specifications Clauses 802,803,1202&1203 Sr No. 12.5 Ref No.800 including necessary centering and shuttering etc.complete rates are including supply of all material, labour, T&P all taxes royalty,labour cess etc. required for proper completion of work as per direction by the Engineer In-charge but excluding the cost of GST | - | cum | - | - |
| 8 | Providing concrete for Plain/Reinforced cement concrete (M25) in super structure complete as per drawing and technical specifications Clauses 802,803,1202&1203 Sr. No. 13.1 Ref. No. 800 including necessary centering and shuttering etc.completerates are including supply of all material, labour, T&P all taxes royalty,labour cess etc. required for proper completion of work as per direction by the Engineer In-charge but excluding the cost of GST | - | cum | - | - |
| 9 | Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 Sr. No. 13.2 Ref. No. 1000 rates are including supply of all material, labour, T&P all taxes royalty,labour cess etc. required for proper completion of work as per direction by the Engineer In-charge but excluding the cost of GST | - | MT | - | - |
| 10 | Supply & Fixing of 100 mm dia Drainage Spouts of MS with gratings as per drawing rates are including supply of all material, labour, T&P all taxes royalty,labour cess etc. required for proper completion of work as per direction by the Engineer In-charge but excluding the cost of GST | - | Nos | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.02 MB
Tendernotice_2.pdf
PDF • 1.95 MB
Tendernotice_3.pdf
PDF • 1.94 MB
BOQ_2124006.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .