Loading…
Loading…
Tender Value
₹2.0 Cr
EMD Value
₹4.1 L
Closing Date
8 Jul 2026, 11:00 am
Similar tender results from the same govt authority in the past 3 years.
OHE related work for Conversion of Gaushala halt into 3 line crossing station in Izzatnagar Division.
SRDEE-TRD-IZN-2026-27-T08
SRDEE-TRD-IZN-2026-27-T08
Open
12 Months
Bareilly, Uttar Pradesh
₹0
₹4.1 L
15 Jun 2026
15 Jun 2026
24 Jun 2026
Item Breakup - 01-SOR ITEMS
Per Track Erection KM Marking/painting of temperature & 'Y'- Measurement of OHE mast at BWA locations
Each Supply without insulator and erection of material for termination of Single conductor of Over head equipment or terminating wire.
Each Supply without Insulator and erection of cut-in (9Tonne) Insulator
Each Supply without Insulator and erection of 25 kV Post Insulator
Each Supply, Erection, oil- filtration, testing and commissioning of L.T. supply transformers (25 kVA).
Each Supply without Insulator & erection of 25 kV D.O. fuse switch.
Each Modification to erected equipment's:- Transfer of equipment from one mast or support to another.
Each Modification to erected equipment's:- Provision of an additional bracket assembly/ assemblies on a mast or support. IZZATNAGER DIVISION-ELECTRICAL/NORTH EASTERN RLY
Each Modification to erected equipment's:- Dismantling of overhead equipment.
Kilometre Modification to erected equipment's:- Splicing & extension of an anchored overhead equipment.
Each Unloading of all type of Steel Structures.
MT Loading of all type of Steel Structures.
MT Unloading of all type of Copper & Aluminium conductors.
MT Loading of all type of Copper & Aluminium conductors.
MT Total 282155.08 Item- 02 Extra on erection for work done under power block and manual work for section-1 (General) S No. Item No Description of Item Unit Qty Rate Amount Supply without insulator and erection of material for termination of Single conductor of Over head equipment or terminating wire.
Each Supply without Insulator and erection of cut-in (9Tonne) Insulator
Each Supply without Insulator and erection of 25 kV Post Insulator
Each Supply, Erection, oil- filtration, testing and commissioning of L.T. supply transformers (25 kVA).
Each Modification to erected equipment's:- Transfer of equipment from one mast or support to another.
Each Modification to erected equipment's:- Provision of an additional bracket assembly/ assemblies on a mast or support.
Each Modification to erected equipment's:- Dismantling of overhead equipment.
Kilometre Modification to erected equipment's:- Splicing & extension of an anchored overhead equipment.
Each Total 70942.00 Item- 03 SECTION-2 (Concrete) S No. Item No Description of Item Unit Qty Rate Amount In other than hard soil and rock (for concrete mix of M 10 and M 15 Grade in Foundation)
cum Total 811800.00 Item- 04 SECTION-3 (Ferrous) S No. Item No Description of Item Unit Qty Rate Amount IZZATNAGER DIVISION-ELECTRICAL/NORTH EASTERN RLY S u p p l y and erection of fabricated and galvanised structures (O,N & R type portals) with all necessary components other than masts.
MT ( 50% Extra for work done manually )
MT Supply and erection of Structure steel (traction masts) fabricated and galvanised of all Type : B-Series Mast.
MT ( 50% Extra for work done manually ) Supply & Erection of special fabricated and galvanised steel structures other than Portals & traction- Masts not covered under items 3(b) (i) & 3(b)(ii).
MT ( 50% Extra for work done manually )
MT Supply only of fabricated steel other than masts
MT Supply and erection of a Guy Rod Assembly
Each Supply without insulator and erection of Single bracket assembly.
Each Supply and erection of Regulating Equipment (3-Pulley type) with counter weight assembly for conventional/ composite OHE.
Each Supply without Insulator and erection of materials for termination of Double conductor.
Each Supply without Insulator and erection of anticreep with galvanized steel wire.
Each Supply and erection of a structure bond.
Each Supply and erection of a longitudinal bond
Each Supply & erection of a transverse and special bond.
Each Supply & erection of a single earth electrode.
Each IZZATNAGER DIVISION-ELECTRICAL/NORTH EASTERN RLY Supply and erection of anticlimbing device for L.T. Supply Transformer Stations.
Each Total 4599868.42 Item- 05 Extra on erection for work done under power block and manual work for SECTION-3 (Ferrous) S No. Item No Description of Item Unit Qty Rate Amount S u p p l y and erection of fabricated and galvanised structures (O,N & R type portals) with all necessary components other than masts.
MT Supply and erection of Structure steel (traction masts) fabricated and galvanised of all Type : B-Series Mast.
MT Supply & Erection of special fabricated and galvanised steel structures other than Portals & traction- Masts not covered under items 3(b) (i) & 3(b)(ii).
MT Supply and erection of a Guy Rod Assembly
Each Supply without insulator and erection of Single bracket assembly.
Each Supply and erection of Regulating Equipment (3-Pulley type) with counter weight assembly for conventional/ composite OHE.
Each Supply without Insulator and erection of materials for termination of Double conductor.
Each Supply without Insulator and erection of anticreep with galvanized steel wire.
Each Total 242561.39 Item- 06 SECTION-4 (Non-Ferrous) S No. Item No Description of Item Unit Qty Rate Amount Supply and erection of span wire.
Metre Supply and erection of Over Head equipment only
Kilometre Extra on item 6(az) for supply and erection of additional fittings at a turn-out, diamond crossing or overlap
Each Supply without Insulator & erection of a section insulator assembly
Each Supply without Insulator and erection of a 25 KV single pole isolator without earth contact assembly.
Each IZZATNAGER DIVISION-ELECTRICAL/NORTH EASTERN RLY Extra for supply & erection of an earth contact assembly in an Isolator.
Each Supply & erection of large copper jumpers
Each Supply & erection of small copper jumpers
Each Supply and erection of copper strips for equipment earthing.
Metre Supply & erection of Solid copper bus-bars 18mm.:
Metre Supply & erection of solid copper bus-bar connectors: Bus terminal (6310)
Each Total 599734.00 Item- 07 Extra on erection for work done under power block and manual work for SECTION-4 (Non-Ferrous) S No. Item No Description of Item Unit Qty Rate Amount Supply and erection of span wire.
Metre Supply and erection of Over Head equipment only
Kilometre Extra on item 6(az) for supply and erection of additional fittings at a turn-out, diamond crossing or overlap
Each Supply without Insulator & erection of a section insulator assembly
Each Supply without Insulator and erection of a 25 KV single pole isolator without earth contact assembly.
Each Supply & erection of small copper jumpers
Each Supply & erection of Solid copper bus-bars 18mm.:
Metre Supply & erection of solid copper bus-bar connectors: Bus terminal (6310)
Each Total 75144.00 Item- 08 SECTION-5 (Insulator) S No. Item No Description of Item Unit Qty Rate Amount Supply of Insulators for item 4(a)(i) & 4(a)(iii)- Stay Arm Porcelain (CD-1050 mm)
Each Supply of Insulators for item 4(a)(i) & 4(a)(iii)- Bracket Porcelain (CD-1050 mm)
Each IZZATNAGER DIVISION-ELECTRICAL/NORTH EASTERN RLY Supply of 9-Tonne insulators for item 8(b)(i), (ii), (iii), (vi), (vii), (viii) & (ix)-Porcelain (CD- 1050 mm)
Each Supply of 9-Tonne insulators for item 9(a), (b), (c), (d) & (e)- Porcelain (CD-1050 mm)
Set Supply of 9-Tonne Insulator for item 11(a)(i) & 11(a)(ii)- Porcelain (CD-1050 mm)
Each Supply of 25 kV Post Insulator for Item 11 (b)
Each Supply of 9 Tonne and Sectioning Insulators for item No.12(a)- Porcelain 9-Tonne (CD-1050 mm) & Sectioning Insulator
Set Supply of Post & Operating rod insulators for item 13(a)
Set Supply of Post insulators for item 28
Set Total 497652.89
Item Breakup - 02-NON-SOR
Fabrication, Supply diagram board.
Dismantling & Removal of Mast, Portal, TTC & MT other small part steel.
Supply & erection of Electric Engine Stop Each Board.
Supply and erection of caution clearance to Numbers OHE nearby restricted" size 400x270x2mm, drawing No.RE/33/436, Mod-B or latest as per scope of work and explanatory note:
Supply and erection of section diagram board Numbers for operating control (size 3x 6 feet)
Supply and erection of section diagram board Numbers forTPC (size 4x 8 feet)
Dismantling of ATD & termination assembly
100% Extra for Dismantling termination assembly.
Dismantling & removal of OHE termination Each assembly.
Dismantling & removal of OHE termination Each assembly (100 % under power block)
Dismantling & removal of Guy Rod / Anchor Each assembly.
Dismantling & removal of Guy Rod / Anchor Each assembly (100 % under power block)
Supply of 25 KV AC OHE danger board/danger Numbers board for height gauge, public caution board and special boards
General caution board (enameled) for staff as Numbers per RDSO spec. No ETI/OHE/33(8/85) or latest.
Supply & erection of Retro-Reflective Sigma Numbers Sign Boards
Supply & erection of enamel type caution Numbers unwired turnout board size Numbers 10 998.60 9986.00 900*600*2 mm as per RDSO specs. No. ETI/OHE/33(8/85) or latest as per scope of work & direction of site-in-charge IZZATNAGER DIVISION-ELECTRICAL/NORTH EASTERN RLY
Dismantling of an Anticreep
Extra on erection for work done under Power Each Block for Dismantling of an Anteecreep
Dismantling of a 9 Tonne Insulators.
100% Extra for Dismantling of a 9 Tonne Numbers Insulators.
Supply of 160 sq mm different type of jumpers Metre
Erection of 160 sq mm different type of Metre jumpers
Extra on erection for work done under Power Metre Block for Erection of 160 sq mm different type of jumpers
Handling, Leading, Loading and transportation MT charges for Railway supply material from different railway site and released material from different railway site, if any to concerned TRD depot.
Erection of structure bonds on platform Numbers including drilling of holes in structure and rail including cutting of platform surface upto depth of 100 mm placing of bond and making good surface with PCC
Dismantling of foundation of RCC/MCC cement cum concrete anywhere in yard/block section upto required level for all heights.
Dismantling assembly
Supply of Contact Wire parallel groove clamp Numbers (RI 1031-3) complete with fasteners as per RDSO Drawing No ETI/OHE/P/1030-3, Rev-A or latest and RDSO Specification No TI/ SPC/OHE /FITTINGS /0130 with A & C Slip No or latest.
Supply of Terminal Connector 19 mm Multiple Numbers hole (Bolted type) conforming to RDSO Specification No ETI/OHE/P/1009 Rev-A and RI No 1009, 1009-1. Total 688394.61
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCC-2022withACSupto11.pdf GCC for works
ATTACHMENT
TDGuashalaT08.pdf
ATTACHMENT
GCC-2022withACSupto11.pdf
ATTACHMENT
Download all tender documents and submit your bid