| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.8 LAccepted-Finance | L1 | Accepted-Finance Admitted | |
| 2 | L2₹17.8 L+₹2,610.27 (0.15%)Accepted-Finance | L2 | Accepted-Finance Admitted |
Tender Value
₹18 L
EMD Value
₹18,000
Closing Date
26 May 2022, 3:00 pmClosed
The Panchayat President Bettamugulalalm
BDO Office Kelamangalam
Krishnagiri District Kelamangalam Block Under 15th Finance Commission 2020-2021 Construction of 30,000 Litres Capacity OHT 12 m Stagging at Bettamugulalam in Bettamugulalam(15 Nos FHTC) Panchayat Package No KLM 03
2022_RDTN_233250_1
RocNo_200_2021_A2_23_02_2021
Open Tender
Civil Works - Water Works
Item Rate
180 days
Kelamangalam
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹18,000
BDO Office Kelamangalam
27 May 2022
21 May 2022
26 May 2022
21 May 2022
26 May 2022
21 May 2022
24 May 2022
Amount
1.Construction of 30,000 Litres Capacity OHT (12 m Stagging) at Bettamugulalam H/o Bettamugulalam(15 Nos FHTC) Rs. 18.00 Lakhs
Earth work Excavation for Foundation in all soils and Sub Soil as per SS20B for foundation etc. complete.SS 20B
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with Standard specification.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Reinforced cement concrete 1:1.5:3mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete
Items 1.50 m to 4.50m below GL
Items 0 m to 1.50m below GL
Items 0.0 to 4.50m Above GL
Items Above 4.51m to 7.32 m
Items Above GL 7.33m to 10.98m
Items 10.98 m to 14.64 m above GL
14.64 m 18.30m above GL
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical
A)For Plan surface
Below GL
From 0.00 -3.30m
From 5.30m to 6.30 m
From 8.30m to 9.30m above G.L
From 11.30 m to 12.30m
B)Curved Surface
Upto 0-3.30m height
From 5.30m to 6.30 m
C)Square column
Below GL + Above GL 0 to 4.20
9.045 to 10.045m ht
10.98 to 11.60m ht
Cement Paint (NEW WALL) Two Coats with Approved Cement Paint over one prime coat of cement primer over plasterewd surface including cost and conveyance of materials and labour charges etc., complete 10.00 Sqm
Supplying and Fabricating and placing in position MS steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.
Supplying and Fabricating , delivery and placing in position MS steel Ladder wide 0.45m made out of 50 X50X6mm MS angle for side and steps in 16mm MS plain rods fixed at 30 cm c/c welded and jointed etc., Complete complying with stanard specification.
Provision For RCC Inner Access ladder for OHT
Reinforced cement concrete 1:1.5:3mix using 20mm HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete
Shuttering charges by using MS angle and MS Sheet
Steel Fabrication, Placing and fixing of steel including cost of Steel and Binding Wire etc., Complete
Hoisting the Inner access ladder and Fixing in Position as Directed by the Twad Board Officer
Fiber Reinforced Concrete Frame and Cover 600mm Dia FRC Man hole frame to Have clear opening of 600 mm dia to suit 600 mm dia cover as per IS 12592/2002, Part 1&2
Provision for pipe connection arrangements
50 mm dia GI Pipe for Outlet and Inlet Scour pipes
50mm dia GM Gate valve
63mmPVC Gate Valve
50 mm dia Flange set
50mm dia GI coupling
50mm dia GI Elbow
63 mm PVC Pipe,4ksc
90 mm PVC Pipe,6ksc
63 mm PVC Pipe,6ksc
50mm dia GI Pipe
50mm dia GI coupling
Earth work Excavation for Foundation in all soils and Sub Soil to full Depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.(90mm PVC Pipe and 63mm PVC Pipe)
laying and Joint
90mm PVC Pipe
63mm PVC Pipe
50mm PVC Pipe
Filling in Basement with excavated earth in layers of not more then 15cm. Thick well rammed , watered and consolidated complying with standard speacification etc., completed
Provision for Pipeline Arrangements
supply and fixing of 50mm GI Pipe Etc.,
50mm GI Coupling (Bore)
50mm GI Bend
50mm Gate Valve NRV
MS Bore Cap
MS Clampset
50 mm PVC FTA
7.50 H.P Motor( 50lpm X 125m)
7.5 H.P Three Phase panel board with Auto start
Supply and Fixing of 4Sqm Core Cable etc.,
Erection charge for borewell
63 Amps Fuse uint
MS Kiosk Panel Board (sub Estimate)
Cement concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete (KIOSK BASE)
Brick work in Cement mortor 1:5 mix using country brick of size 22 X 11 X 7 cm including cost and conveyance and all labour charges etc.,
Plastering with CM 1:5 Mix to 12 mm thick including cost and Conveyance and all Labour charges etc., Complete
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putt
Supply and Delivery of MS KIOSK of size 0.75m X 0.45m X 0.75m made up of MS angle size 50mm X 4mm Alround Covered with 16 guage MS Sheet and kisok door made up of MS paltes of size 25mm X 3mm including cutting, Welding , Grinding, Locking arrangements and Labour Charges Etc.,
Meter Board
Angle pipe
Service Wire
Locvk and Key
Transportation Charge 20-40 Km
Sleeve Wire
Provision for PVC ventilating arrangements Mosquito proof nylon net with 110mm PVC pipes and cowl as directed by departmental officers 2nos etc., all Complete
Provision for Sock Pit
Earth work Excavation for Foundation in all soils and Sub Soil as per SS20B for foundation etc. complete.SS 20B
Cement concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Brick work in Cement mortor 1:5 mix using country brick of size 22 X 11 X 7 cm including cost and conveyance and all labour charges etc.,
Supply and filling of 40mm HBG metal (jelly) including cost and coveyance and all labour charges etc., Complete
Supply and filling of sand as per Specification including cost and coveyance and all labour charges etc., Complete
Plastering with CM 1:5 Mix to 12 mm thick including cost and Conveyance and all Labour charges etc., Complete
Construction of Platform for Arround the Brace
Earth work Excavation for Foundation in all soils and Sub Soil as per SS20B for foundation etc. complete.SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Brick work in Cement mortor 1:5 mix using country brick of size 22 X 11 X 7 cm including cost and conveyance and all labour charges etc.,
Plastering with CM 1:5 Mix to 12 mm thick including cost and Conveyance and all Labour charges etc., Complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Construction of Platform for Fixing MS Welded Mesh
Earth work Excavation for Foundation in all soils and Sub Soil as per SS20B for foundation etc. complete.SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Towards Supplying and Fixing cost of mesh including cost and conveyance and all labour charges etc., Complete
Towards supplying and fixing of tying rod & Bar including cost and conveyance and all labour charges etc., Complete
Provision For Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
PM Construction
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .