Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Rejected-Technical | Rejected-Technical PQC NOT QUALIFIED |
Tender Value
₹4.9 L
EMD Value
₹5,000
Closing Date
28 Sept 2023, 12:00 pmClosed
SUPERINTENDENT ELECTRICAL
MILL OFFICE, URANIUM CORPORATION OF INDIA LIMITED, TURAMDIH MINES, PO-SUNDERNAGAR, JHARKHAND - 832107
Complete Rewinding, Overhauling and Repairing of burnt 3-Phase outdoor type 630 kVA, 6.6/0.433 KV Distribution Power Transformer of Turamdih Mill
2023_UCIL_166082_1
TMD/1004
Open Tender
Electrical Works
Works
120 days
TURAMDIH MILL
AS PER PQC DEFINED IN TENDER DOCUMENT
6 documents required · 6 mandatory
₹0
₹5,000
Yes
29 Nov 2023
30 Aug 2023
29 Sept 2023
30 Aug 2023
28 Sept 2023
30 Aug 2023
Complete Rewinding and Repairing of 630 KVA, 6600/433 Volts, 3-Phase Distribution Power Transformer of Make: Kirloskar and as per following:
Dismantling, Assembling, Oil filteration and testing: This shall include the following jobs including cleaning, maintenance and repair of buchholz relay, OTI, WTI etc., complete replacement of old/defective gaskets with new gaskets
Dismantling of Transformer
Removal of all parts and core.
Re-assembly after re-winding of transformer coils
Filling and filteration of transformer oil. (Test Certificates shall be provided)
Testing of Transformer (Magnetic Balance, Vector Group, Insulation Resistance and other routine tests as per IS:2026 shall be carried out on rewinded and repaired transformer. Test Certificates for the tests shall be provided)
Replacement of faulty meters and instruments (if required)
Replacement of damaged/defective HT/LT Bushings, Studs etc.
Painting of transformer
Rewinding of Primary (HV) Winding: This shall include the following jobs including cleaning, insulation, varnishing etc.
Removal of primary coils.
Taking measurments and making the forma.
Manufacturing of coils
Testing of coils.
Assembly and connection
Rewinding of Secondary (LV) Winding: This shall include the following jobs including cleaning, insulation, varnishing etc. and all other jobs complete in all respects.
Removal of Secondary coils.
Taking measurments and making the forma.
Manufacturing of coils
Testing of coils.
Assembly and connection
Supply of new Transformer Oil after replacement of Old (used) Transformer Oil from the 500 KVA Transformer. The new Transformer Oil shall confirm to IS:335 having BDV of 60 kV (min.) free from moisture, sludge etc. Make of Transformer Oil: APAR industries / POWEROIL / TRANSOIL / ARABIAN (SPL) only. Note: Transformer Oil shall be supplied in sealed non-retunable M.S. Drums of max. 210 litres capacity only. Transformer Oil shall be approved by UCIL prior to filling in our Transformer. Unused New Transformer Oil and Old Transformer Oil shall be retuned back to UCIL after filtration (in the M.S. Drums).
To and fro Transportation of 500 KVA Transformer (without dismantling of any part) from UCIL Turamdih premises to Contractor's Workshop and Back to UCIL Turamdih premises in Vehicle of Suitable Type, Size and Capacity. This shall be clearly mentioned in the offer
Bhagwati Enterprises
International Infrastructures
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .