Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.3 LAccepted-AOC DHARMAPADA DAS B CLASS DIPLOMA ENGG CONTRACTOR | ₹37.3 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹37.3 LSame as L1Rejected-AOC HOUSE NO 660 701 NADIKUL SAHI SIKHARPUR NEAR RADHAMAHADEB JEW TEMPLE POST NAYABAZAR DIST CUTTACK PIN 753004 | CUTTACK | CUTTACK | ODISHA | 753004 | ₹37.3 LSame as L1 | L2 | Rejected-AOC Rejected |
| 3 | L2₹37.3 LSame as L1Rejected-AOC APPOLO VIHAR CHANDRASEKHARPUR BBSR DIST KHORDHA | BHUBANESWAR | KHORDHA | ODISHA | ₹37.3 LSame as L1 | L2 | Rejected-AOC Rejected |
| 4 | L2₹37.3 LSame as L1Rejected-AOC | ₹37.3 LSame as L1 | L2 | Rejected-AOC Rejected |
| 5 | L2₹37.3 LSame as L1Rejected-AOC AT AT PO BASANDARA P S BIRIDI DIST JAGATSINGHPUR ODISHA | BHADRAK | ODISHA | 755007 | ₹37.3 LSame as L1 | L2 | Rejected-AOC Rejected |
Tender Value
₹37.3 L
EMD Value
₹38,000
Closing Date
18 Apr 2026, 5:00 pmClosed
Executive Engineer,Div-III
Bikash Bhawan,Jagannath Lane,Badambadi-753012
Construction of Uttampur crematorium in ward no-56
2026_ORULB_127693_9
MC(CMC)CTC_Div-IIINo1/2026-27
Open Tender
Civil Works - Others
Percentage
90 days
CMC
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,080
₹38,000
Yes
7 Jul 2026
7 Apr 2026
22 Apr 2026
7 Apr 2026
18 Apr 2026
7 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in Ordinary soil including dressing & levelling the bed & depositing soil within initial lead & lift. | 188.82 | Cum | 299.52 | ₹56,555.37 |
| 2 | Supplying & Filling in foundatin and plinth with sand watered and rammed including cost, conveyance, royalty&
labour etc. | - | Cum | - | - |
| 3 | Providing Cement Concrete (1:3:6) with 4 cm size Crusher Brocken hard granite metal including cost of all labour, materials with all taxes, lead, royalty T & P etc all complete. | - | Cum | - | - |
| 4 | Supplying all materials, labour, T&P for laying P.C.C (1:2:4) using 12mm size c.b.h.g chips including well curing cost of conveyance & royality taxes etc all complete as per specification and direction of the Engineer-In-Charge | - | Cum | - | - |
| 5 | R.C.C work in ground floor of M-20 grade with 20mm & down grade crusher broken hard Granite chips including hoisting & laying with cost of all labour, materials with all taxes, lead ,T & P etc all complete . | - | Cum | - | - |
| 6 | Plinth Beam (Wash Room)
Plinth Beam (Resting Shed)
Plinth Beam (Cremation) | - | Cum | - | - |
| 7 | Column Super Structure (Cremation Footing | - | Cum | - | - |
| 8 | Cremention Block (Lintel) | - | Cum | - | - |
| 9 | Washroom (Roof Beam) | - | Cum | - | - |
| 10 | Cremention Block (Roof Slab) | - | Cum | - | - |
stage.html
html • 0.07 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_587357.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.19 MB
BOQ_587357.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .