Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹75.8 LAccepted-AOC | 1 | Accepted-AOC L-1 | |
| 2 | 2₹79.9 L+₹4.2 L (5.49%)Rejected-Finance H NO 385 GALI NO 5 BASAI ENCLAVE PART 1 GURGAON 122001 | GURGAON | GURGAON | HARYANA | 122001 | 2 | Rejected-Finance L-2 |
| Sl No | Description | Qty | Unit | Nalin construction L1 | MANISHA CONSTRUCTIONS L2 |
|---|---|---|---|---|---|
| 1.00 | Good Earth for filling un-even land [HSR 3.1.2 plus 17.8.2 plus 17.8.3] | 384.47 | cum | 180 ₹69,204.6 Lowest | 400 ₹1,53,788 |
| 2.00 | providing and fixing of self priming monoblock pump 1 hp make cropton set complete work given head 6-45 metes, discharge 57-13 LPM complete in all respect as per satisfaction of engineer in charge | 1 | Each | 5,000 ₹5,000 Lowest | 25,000 ₹25,000 |
| 3.00 | `NS Supply, Erection,testing and
commissioning of 2 ton split AC
(daikin/Mistsubhishi/O General) including
cost of MS stand, steblizer and 9ft copper
pipe.` | 5 | Each | 55,000 ₹2,75,000 Lowest | 63,000 ₹3,15,000 |
| 4.00 | Analysis of Rate for Providing, Fixing, testing and commissioning of puffing 36W white 600x600mm bright LED panel downlight Complete in all respect. | 80 | Each | 1,800 ₹1,44,000 Lowest | 2,000 ₹1,60,000 |
Tender Value
₹84.2 L
EMD Value
₹1.7 L
Closing Date
18 May 2026, 10:00 amClosed
Mandeep Singh
Municipal Corporation MANESAR
Construction of Chaupal,Tin shed and boundary wal in village naharpur kasan, ward no-14, div-II, MC Manesar.- Retender
2026_HRY_520054_1
2026E61A7BD4 BE40 48E0 90E6 CF5638336E011809ULB
Open Tender
Civil Works
Works
360 days
Naharpur Kasan
2 documents required · 2 mandatory
₹5,000
₹1.7 L
Yes
22 Jun 2026
8 May 2026
18 May 2026
8 May 2026
18 May 2026
8 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Good Earth for filling un-even land [HSR 3.1.2 plus 17.8.2 plus 17.8.3] | 384.47 | cum | - | - |
| 2 | providing and fixing of self priming monoblock pump 1 hp make cropton set complete work given head 6-45 metes, discharge 57-13 LPM complete in all respect as per satisfaction of engineer in charge | 1 | Each | - | - |
| 3 | `NS Supply, Erection,testing and
commissioning of 2 ton split AC
(daikin/Mistsubhishi/O General) including
cost of MS stand, steblizer and 9ft copper
pipe.` | 5 | Each | - | - |
| 4 | Analysis of Rate for Providing, Fixing, testing and commissioning of puffing 36W white 600x600mm bright LED panel downlight Complete in all respect. | 80 | Each | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
BOQ_598943.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .