| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.6 LAccepted-AOC | L1 | Accepted-AOC Ok | |
| 2 | L2₹18.5 L+₹2.9 L (18.3%)Rejected-Finance | L2 | Rejected-Finance Rejected |
Tender Value
₹14.9 L
EMD Value
₹29,900
Closing Date
12 May 2022, 10:00 amClosed
Executive Engineer
Executive Engineer Pundri W/S Division Kaithal
Laying RCC pipeline of 450mm dia NP3 to Drain out the flood water of village Pundri from Fatehpur Minor tail of BML inlet at RD. 207500-L
2022_HRY_219905_1
3576-98/14-A dated 05.05.2022
Open Tender
Civil Works
Item-rate/Agreement basic
90 days
Kaithal
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
₹29,900
Yes
17 May 2022
7 May 2022
12 May 2022
7 May 2022
12 May 2022
7 May 2022
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. all kind of soil HSR 4.14.1
Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m: Pipes, cables etc. exceeding 300 mm metre dia but not exceeding 600 mmHSR 4.16.1.3
Providing lowering cutting jointing and testing RCC pipe class NP 3 as per 18-458-2003 with spigot & socketed joints manufactured with ISi marked sulphate resistance cement as per ISi 12330 with rubber rings ISi marked antiternmite as required at site in to trenches for all depths and laying out the same to correct alignment gradients and levels including dressing and trimming and cutting of concrete beds and side of trenches, if required jointing with rubber rings in trenches and jointing with 1: 3/2 cement sand mortar and with end dowels filled with 1: 3/2. cement sand mortar and finishing the joints at an angle of 45 degree with faces of spigot of socket joints cutting and finishing the cut surface to a uniform finish etc. as fully described in item No . 21.38, item 21.44, item 21.45, & item 21.46 including cartage loading and unloading complete in all respects. the internal diametric of the sewer being: 400mm dia HSR 21.95.3
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level 1:2:4 (1 cement : 2 coarse sand (zone-Ill) : 4 graded stone aggregate 20 mm nominal size): HSR 6.1.2
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement-All work up to plinth level: 1 : 1. 5: 3 ( 1 cement : 1. 5 coarse sand (zone-Ill): 3 graded stone aggregate 20 mm nominal size) HSR 6.14.1
Providing, hoisting and fixing above plinth level up to floor four level precast reinforced cement concrete in shelves, including setting in cement mortar 1 :3 (1 cement : 3 coarse sand), cost of required centering, shuttering and finishing with neat cement punning on exposed surfaces but , excluding the cost of reinforcement, with 1 :1.5:3 (1 cement : 1.5 coarse sand (zone-111) : 3 graded stone aggregate 20 mm nominal size). HSR 6.47
Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect above plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more.
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete HSR 6.30.1
Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. HSR 6.30.2
SHREE BALAJI EARTH MOVERS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .