| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.1 LAdmitted-Finance | -1.00% | ₹8.1 L | L1 | Admitted-Finance |
| 2 | L2₹8.2 L+₹4,099.66 (0.51%)Admitted-Finance 21 5 34 3 SADA SAGAR COLONY AYODHYA FAIZABAD 224123 | AYODHYA | FAIZABAD | UTTAR PRADESH | 224123 | -0.50% | ₹8.2 L+₹4,099.66 (0.51%) | L2 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹82,000
Closing Date
21 Aug 2026, 2:00 pmClosed
CE
Nagar Nigam Ayodhya
Udaya mandir ke nikat kanak bhawan ke pass sauchaley ka nirman karya as per Nit 17
2026_DOLBU_1175172_17
517/NNA/2026
Open Tender
Civil Works
Percentage
30 days
Ayodhya
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,150
MC
₹82,000
18 Sept 2026
7 Aug 2026
21 Aug 2026
7 Aug 2026
21 Aug 2026
7 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation in soil mixed with mooram, shingle etc including 1.5metre lift and 30metre lead etc. | 27.28 | Cum | 150 | ₹4,092 |
| 2 | P/L of Cement Concrete 1:4:8(1 cement, 4 fine sand, 8 brick ballast 40mm nominal size) including supply of all material, labour and T & P etc. required for proper completion of work and curing complete also including cost of formwork in foundation and floors. | 6.83 | Cum | 4,350 | ₹29,710.5 |
| 3 | First class B/W in 1:4 cement & fine sand including supply of all material, labour and T & P required for proper completion of work in foundation. | 13.73 | Cum | 5,270 | ₹72,357.1 |
| 4 | Reinforced Cement Concrete plinth beam in 1:2:4(1 cement, 2 coarse sand, 4 approved stone grit 20mm gauge) excludind supply of reinforcement and its binding but including its fixing and binding the same with 24 gauge wire and including necessary centering and shuttering etc. and also including supply of all material, labour and T & P etc. required for proper completion of work and curing complete finished to required templete as directed by Engineer-in-incharge. Binding wire cost being included in the item. | 2.05 | Cum | 8,854 | ₹18,150.7 |
| 5 | M150 Class brick work in superstructure in 9" wall in 1:4 cement and fine sand of 1.25 F.M. mortar including supply of all material, labour and T & P etc. required for proper completion of work and curing complete. | 17.31 | Cum | 5,951 | ₹1,03,011.81 |
| 6 | M150 Class brick work in superstructure in 4" wall in 1:4 cement and coarse sand of 1.25 F.M. mortar including supply of all material, labour and T & P etc. required for proper completion of work and curing complete | 3.31 | Cum | 6,081 | ₹20,128.11 |
| 7 | 12mm thick plaster with cement mortar in proportion of 1:4 cement & fine sand including supply of all material, labour and T & P etc. required for proper completion of work and curing complete | 141.59 | sqm | 155 | ₹21,946.45 |
| 8 | Local sand filling in plinth | 9.05 | Cum | 750 | ₹6,787.5 |
| 9 | S/F of verified tile at floor & walls | 109.07 | Cum | 1,490 | ₹1,62,514.3 |
| 10 | S/F of Iron ventilator with frame & all fittings for WC | 4.39 | qtl | 8,950 | ₹39,290.5 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.32 MB
BOQ_2208759.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .