Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹24.2 L
EMD Value
₹24,200
Closing Date
26 Oct 2026, 2:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
SE/GCC/SALEM
Superintending Engineer , TANTRANSCO, General Construction Circle, Salem - 636 014.
Providing take of Structure, Structural plinth, Periphery wall, Metal spreading over stone dust, water supply arrangements and allied Civil works for the Bay extension at existing Elanagar 110 / 22 KV SS.
2026_EB_712578_1
T.S.No.13/2026-27 of SE/GCC/Salem (GL)
Open Tender
Civil Works
Item Rate
120 days
ELANAGAR
AS PER BQR CONDITIONS
2 documents required · 2 mandatory
₹0
₹24,200
Yes
9 Oct 2026
9 Oct 2026
27 Oct 2026
9 Oct 2026
26 Oct 2026
9 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing of light jungle in 110 KV yard at existing Thorapadi 110 KV SS site | 750 | m2 | - | - |
| 2 | Dismantling of existing PCC concrete at Elanagar 110/22 KV SS with an all lead and lift,disposal as directed by the TANTRANSCO engineer at site etc., complete. | 12 | m³ | - | - |
| 3 | Earth work excavation for foundation including all labour charges including initial lead, lift, etc., complete. In Hard gravelly soil | 115 | m3 | - | - |
| 4 | Earth work excavation for foundation including all labour charges including initial lead, lift, etc., complete. In SDR (Not Requiring Blasting) | 33 | m3 | - | - |
| 5 | Earth work excavation for foundation including all labour charges including initial lead, lift, etc., complete. In Medium rock and dense medium rock not requiring blasting. | 9 | m³ | - | - |
| 6 | Earth work excavation for foundation including all labour charges including initial lead, lift, etc., complete. In Hard rock requires wedging & chessling | 9 | m³ | - | - |
| 7 | PCC 1:3:6 using 20 mm HBG metal for foundation without formwork including cost of approved cement all materials, labour, lead, lift,curing, consolidation etc., complete. | 16 | m³ | - | - |
| 8 | PCC 1:2:4 using 12 to 20 mm HBG metal Without form work including cost of cement all materials, labour, lead, lift, curing, consolidation etc. complete. | 105 | m³ | - | - |
| 9 | PCC 1:2:4 using 12 to 20 mm HBG metal With form work for plinth concrete including cost of cement all materials, labour, lead, lift, curing, consolidation etc. complete. | 8 | m3 | - | - |
| 10 | Fabrication of Template and assembling in correct position for various equipment plinth and grouting the foundation bolts including cost of all materials, labour, lead, lift etc. complete.as directed by the dept. Engineer at site | 56 | Nos. | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.10 MB
BOQ_855962.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .