Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹1.6 Cr
EMD Value
₹2.3 L
Closing Date
18 Dec 2023, 9:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Karnataka Forest Department
Raghu R
CONSTRUCTION OF ELEPHANT PROOF BARRICADING USING USED RAILS ALONG THE FOREST BOUNDARY IN KANAKAPURA RANGE AT AGALAKERE TO KARADIHALLA Ch 2.00 to 3.00 Km -1.00 Km
KFD/2023-24/OW/WORK_INDENT4199
KFD/2023-24/OW/WORK_INDENT4199
Open
Other Works
Two Tender Document System(Two Cover)
KFD DCF Territorial Division Office Ramanagara
4 documents required · 0 mandatory · 4 optional
Minimum financial turnover (civil engineering construction works) not less than two times the annual payments from this contract (Rs. xxxxx Lakhs)
Satisfactoriy completed (atleast 90%) as prime contractor at-least one such similar work of value not less than Rs. xxxxxxx (80% of estimated cost of tender)
Executed in any one year the following minimum quantities of work (Cement Concrete - xxxx cum, Earthwork - xxxx cum, etc) (80% of peak rate of construction)
Tenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Tenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Owning the following key and critical equipment for this work (xxxx, xxxx, xxxx)
Liquid assets and /or availability of credit facilities of no less than Rs. xxxxxx Lakhs (estimated cash flow for 3 months of peak construction period)
Total value of civl engineering works executed and payments received in the last five years (year-wise)
List of existing commitments and ongoing works
List of works for which tenders already submitted
Banker Details for reference
Construction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awarded
Reports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five years
Qualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awarded
List of Financial Resources with Certificates
The information to be filled in by the Tenderer hereunder will be used for purposes of computing Tender capacity as provided for in Clause 3 of the Instructions to Tenderers. This information will not be incorporated in the Contract
Work performed as Prime Contractor in the same name on works of similar nature over during the five years specified in 2 above
Quantities of work executed as prime contractor (in the same name) during the last five years specified in 2 above
Information on works for which Tenders have been submitted and works which are yet to be completed as on the date of Tender. a. Existing commitments and on-going works. b.Works for which Tenders already submitted
The following items of equipment are considered essential for successfully carrying out the works. The Tenderer should furnish all the information listed below
Qualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awarded
Name, address, and telephone, e-mail ID and fax numbers of the Tenderers bankers who may provide references if contacted by the Employer
Evidence of access to financial resources to meet the qualification requirement specified in ITT Clause 33 b Cash in hand, Letter of Credit etc. List them below and attach certificate from the Banker in the suggested format as under. This is to certify that M s is a reputed company with a good financial standing. If the contract for this work namely name of the work is awarded to the above firm, we shall be able to provide overdraft credit facilities to the extent of Rs to meet the working capital requirements for executing the above contract
Information on litigations in which the Tenderer is involved
Information on works for which Tenders have been submitted and works which are yet to be completed as on the date of this Tender. A. Existing commitments and on-going works
Each Tenderer should further demonstrate a.Availability of owning the following Key and critical equipment for this work like JCB, itachi.. etc
Copy of the Aadhar card, Copy of the Tin If any and Copy of GSTIN Copy of the GST Returns of past Three years Registration Certificate issued by Forest Department. Permanent Address, with Mobile No & Email ID For correspondence
Total value of civil engineering construction works executed and payments received in the last five years (attach Certificate from Chartered Accountants)
Reports on the financial standing of the tenderer, such as profit and loss statements and auditors report for the last five years
To qualify for award of this Contract each tenderer in its name should have in the last five years. a. chieved at least in two financial years a minimum financial turn over of R.. usually not less than the two times of estimated annual payments in this contract
Satisfactorily completed at least 80% of this contract, as a prime contractor for similar works such as of value not less than Rs Specify the similar work. the work done Certificate produced should be issued by not below the rank of Deputy Conservator of Forest and Executive Engineer i.e. Deistic level officer
Details of Sector-specific experienced manpower employed
Liquid assets and or availability of credit facilities of not less than Rs.. lakhs Credit lines letter of credit certificate from banks for meeting the fund requirement etc. usually 30 percent of the amount of contract) (Bankers Certificate format-2 is enclosed
Audit balance sheet for the last three financial years (i.e., 2018-19, 2019-20, 2020-21, 2021-22 and 2022-23) with copies of Income Tax returns statement filed. Otherwise tender will be rejected.
Tenderer Should Produce PWD Class I Contractor Certificate. Otherwise tender will be rejected
Works for which Tenders already submitted
₹3,900
₹2.3 L
4 Dec 2023
4 Dec 2023
19 Dec 2023
16 Dec 2023
16 Dec 2023
CONSTRUCTION OF ELEPHANT PROOF BARRICADING USING USED RAILS ALONG THE FOREST BOUNDARY IN KANAKAPURA RANGE AT AGALAKERE TO KARADIHALLA Ch 2.00 to 3.00 Km -1.00 Km
CONSTRUCTION OF ELEPHANT PROOF BARRICADING USING USED RAILS ALONG THE FOREST BOUNDARY IN KANAKAPURA RANGE AT AGALAKERE TO KARADIHALLA Ch 2.00 to 3.00 Km -1.00 Km
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Agalakere to karadihall 1km Sign Final.pdf
Others - Estimate • 3.58 MB
Tender Notification.pdf
Others - Tender notification • 8.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .