Loading…
Loading…
Tender Value
₹50,997
EMD Value
₹1,020
Closing Date
4 Aug 2026, 4:00 pm
EE/SWSD
Office of the Executive Engineer Siliguri W/S Division PHE Dte.
ANNUAL MAINTENECE FOR SANITARY AND PLUMBING WORK OF BAGDOGRA P.H.C. UNDER SILIGURI SUB DIVISION, P.H.E Dte.for the period of 365 days.
2026_PHED_1032452_78
PHE/SWSD/EE/NIeT-03 OF 2026-27 (SL.NO. 01 TO 82 )
Open Tender
CIVIL WORKS
Percentage
365 days
SILIGURI
As per BOQ
4 documents required · 4 mandatory
₹1,020
Yes
17 Jul 2026
17 Jul 2026
6 Aug 2026
17 Jul 2026
4 Aug 2026
17 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Removing sludge from septic tank, soak well etc. by methor labour including disposal of the same outside the compound as directed. | - | - | - | - |
| 2 | (a) Upto 20 users:-
(ii) Beyond a lead of 150 metre and outside the Municipal limit | 2 | Each | 2,159 | ₹4,318 |
| 3 | Cleaning soak pit by removing the top slab and replacing inner filling with jhama bats and repairing the pit as necessary including fitting the slab. | 2 | Each | 1,347 | ₹2,694 |
| 4 | Cleaning, scraping and removing sediment etc. from masonry urinal or through latrine seat including cleaning with acid by methor labour. | 2 | Each | 25 | ₹50 |
| 5 | Dismantling and refixing drain pipe including cutting trench and refillingthe same.
(i) Upto 100 mm | 20 | Mtr. | 70 | ₹1,400 |
| 6 | Cleaning rubbish, sludge, weeds scum, liquid earth, mud etc.etc.from road side masonary drain/ hume pipe drain/ culvert etc. by mathor labour after removing concrete.Slab/manhole cover etc.without damaging the same and refixing the same properly after cleaning as necessary and removing the sludge etc.etc.by using iron pans,buckets including all labour, tools & plants including removing the spoils in dry condition and disposing the same by truck beyond the road side in conformity with municipal/corporation rules for such disposal including loading into truck and cleaning the road side in all respects as per direction of the Engineerin-Charge.
(Payment will be made on the basis of actual stack measurment of spoils in dry condition at roadside) | 12 | Cum. | 289 | ₹3,468 |
| 7 | Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. (b) above 150 mm. thick
(2sides x 500.0 m x 0.25 m x 0.45 m) | 1.5 | Cum. | 1,417 | ₹2,125.5 |
| 8 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes.
(2sides x 700.0 m x 0.25 m x 0.45 m) | 1.5 | Cum. | 3,814.5 | ₹5,721.75 |
| 9 | Clearing compound premises of shurbs, plants, jungles etc. by cutting and removing as directed (Specific permission of Engineer-in-Charge prior to execution will be necessary).
(Payment to be made on area cleared) | 70 | Sqm. | 11 | ₹770 |
| 10 | Uprooting and removing plants from the surface of walls parapet etc and making good damages. (Repairing of damages to be paid separately).
(a) Small plant of girth of exposed stem upto 75 mm. lift upto 6 mtr | 20 | Each | 50 | ₹1,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.57 MB
Tendernotice_2.pdf
PDF • 0.96 MB
Tendernotice_3.pdf
PDF • 0.81 MB
Tendernotice_4.pdf
PDF • 0.29 MB
Tendernotice_5.pdf
PDF • 0.55 MB
Tendernotice_6.pdf
PDF • 0.30 MB
Tendernotice_7.pdf
PDF • 0.52 MB
Tendernotice_8.pdf
PDF • 0.57 MB
Tendernotice_9.pdf
PDF • 7.75 MB
BOQ_2536151.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].