| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹19.1 LAccepted-AOC | ₹19.1 L | 1 | Accepted-AOC L1 |
| 2 | 2₹19.1 LRejected-AOC | ₹19.1 L | 2 | Rejected-AOC L2 |
| 3 | Not Admitted-Fee/PreQual/Technical NRK PURAM 11 RAILWAY GATE UTHUKULI MAIN ROAD TIRUPUR | TIRUPPUR | TAMIL NADU | 638051 | - | - | Not Admitted-Fee/PreQual/Technical Others-Not intrestet in work |
| Sl No | Description | Qty | Unit | JAS.JOHNPETER L1 | VMS CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00CConstruction of 30000 Ltr OHT and laying of Pipe Line in @ Kadambavilagam in Kunnalur Panchayat. | |||||
| 2.00NEW 30000ltr OHT | |||||
| 3.00 | Earthwork excavation and deposting of bank at initial lead and lift including all labour charges etc.., completed( I depth) | 58.55 | Cum | 263 ₹15,398.65 | 300 ₹17,565 |
| 4.00 | Earthwork excavation and deposting of bank at initial lead and lift including all labour charges etc.., completed(II Depth) | 13.12 | Cum | 263 ₹3,450.56 | 300 ₹3,936 |
| 5.00 | Sand filling for platform including all material at worksite and labour charges etc.., completed | 8.75 | Cum | 2,554.59 ₹22,352.66 | 2,554.59 ₹22,352.66 |
| 6.00 | Cement concrete 1:4:8 using 40 mm DIA metal including cost and all labour charges and removing depris from the work site etc, complete., | 5.83 | Cum | 6,405.49 ₹37,344.01 | 6,405.49 ₹37,344.01 |
| 7.00Cement concrete ( M30)1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls , sides and bottom of the slabs, beams etc., shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. | |||||
| 8.00 | Raft beam | 13.52 | cum | 9,911.09 ₹1.3 L | 9,911.09 ₹1.3 L |
| 9.00 | For raft below 0.0-1.50m | 1.75 | cum | 9,911.09 ₹17,344.41 | 9,911.09 ₹17,344.41 |
| 10.00 | For raft below 0.0-4.50m | 2.83 | cum | 10,052.16 ₹28,447.61 | 10,052.16 ₹28,447.61 |
Tender Value
₹2.0 Cr
EMD Value
₹19,710
Closing Date
16 Dec 2025, 3:00 pmClosed
Block Developmen tOfficer(B.P), Muthupet Block
BlockDevelopmentOfficr(B.P), Muthupet Block
Construction of 30000 Ltr OHT and laying of Pipe Line in at Kadambavilagam in Kunnalur Panchayat in muthupettai block Tiruvarur District
2025_RDTN_630628_1
3421/2025/A2. Dt.09.12.2025
Open Tender
Civil Works - Buildings
Kunnalur
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹19,710
Yes
8 Jan 2026
10 Dec 2025
16 Dec 2025
10 Dec 2025
16 Dec 2025
10 Dec 2025
Amount
CConstruction of 30000 Ltr OHT and laying of Pipe Line in @ Kadambavilagam in Kunnalur Panchayat.
NEW 30000ltr OHT
Earthwork excavation and deposting of bank at initial lead and lift including all labour charges etc.., completed( I depth)
Earthwork excavation and deposting of bank at initial lead and lift including all labour charges etc.., completed(II Depth)
Sand filling for platform including all material at worksite and labour charges etc.., completed
Cement concrete 1:4:8 using 40 mm DIA metal including cost and all labour charges and removing depris from the work site etc, complete.,
Cement concrete ( M30)1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls , sides and bottom of the slabs, beams etc., shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Raft beam
For raft below 0.0-1.50m
For raft below 0.0-4.50m
For raft below 4.51 -7.32m
7.32 to 10.98m from GL
10.98 to 14.64 m from GL
14.64to 18.30m from GL
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle of size 25 x 25 x 3mm for boarding laid over silver oak joists(Country wood) of size 10 x 6.5cm spaced @ about 90cm c/c and supported by casurina props of 10 - 13cm dia. spaced @ 75cm c/c etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.for the following items.(RCC floor slab, roof slab, Rectangular/ square, Tee/ Ell beams, Lintels, staircase waist slabs, Landing slabs, Landing beam, Portico beam etc., ).
plane surface - below gl
for coloumn footing and GL BRACE
For brace and middle brace 0 to 3.30 m
Square coloumn 3.30 m
Square coloumn 3.31-4.30 m
Square coloumn 4.31-5.30 m
Square coloumn 5.31-6.30 m
Square coloumn 6.31-7.30m
Square coloumn 7.31-8.30m
Square coloumn 8.31-9.30m
Square coloumn 9.31-10.30m
Square coloumn 10.31-11.30m
Square coloumn 11.30-12.30m
curved surface 11.30to 12.30m Floor slab
curved surface 12.30 to 13.30m
curved surface 13.30to 14.30m
curved surface 14.30to 15.30m
Supplying and Fabricating and placing in position MS steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.
Painting two coats with Plastic Emulsion cementpaint over the including cost and conveyance of material with all labour charges etc., Complete.
Providing and fixing of RCC access ladder in RCC 1:1:5:3 mix using 20mm HBG metel including cost and conveyance and all labour charges etc complete.
Providing and fixing of RCC access inner ladder in RCC 1:1:5:3 mix using 20mm HBG metel including cost and conveyance and all labour charges etc complete.
Providing and fixing of Vent cowl including cost and conveyance and all labour charges etc complete.
Providing and fixing of cutstone(Rough dressed) set inCM 1:3 of required size including cost and conveyance of material with all labour charges etc., Complete.
Providing and fixing of Manhole Cover size including cost and conveyance of material with all labour charges etc., Complete.
Painting and lettering the Name board and (Embalam)stanted specification etc comple
Pipe connecion Arrangement for Inlet ,outlet,Scour and Overflow etc,including cost of ppes ,special curves including etc all
65mm GI pipe inlet and outlet
65mm GI pipe score
50mm GI pipe outlet
65 mm GI pipe outlet
90mm pvc threded coupler
90mm pvc threded coupler
65mm GI Tee
65mm GI Elbow 90
65mm GI bend shot
65mm GI coupler
65mm GI Union
65 mm Elbow
50mm Union
50mm GI union
50mm GI Elbow
65 mm GI TEE
65X50 mm GI Reducer
75mm x63m PVC Reducer
65 mm GM Gate valve
63mm 4ksc Pipe
Labourcharges for SR tank connection
Refilling charges
Provviding Handrails Ovr The Rof slab By Using 32 mm GI pipe 40 m x 6mm MS Flat and Fxed With 12 mm dia Fasner Bolt including etc all
Supply , delivery and fixing of PipeLine
Provision For Leveling Charges
Provision for Water meter 50 mm
Provision for soakpit arrangement
Providing Photo charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
VMS CONSTRUCTION (BID ID -1535174)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.77 MB
TECHNICALBID1.pdf
Tender Documents • 0.69 MB
BOQ_754125.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid