Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.0 LAccepted-AOC 704 SILVER DEAL DAFFODIL WING 1 B T KAWADE ROAD PUNE 411 001 | PUNE | PUNE | MAHARASHTRA | 411001 | L1 | Accepted-AOC Lowest Bidder | |
| 2 | L2₹21.7 L+₹12,176 (0.57%)Rejected-Finance | L2 | Rejected-Finance Not Lowest | |
| 3 | L3₹21.9 L+₹39,720 (1.85%)Rejected-Finance 173 RASTA PETH NIKHIL APARTMENT SHIRAL SETH CHOWK PUNE 411011 | PUNE | MAHARASHTRA | 411011 | L3 | Rejected-Finance Not Lowest | |
| 4 | L4₹22.5 L+₹99,470 (4.62%)Rejected-Finance SHOP NO 259 LOHOGAON ROAD KALWAD KHANDVE NAGAR PUNE 411032 | PUNE | MAHARASHTRA | 411032 | L4 | Rejected-Finance Not Lowest | |
| 5 | L5₹22.6 L+₹1.0 L (4.85%)Rejected-Finance | L5 | Rejected-Finance Not Lowest |
Tender Value
₹27.4 L
EMD Value
₹54,800
Closing Date
24 Aug 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CWE PUNE
HEADQUARTERS COMMANDER WORKS ENGINEERS GEN CARIAPPA MARG, PUNE-411 001
86120REPAIRS / REPLACEMENT TO HT DISTRIBUTION SYSTEM AT AFMC, OLD NDA, ASI AND AIPT UNDER GE (CENTRAL) PUNE.
2021_MES_461913_1
86120REPTOHTDISTSYSATGENPUNE
Open Tender
Electrical and Maintenance Works
Item Rate
183 days
GE Central Pune
As per Tender
9 documents required · 9 mandatory
₹500
GE Central Pune
₹54,800
Yes
23 Nov 2021
22 Jul 2021
26 Aug 2021
22 Jul 2021
24 Aug 2021
12 Aug 2021
60 days
Amount
Excavation in trenches n. exc 1.5 m wide and n. exc 1.5 m depth n exc 10 sqm on plan for laying of HT UG cable / poles/ stays etc getting out including forming bottom surface to required level and gradientt in soft /loose soil complete all as specified and as directed.
Returning, filling in, including spreading, levelling, watering and well ramming in layers not exceeding 25 cm as in soil complete all as specified and as directed.
Removing excavated material to a distance n.exc 50 m and depositing where directed at level not exceeding 1.5 m above the starting point complete all as specified and as directed.
M&L for laying of half round reinforced concrete pipe, of dia 150 mm, half round for bottom and half round for top. before laying excavated area shall be leveled. complete all specified and as directed. Note : 01 Half round top and 01 half round bottom together will be considered as one running meter complete all as secified and directed as per sample approved by GE.
M&L for steel tubes, 'light grade', galvanised, with all fittings laid in trenches to cross hard standing /roads etc of size 100 mm complete all as specified and as directed.
M&L for cutting of road /hard standing and making good with PCC (1:2:4) using 12.5 mm graded stone aggregate complete all as specified and as directed.
Supply, laying, testing, connecting and commissioning under ground cable HT XLPE UG cable suitable for earthed system 22 KV 'E' grade 3 core x 120 Sqmm steel armoured complete laid in trenches / fixed to poles/drawn through pipes with suitable size cable glands crimping type etc. complete all as specified and as directed. Note : Excavation earth work protection pipes will be measured & paid separately.
Supply, laying, testing, connecting and commissioning under ground cable HT XLPE UG cable suitable for earthed system 11 kV 'E' grade 3 core x 95 Sqmm steel armoured complete laid in trenches/fixed to poles/drawn through pipes with suitable size cable glands crimping type etc. complete all as specified and as directed. Note : Excavation earth work protection pipes will be measured & paid separately.
Supply and install HT 22 kV outdoor type gang operated air break switch three insulator type suitable for horizontal or vertical mounting complete with GI operating rod of suitable length of rating upto 200 amps including locking arrangements and supply and fix lock godrej 7 lever lock navatal or equivalent with 3 keys complete all as specified and as directed.
Supply and install HT 11 kV outdoor type gang operated air break switch three insulator type suitable for horizontal or vertical mounting complete with GI operating rod of suitable length of rating upto 200 amps including locking arrangements and supply and fix lock godrej 7 lever lock navatal or equivalent with 3 keys complete all as specified and as directed.
S&F drop out (DO) fuse unit expulsion type, outdoor type 200 amps rating single pole mounted on two insulator fixed to and including MS channel with nuts bolts washers etc. synthetic bounded fuse carrying tube complete with HT fuse element 25A capacity for HT 22 kV working pressure complete all as specified and as directed.
S&F drop out (DO) fuse unit expulsion type, outdoor type 200 amps rating single pole mounted on two insulator fixed to and including MS channel with nuts bolts washers etc. synthetic bounded fuse carrying tube complete with HT fuse element 25A capacity for HT 11 kV working pressure complete all as specified and as directed.
S&F lightning arrestor, non linear type with mounting accessories complete fixed on cross arms of pole and connected with aluminium conductor with all fittings transmission class earthed system, having discharge capacity of 10 kA and suitable for working pressure of 22 kV grade complete all as specified and as directed.
S&F lightning arrestor, non linear type with mounting accessories complete fixed on cross arms of pole and connected with aluminium conductor with all fittings transmission class earthed system, having discharge capacity of 10 kA and suitable for working pressure of 11 kV grade complete all as specified and as directed.
S&F danger notice plate of 1.6 mm thick mild steel vitreous enameled white with letters figures & conventional skull & bones in signal red colour and fixed with MS clamps bolts and nuts of approved size for HT of size 25 x 20 cm complete all as specified and directed.
S&F cable route/ earth indicators of size 200 mm x150 mm made out of 3 mm thick MS sheet duly marked with HT cable 22 kV / HT cable, size along with MS angle 25 x 25 x 4 mm duly fixed with PCC 1:4:8 with 455 mm below ground level and 150 mm above ground with sheet painted by " Black colour and white letters" complete all as specified and as directed
M&L for plate earthing for sub station equipments (Transformer, lightning arrestor and feeder pillar box) complete with galvanised mild steel plate electrode 60 cm x 60 cm x 6.3 mm thick buried directly in ground vertically (in earth pit not less than 2.25 m below normal ground level) with the top edge of the earth plate at a depth not less than 1.5 m below normal ground level, the earth electrode surrounded by adequate quantity of charcoal dust and salt to a packed thickness of 15 cm on all sides and incl GI earth strip 32 x 6 mm bolted (with GI nuts, bolts & check nuts) and riveted to earth plate electrode at one end and connected to metallic bodies of equipments etc at the other, earth strip encased in and including 40 mm bore GI light grade pipe with all fittings from top of electrode to body of equipment fixed with and including 40 x 6mm flat iron clamps, bolts, nuts and washer and also including providing watering pipe 20mm bore GI pipe medium grade from bottom of earth pit to top of electrode complete with earth pit in PCC 1:2:4 type B-O using 12 mm graded crushed stone aggregate, RCC cover, funnel, wire mesh including necessary excavation and earth work , etc.complete all as specified and shown in electrical plate No 3 of SSR Pt-I. Note : 1. Refilling of the earth pit shall be carried out with black cotton soil. 2. GI strip 32 x 6 mm & GI protection pipe upto 7.5 m length will be measured under this item.
M&L for Earth continuity conductor or main Earthing lead fixed to wall on batten or recess or chases or buried in ground or drawn in conduit / pipe or fixed to poles or any other indicated situation for loop Earthing etc. as required 32 x 6 mm galvanized iron strip complete including taking down existing old GI Strip complete all as specified and as directed.
Supply only rubber hand gloves heavy duty suitable for operation of HT 22 kV electric supply installations complete all as specified and as directed.
Supply only discharge rod extendable type upto 11 m, made out of fiber pipe along with copper cable of not less than 15 m suitable for discharging 22 kV HT electric supply system complete all as specified and as directed.
M&L for cross arm bracings, supports, clamps and back plates fabricated from structural steel sections conforming to IS, such as ISMC, angle iron, flat iron sections including hot galvanised nuts & bolts, washers for single and two pole structure welding, bending cold or hot, drilling holes for bolts, in any shape or size as specified and including one under coat and one finishing coat with aluminium paint over a coat of red oxide primer complete all as specified and as directed.
M&L for scrapping out and cleaning existing deteriorated old aluminium and painting of HT two pole structure including cross arms, supports, angle, clamps and all other items in the structure with one coat of aluminium paint complete all as specified and as directed.
M&L for scrapping out and cleaning existing deteriorated old aluminium and painting of HT four pole structure including cross arms, supports, angle, clamps and all other items in the structure with one coat of aluminium paint complete all as specified and as directed.
M&L for scrapping out and cleaning existing deteriorated old aluminium and painting of HT eight pole structure including cross arms, supports, angle, clamps and all other items in the structure with one coat of aluminium paint complete all as specified and as directed.
Dismantling the existing out lived HT 22/11 kV HT jumper connections / bus links in the out door structures of 2/4/6/8 pole structures, supplying and fixing new jumpers / bus links with ACSR Rabbit conductor duly inserted in and including rubber/PVC flexible sleeves of RYB colour codes and connecting up complete by means of suitable heavy duty aluniumium lugs, two way /three way clamps complete all as specified and as directed. Note: The ACSR conductor and flexible rubber /PVC sleeve will be measured as one length.
M&L for fixing in repairs HT 22 kV insulator Pin type, porcelain/ polymer, vitreous, white, brown or green insulator including one galvanised mild steel spindle, two galvanised iron washers and one galvanised iron nut of standard size complete all as specified and as directed.
M&L for fixing in repairs HT 22 kV insulator Disc type, porcelain, Polymer vitreous, white, brown or green insulator including cast iron stud, GI bolt nuts, washers clamps etc. suitable for fixing on cross arms complete all as specified and as directed.
Checking the fault in HT cable of any size and length at any location, 22 kV AC system with fault detector machine and inserting HT straight through cable joints kit after determining the fault location and testing complete all as directed. Note :- (i) Fault detector machine and other equipments shall be arranged by the contractor within one hour of complaint received. (ii) Supply only HT cable jointing kit, excavation & earth work shall be measured and paid separately under relevant items.
M&L for HT bus bar box of size 2000 mm x 600 mm x 450 mm suitable to connect 22 kV cables upto 6 cables as a temporary arrangement during the repairs to HT pole, structure for providing continuous supply to the area during repair work, made out of 3.15 mm thick CRCA sheet out door type, front and rear openable having aluminium bus bar of 400 Amps rated capacity mounted on suitable HT 22 KV insulators and duly powder coated complete all as specified and as directed. Note: The busbar box shall be self standing type and used for various locations under GE(Central) Pune and shall be measured as one item only.
M&L for PCC 1:4:8 type D-2 using 40 mm graded stone aggregate for foundation of poles etc complete all as specified and as directed.
M&L for PCC 1:2:4 type B1 using 20 mm graded stone aggregate as in coping, including weathering, slightly rounded or chemfered angles and throating and the like including necessary formwork and finishing the surface fair and even without using extra cement complete all as specified and as directed.
M&L by Engaging well experienced professional cable jointers for carrying out straight through joint 22 kV (Earthed) heat shrinkable type suitable for HT U/G cable of size 120 Sqmm 3 core complete all as specified and as directed.
M&L by Engaging well experienced professional cable jointers for carrying out straight through joint 11 kV (Earthed) heat shrinkable type suitable for HT U/G cable of size 95 Sqmm 3 core complete all as specified and directed.
M&L by engaging well experienced professional cable jointers for carrying outdoor type end termination joint 22 kV (Earthed) heat shrinkable type suitable for HT U/G cable of size 120 Sqmm 3 core complete all as specified and as directed.
M&L by engaging well experienced professional cable jointers for carrying outdoor type end termination joint 11 kV (Earthed) heat shrinkable type suitable for HT U/G cable of size 95 Sqmm 3 core complete all as specified and as directed.
M&L by engaging well experienced professional cable jointers for carrying out indoor type end termination joint 22 kV (Earthed) heat shrinkable type suitable for HT U/G cable of size 120 Sqmm 3 core complete all as specified and directed. Note item Nos 32 to 36 above : The work shall be carried out on emergency basis during electrical break down time even at night times as well. If the work to be carried out during night necessary lighting arrangement will be made available by the department.
Surface excavation n exc 30 cm deep and averaging 15 cm deep and getting out in soft/loose soil complete all as specified and as directed.
Supply and laying graded coarse aggregate of size 40 mm in out door HT installations complete as specified and as directed.
Disconnecting the incoming and outgoing cable / ACSR conductor connections after making temporary arrangements for restoring electric supply to the affected buildings by installing standby transformer and making temporary cable connections, transportation the distribution transformer 22 kV/433 volt 250 to 315kVA, installed on PCC plinth or floor mounted to authorized local workshop and servicing complete as mentioned below and transporting back installing in the original position complete all as specified and as directed.
Draining out the transformer oil from transformer through drain valve and opening the top plate complete by removing nut bolts etc.
Taking out complete all three cores and cleaning with suitable cleaning chemicals and replacing the insulating material and keeping the core assembly in ovening at desired standard temperature to achieve the required insulation resistance level and varnishing completely.
Cleaning the entire tank including radiator fins etc by flushing with insulating material.
Re-assembling the core assembly after ovening complete in tanks by placing all supports, nut bolts etc properly.
Refixing the top plate with nuts and bolts and replacing the all rubber gaskets
Filling of New transformer oil complete (Transformer oil will be measured and paid separately) Note :- 1. Testing of transformer to be carried out before and after servicing 2. A spare transformer of same capacity shall be provided by the contractor during servicing period and without any extra payments to the contractor on this account.
Disconnecting the incoming and outgoing cable/ACSR conductor connections after making temporary arrangments for restoring electric supply to the affected buildings by installing standby transformer and making temporary cable connections, transportation the distribution transformer 22 kV/433 volt 100/160/200 kVA, installed on PCC plinth or floor mounted to authorized local workshop and servicing complete as mentioned below and transporting back installing in the original position complete all as specified and as directed.
Draining out the transformer oil from transformer through drain valve and opening the top plate complete by removing nut bolts etc.
Taking out complete all three cores and cleaning with suitable cleaning chemicals and replacing the insulating material and keeping the core assembly in ovening at desired standard temperature to achieve the required insulation resistance level and varnishing completely.
Cleaning the entire tank including radiator fins etc by flushing with insulating material.
Re-assembling the core assembly after ovening complete in tanks by placing all supports, nut bolts etc properly.
Refixing the top plate with nuts and bolts and replacing the all rubber gaskets.
Filling of New transformer oil complete (Transformer oil will be measured and paid separately) Note :- 1. Testing of transformer to be carried out before and after servicing. 2. A spare transformer of same capacity shall be provided by the contractor during servicing period and no extra payments will be made to the contractor on this account.
Disconnecting the incoming and outgoing cable/ACSR conductor connections after making temporary arraignments for restoring electric supply to the affected buildings by installing standby transformer and making temporary cable connections, transportation the distribution transformer 22 kV/433 volt 400/500KVA, installed on PCC plinth or floor mounted, to authorized local workshop and servicing complete, as mentioned below and transporting back installing in the original position complete all as specified and as directed.
Draining out the transformer oil from transformer through drain valve and opening the top plate complete by removing nut bolts etc.
Taking out complete all three cores and cleaning with suitable cleaning chemicals and replacing the insulating material and keeping the core assembly in ovening at desired standard temperature to achieve the required insulation resistance level and varnishing completely.
Cleaning the entire tank including radiator fins etc by flushing with insulating material.
Re-assembling the core assembly after ovening complete in tanks by placing all supports, nut bolts etc properly.
Refixing the top plate with nuts and bolts and replacing the all rubber gaskets
Filling of New transformer oil complete (Transformer oil will be measured and paid separately) Note :- 1. Testing of transformer to be carried out before and after servicing. 2. A spare transformer of same capacity shall be provided by the contractor during servicing period and no extra payments will be made to the contractor on this account.
Disconnecting the incoming and outgoing cable/ACSR conductor connections after making temporary arraignments for restoring electric supply to the affected buildings by installing standby transformer and making temporary cable connections, transportation the distribution transformer 11 kV/433 volt 630/750KVA, installed on PCC plinth or floor mounted, to authorized local workshop and servicing complete, as mentioned below and transporting back installing in the original position complete all as specified and as directed.
Draining out the transformer oil from transformer through drain valve and opening the top plate complete by removing nut bolts etc.
Taking out complete all three cores and cleaning with suitable cleaning chemicals and replacing the insulating material and keeping the core assembly in ovening at desired standard temperature to achieve the required insulation resistance level and varnishing completely.
Cleaning the entire tank including radiator fins etc by flushing with insulating material.
Re-assembling the core assembly after ovening complete in tanks by placing all supports, nut bolts etc properly.
Refixing the top plate with nuts and bolts and replacing the all rubber gaskets
Filling of New transformer oil complete (Transformer oil will be measured and paid separately) Note :- 1. Testing of transformer to be carried out before and after servicing. 2. A spare transformer of same capacity shall be provided by the contractor during servicing period and no extra payments will be made to the contractor on this account.
Dehydration / filtration of transformer oil at the installed location in online condition repeatedly till to achieve the dielectric strength of Transformer oil to 50 kV including testing the dielectric strength of the oil before and after filtration by means of transformer oil testing equipment complete all as specified and as directed. Note : a Samples are to be collected from top and bottom levels of the oil tank and the report is to be submitted for each sample.
Supply and fill new Transformer oil in the Transformer for topping up in existing Transformer and replacement in serviced transformer complete all as specified and as directed.
S&F gasket for Transformer top cover suitable for any types of Transformer of capacity 100 KVA to 750 kVA including taking down old unserviceable gasket complete all as specified and as directed
M&L for replacement of unserviceable oil level indicator, toughened glass strip including replacing necessary nuts, bolts, washers, packing etc complete all as specified and as directed
Removing and refilling silica gel in breather of transformers capacity up to 750 kVA complete all as specified and as directed
Taking down old silica gel breather assembly and S & F new breather assembly with packing nuts, washers etc. suitable for existing transformer of 100 to 750 kVA capacity complete all as specified and as directed.
S&F in repairs brass studs suitable for Transformer of capacity 100 kVA and suitable make, 433 V, AC for LT side connection including removing of old worn-out studs from Transformer including brass nuts and 2 Nos washers for each studs and replacing cork sheet gasket complete all as specified and as directed.
S&F in repairs brass studs suitable for Transformer of capacity 160 kVA and suitable make, 433 V, AC for LT side connection including removing of old worn-out studs from Transformer including brass nuts and 2 Nos washers for each studs and replacing cork sheet gasket complete all as specified and as directed
S&F in repairs brass studs suitable for Transformer of capacity 200 kVA and suitable make, 433 V, AC for LT side connection including removing of old worn-out studs from Transformer including brass nuts and 2 Nos washers for each studs and replacing cork sheet gasket complete all as specified and as directed
S&F in repairs brass studs suitable for Transformer of capacity 250 kVA and suitable make, 433 V, AC for LT side connection including removing of old worn-out studs from Transformer including brass nuts and 2 Nos washers for each studs and replacing cork sheet gasket complete all as specified and as directed
S&F in repairs brass studs suitable for Transformer of capacity 315 kVA and suitable make, 433 V, AC for LT side connection including removing of old worn-out studs from Transformer including brass nuts and 2 Nos washers for each studs and replacing cork sheet gasket complete all as specified and as directed
S&F in repairs brass studs suitable for Transformer of capacity 500 kVA and suitable make, 433 V, AC for LT side connection including removing of old worn-out studs from Transformer including brass nuts and 2 Nos washers for each studs and replacing cork sheet gasket complete all as specified and as directed
S&F in repairs brass studs suitable for Transformer of capacity 630/750 kVA and suitable make, 433 V, AC for LT side connection including removing of old worn-out studs from Transformer including brass nuts and 2 Nos washers for each studs and replacing cork sheet gasket complete all as specified and as directed
M&L for painting one coat of synthetic enamel paint smoke grey on external surface including cleaning and filling cavities including writing SM No., MES No. and capacity complete all as specified and as directed for the following:
Transformer, 22 KV/433 V, AC, of capacity 100 KVA to 200 KVA
Transformer, 22 KV/433 V, AC, of capacity 250 KVA to 500 KVA
Transformer, 11 KV/433 V, AC, of capacity 630 KVA to 750 KVA
Star Electrical
M/S - SUJIT ELECTRICALS
Rama Electricals
AN-ICON Engineering Technologies And Infrastructure Developments Pvt. Ltd
Tulsani Associates
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .