Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAccepted-Finance | ₹1.6 Cr | L1 | Accepted-Finance As per the financial committee report |
| 2 | L2₹1.7 CrAccepted-Finance | ₹1.7 Cr | L2 | Accepted-Finance As per the financial committee report |
| 3 | L3₹1.7 CrAccepted-Finance | ₹1.7 Cr | L3 | Accepted-Finance As per the financial committee report |
| Sl No | Description | Qty | Unit | Gajanan Construction L2 | M/S AMABADAS POPAT GHUGE CONSTRUCTION COMPANY L3 | N M PEKHALE INFRA PRIVATE LIMITED L1 |
|---|---|---|---|---|---|---|
| 2.00 | Maintenance of Cantt. Fund Roads with SDBC | 1 | No | 1,65,00,000 ₹1.6 Cr | 1,68,00,000 ₹1.7 Cr | 1,60,50,000 ₹1.6 Cr |
| 3.00 | Providing & laying 75/50 millimetre thick compacted Modified Penetration Macadam with VG 30 bitumen over existing Water Bound Macadam surface including picking the road metalled surface thoroughly cleaning the Water Bound Macadam surface by using mechanical broom or approved equipment spreading 40 millimetre size metal (30 percentage Crushed metal + 70 percent Hand broken by bringing basted rubble on site of work) at the rate of 0.09 cubic metre per square metre compacting metal with roller and bitumen is then spread at the rate of 2 Kg. per square metre spreading 12 millimetre metal at the rate of 0.018 cubic metre per square metre. The surface shall be lightly rolled so that metal pieces get embedded in the bitumen layer and rolling shall continue until entire surface is thoroughly compacted etc complete. (With Static Roller) (Including diversion road) a) 75 Millimetre | 1 | Sqm | 450 ₹450 | 460 ₹460 | 425 ₹425 |
| 4.00 | Providing & laying 75/50 millimetre thick compacted Modified Penetration Macadam with VG 30 bitumen over existing Water Bound Macadam surface including picking the road metalled surface thoroughly cleaning the Water Bound Macadam surface by using mechanical broom or approved equipment spreading 40 millimetre size metal (30 percentage Crushed metal + 70 percent Hand broken by bringing basted rubble on site of work) at the rate of 0.09 cubic metre per square metre compacting metal with roller and bitumen is then spread at the rate of 2 Kg. per square metre spreading 12 millimetre metal at the rate of 0.018 cubic metre per square metre. The surface shall be lightly rolled so that metal pieces get embedded in the bitumen layer and rolling shall continue until entire surface is thoroughly compacted etc complete. (With Static Roller) (Including diversion road)
b) 50 Millimetre | 1 | Sqm | 450 ₹450 | 455 ₹455 | 400 ₹400 |
Updated dates
Tender Value
₹1.5 Cr
EMD Value
₹3 L
Closing Date
19 Dec 2025, 4:00 pmClosed
Chief Executive Officer
Office of the Cantonement Board Deolali, Caanught Road Deolali camp 422401
Maintenance of Cantt fund road with SDBC
2025_DGDE_743590_1
R and B Sr No.94/2025-26. SDBC
Open Tender
Civil Works
365 days
Deolali Cantt Area
Please refer Tender documents.
2 documents required · 2 mandatory
₹15,000
Chief Execuitve Officer
₹3 L
Yes
6 Jan 2026
8 Dec 2025
22 Dec 2025
8 Dec 2025
19 Dec 2025
8 Dec 2025
Amount
Maintenance of Cantt. Fund Roads with SDBC
Providing & laying 75/50 millimetre thick compacted Modified Penetration Macadam with VG 30 bitumen over existing Water Bound Macadam surface including picking the road metalled surface thoroughly cleaning the Water Bound Macadam surface by using mechanical broom or approved equipment spreading 40 millimetre size metal (30 percentage Crushed metal + 70 percent Hand broken by bringing basted rubble on site of work) at the rate of 0.09 cubic metre per square metre compacting metal with roller and bitumen is then spread at the rate of 2 Kg. per square metre spreading 12 millimetre metal at the rate of 0.018 cubic metre per square metre. The surface shall be lightly rolled so that metal pieces get embedded in the bitumen layer and rolling shall continue until entire surface is thoroughly compacted etc complete. (With Static Roller) (Including diversion road) a) 75 Millimetre
Providing & laying 75/50 millimetre thick compacted Modified Penetration Macadam with VG 30 bitumen over existing Water Bound Macadam surface including picking the road metalled surface thoroughly cleaning the Water Bound Macadam surface by using mechanical broom or approved equipment spreading 40 millimetre size metal (30 percentage Crushed metal + 70 percent Hand broken by bringing basted rubble on site of work) at the rate of 0.09 cubic metre per square metre compacting metal with roller and bitumen is then spread at the rate of 2 Kg. per square metre spreading 12 millimetre metal at the rate of 0.018 cubic metre per square metre. The surface shall be lightly rolled so that metal pieces get embedded in the bitumen layer and rolling shall continue until entire surface is thoroughly compacted etc complete. (With Static Roller) (Including diversion road) b) 50 Millimetre
Gajanan Construction (BID ID -3500938)
M/S AMABADAS POPAT GHUGE CONSTRUCTION COMPANY (BID ID -3501546)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
SDBC1.pdf
Tender Documents • 5.89 MB
BOQ_832611.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid