Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.2 CrAdmitted-Finance | -0.01% | ₹1.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.3 CrAdmitted-Finance | +3.00% | ₹1.3 Cr | L2 | Admitted-Finance |
| 3 | L3₹1.3 CrAdmitted-Finance | +4.52% | ₹1.3 Cr | L3 | Admitted-Finance |
Tender Value
₹1.2 Cr
EMD Value
₹1.2 L
Closing Date
7 Apr 2026, 5:00 pmClosed
EO TIG MPL
EO TIG MPL
civil
2026_ORULB_127321_1
TIG-MPL-27-2026
Open Tender
Civil Works - Others
Percentage
180 days
Titlagarh MPL Office
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
EO Titlagarh Municipality
₹1.2 L
Yes
17 Apr 2026
17 Mar 2026
10 Apr 2026
17 Mar 2026
7 Apr 2026
17 Mar 2026
17 Mar 2026 - 7 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | De-Watering:-Suplying all materials, labours, T&P, 5.00 HP Diesel Pump set with POL, Pump Operator etc. and De-watering the clear water/muddy water etc. all complete as per the required specification and direction of Engineer in charge | 2,708.65 | hrs | 232.8 | ₹6,30,573.72 |
| 2 | De-Weeding:-Supplying all material, labour and T&P etc by removing rank floating Vegetation and uprooting the vegetation by digging upto a depth of 60cm, if required and removal of all types of weeds and other vegetation growth by forking repeatedly breaking clots,rough dressing,uprooting fresh growth after 10-15 days and fine dressing for planting new approved grass including cost of removing of all rubbish materials with all leads and lifts etc. all completed as per the required specifications and direction of Engineer-in-Charge. | 6,965.1 | sqm | 33.25 | ₹2,31,589.58 |
| 3 | De-Silting :- Supplying all materials labour T&P, Excavation of any available type of soil by mechanical means loading into and transportation by mechanical means and unloading the soil within the Pond Area on properly prepared and scientifically approved surface including spreading and levelling the earth in 22.5 cm layers to make ready for watering and compaction by mechanical means but excluding watering and compaction in dams and dykes for all heights including construction, maintenance, watering and lighting of haul road and borrow area etc. complete as per the required specification and direction of Engineer-incharge. (measurement of the fill to be taken on the finished compacted section under OMC condition.)( for 1 km lead distance) | 2,786.04 | Cum | 80.12 | ₹2,23,217.52 |
| 4 | De-Silting :- Supplying all materials labour T&P, Excavation of any available type of soil by mechanical means loading into and transportation by mechanical means and unloading the soil within the Pond Area on properly prepared and scientifically approved surface including spreading and levelling the earth in 22.5 cm layers to make ready for watering and compaction by mechanical means but excluding watering and compaction in dams and dykes for all heights including construction, maintenance, watering and lighting of haul road and borrow area etc. complete as per the required specification and direction of Engineer-incharge. (measurement of the fill to be taken on the finished compacted section under OMC condition.)( for 5 km lead distance) | 25,074.36 | Cum | 182.28 | ₹45,70,554.34 |
| 5 | Supplying all materials , Labour, T&P and Fine dressing of earthwork in odinary or hard soil in road / Embankment formation including cost of cutting of filling earth upto 0.15 depth of surface etc all complete as per the required specifications and direction of Engineer in Charge. | 3,480 | sqm | 4.2 | ₹14,616 |
| 6 | Supplying all materials labour T&P, Watering earthwork upto OMC condition and compaction by Mechanical means in layars not exceeding 22.5Cm to 95% dray density including hire and running charges of all the Machineries complete as per the direction of EIC (AoR-2006, | 2,786.04 | Cum | 47.82 | ₹1,33,228.43 |
| 7 | Earth work in hard soil or gravelly soil within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge. | - | Cum | 276.89 | - |
| 8 | Supplying and filling of sand to the foundation bed of column pit. Wall foundation and inside the filling with well watered and rammed etc and complete as per the direction of E.I.C. | - | Cum | 618.84 | - |
| 9 | PCC (1:4:8) using 40mm size black granite Crusher broken metals with all cost, conveyance, royality etc and complete as per direction of E.I.C. | - | Cum | 5,083.62 | - |
| 10 | RCC work of M20 grade with 20mm sizeand down graded black hard granite chips including cost, conveyance and royality of all materials, cost of all labour, T&P etc. complete including centring and shuttering and dismentalled the centring materials. | - | Cum | 5,401.99 | - |
stage.html
html • 0.03 MB
technical_585309.pdf
techsummary_585309.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.95 MB
BOQ_585309.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].