Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical 53 67 R N GUHA ROAD KOL 28 | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical KANPUR BALISAI RAMNAGAR PURBA MEDINIPUR PIN 721423 | RAMNAGAR | PURBA MEDINIPUR | WEST BENGAL | 721423 | Admitted-Fee/PreQual/Technical |
Tender Value
₹12.2 L
EMD Value
₹24,425
Closing Date
8 Jun 2026, 2:00 pmClosed
Office of the Executive Engineer, Tamluk Division,
Office of the Executive Engineer,Tamluk Division, P.H.Engg. Dte.P.H.E. Complex 1st floor, Parbatipur,Tamluk, Purba Medinipur 721636
Operation and Maintenance ofPaniparul Z II Madhabpur Z II its adjoining mouzas water supply scheme within Egra II Block under Digha Sub Division of Tamluk Division, PHE Dte. Purba Medinipur. For one Year .
2026_PHED_1024589_1
WBPHED/EE/TD/NIeT_17/2025-2026 (2nd Call)
Open Tender
CIVIL WORKS
Percentage
365 days
Egra II Block
Please refer Tender documents.
2 documents required · 2 mandatory
₹24,425
Office of the Executive Engineer,Tamluk Division,
29 Jun 2026
18 May 2026
11 Jun 2026
18 May 2026
8 Jun 2026
20 May 2026
20 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Operation and Maintenance of distribution system including rising main, FHTC, OHR & deployment of man power, checking of status of supply in the command area, reparing of leakages, busting pipe line including round the clock watch & ward to ensure supply of potable water through out the command area of the scheme in all respect and as per direction of EIC. (Payments of Valve Operators to be maid as per approved PHE rate) for (CI/DI/AC/UPVC/HDPE) of Paniparul Z II & its adjoining mouzas water supply scheme within Egra II Block under Digha Sub Division of Tamluk Division, PHE Dte. Purba Medinipur. {For one(1) Year} . | 1 | Each | 6,84,702.05 | ₹6,84,702.05 |
| 2 | Operation and Maintenance of distribution system including rising main, FHTC, OHR & deployment of man power, checking of status of supply in the command area, reparing of leakages, busting pipe line including round the clock watch & ward to ensure supply of potable water through out the command area of the scheme in all respect and as per direction of EIC. (Payments of Valve Operators to be maid as per approved PHE rate) for (CI/DI/AC/UPVC/HDPE) of Madhabpur Z II & its adjoining mouzas water supply scheme within Egra II Block under Digha Sub Division of Tamluk Division, PHE Dte. Purba Medinipur. {For one(1) Year} . | 1 | Each | 3,40,005.04 | ₹3,40,005.04 |
| 3 | Add GST @18% (CGST@9% + SGST@9%) | 1 | GST | 1,84,447.27 | ₹1,84,447.27 |
| 4 | Add Cess@1% | 1 | Cess | 12,091.54 | ₹12,091.54 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
cancelled_1.pdf
pdf • 0.03 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
WBF2911.pdf
Tender Documents • 2.20 MB
BOQ_2518009.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .