CE NCTPS II
OFFICE OF CE NCTPS II Chennai 120
NCTPS II Civil Maintenance circle Civil Maintenance Division Repair and maintenance works to Air Compressor room at NCTPS II
2026_EB_730974_1
CE/NCTPS-II/SE/CM/31/2026-27
Open Tender
Civil Works
Works
NCTPS II
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹8,500
Yes
25 Nov 2026
25 Nov 2026
11 Dec 2026
25 Nov 2026
10 Dec 2026
25 Nov 2026
180 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing two legged scaffolding for colour washing using 10-13 cm dia casuarina props, distance between two rows being 1.25m and spacing of posts being 2m in both rows, with two horizontal posts with 0.50m overlap on either side and braces at 2m c/c including logitudinal and transverse middle braces to step up and providing a platform with C.W.Planks of 40mm thick and 1m width etc., complete using coir and nails. | 1,098.1 | m2 | - | - |
| 2 | Replacing of damaged False Ceiling with 8mm thick Calcium Silicate perforated Board Designed and size 600mm x 600mm including the cost of all materials, labour, lead, lift, T & P, etc., complete and as directed by the Engineer incharge of the work. | 3.6 | m2 | - | - |
| 3 | Dismantling of existing damaged Ventilators and devoluting the scrap materials to the store, including cost of all materials, cutting equipments, welding equipments, all leads, lifts etc., complete. | 18.9 | m2 | - | - |
| 4 | Providing, and fixing of Wired glass in the existing steel windows, including the cost of all materials, labour, lead, lift, T &P , etc. complete. | 5.3 | m2 | - | - |
| 5 | Providing, fabricating and fixing in position powder coated anodized aluminium partly glazed single leaf door using aluminium box section of size 45 x 45 x 2 mm for top, middle and sides, 100 x 45 x 2mm for bottom, partly panelled with 9mm prelaminated board (Novapan or equivalent) and partly glazed with 5mm thick plain glass (saint gobain or equivalent) lock, 'D' type handles on both sides, hinges at top and bottom, door stopper, door closure etc., including the cost of all materials, labour, lead, lift, T & P, etc., complete and as directed by the Engineer incharge of the work. | 7.25 | m2 | - | - |
| 6 | Providing and fixing UPVC (Un-Plasticized Polyvinyl Chloride) Louvered Ventilators of from the profile the size of outer frame 60mm x 58mm and shutter profile size of 60 x 78mm both profiles are reinforced with GI/1mm 125GSM and 100% corrosion free, the profile are multi chambered sections with wall thick of 2mm. The EPDM rubber (black colour) covered with all over the edges of frame and shutter. The corners and joints should be welded and cleaned. Radiations pin headed glass 4mm thick should be provided in the louvers. The window should be fixed to the wall with 100% packing with screws and silicon packing all round the frames. The ventilator should be got approved from the Executive Engineer before use on work | 19.8 | m2 | - | - |
| 7 | Modification of the existing Fire Proof Door and fixing the same in the existing Door position including the cost of materials , providing hinges, fabrication, dismantling the masonry and fixing, finishing etc., complete. | 5 | Nos | - | - |
| 8 | Colour washing with two coats of interior emulsion paint including the cost of all materials, lead, lift, labour, T&P etc., complete and as directed by the Engineer Incharge of the work. | 1,403.8 | m2 | - | - |
| 9 | Colour washing with two coats with Exterior Emulsion paint over one coat of primer for outside wall after thorough scrapping of old plastered surface including cost of all materials, labour, lead, lift, T & P etc. complete and as directed by the Engineer at site. | 914.9 | m2 | - | - |
| 10 | Painting two coats of synthetic enamel paint for iron works after through scrapping of rest including cost of all materials, Labour, lead, lift, T&P etc. complete and as directed by the engineer at site. | 33.7 | m2 | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.20 MB
BOQ_877181.xls
BOQ • 0.31 MB
Spec31.pdf
Tender Documents • 0.99 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .