| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.6 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹8.7 L+₹90,112 (11.6%)Rejected-AOC RAHEJA NIWAS 243 GHORPADE PETH PUNE 411 042 | PUNE | PUNE | MAHARASHTRA | 411042 | L2 | Rejected-AOC Rejected | |
| 3 | L3₹9.1 L+₹1.3 L (16.4%)Rejected-AOC | L3 | Rejected-AOC Rejected |
Tender Value
₹12.1 L
EMD Value
₹25,000
Closing Date
8 Nov 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GARRISON ENGINEER GOMANATAK
GARRISON ENGINEER GOMANTAK VASCO DA GAMA PIN 403802
Repairs of Charpoy GI Ply Top and Bed Plywood Top at Vasco under GE Gomantak
2022_MES_557687_1
8474/E8
Open Tender
Support/Maintenance Service
Item Rate
180 days
VASCO DA GAMA
Refer tender documents
8 documents required · 8 mandatory
₹500
GE GOMANTAK
₹25,000
Yes
15 Nov 2022
14 Oct 2022
9 Nov 2022
14 Oct 2022
8 Nov 2022
27 Oct 2022
Amount
Removal of following existing unserviceable components of various furniture items carefully without disturbing the adjoining parts and supply & fixed new components in lieu of dismantled components / discorded components as mentioned including lightening the joints, placing every part in-tact, as applicable as per drgs. Note:- work will be executed where the furniture exist in different user units of GE Gomantak including BSO's Furniture Yard as directed by Engineer -in-charge.
Charpoy GI Ply top ( FD-220):-
(a) Removing of the existing U/S long rail and Supply & fixing new long rail with 32 mm dia GI Pipe including both end threaded suitable for fixing elbow complete all as shown in drg as specified and directed .
(b) Removing U/S BROKEN Short rail and fixing new short rail made out of old broken long rail obtained from 1 (a) above including both end threaded suitable for fixing elbow complete all as shown in drg as specified and directed.
(c) Removing U/S broken Legs and fixing new leg made out of old broken long /short rail obtained from 1 (a) & (b) above including both end threaded suitable for fixing elbow complete all as shown in drg as specified and directed.
(d) Removing of U/S Elbow 3way and supply and fix new GI Elbow 32 mm dia ISI marked all as shown in drg as specified and directed .
(e) Removing of U/S Checknut and Supply and fix new checknut all as shown in drg as specfied and directed
(f) Removing existing unserviceable plywood top from the Charpoy GI pipe and supplying & fixing new 12 mm thick plywood ISI-303 Marked BWR type and including refixing of existing stiffner fixing with screw at equal distance to GI pipe frame of charpoy and fixing the plywood top with MS machine made screw bolts with counter sunk head at one end and other end screwed with washers and one hexagonal nut of 75 mm long ,dia of neck 5 mm and applying two coats of synthetic enamel paint to stiffeners after one coat of paint primer complete as directed Make : greenply, Century , Archidply
(g) Provisioning of MS angle iron 900mm long of size 25mmx25mmx 3mm, rest on both long rail and fixing the MS angle iron with plywood top with MS Machine made screw bolts with counter sank head at one end and other screwed with washer and one hexagonal nut of 75 mm long dia of neck 5 mm to fix the plywood complete as per drg.
Removel of following existing unserviceable components of bed hard, carefully without disturbing the adjoining parts and supply & fixing new components as mentioned below. The repair work shall carried out in BSO furniture yard and in various units as and when required and as directed tighting the joints, placing every part in-tact, and all wood surface from all side when exposed to view shall be franch polished with high gloss finish all as specified and as directed by Engr-in-charge
Bed Plywood Top/hard Bed (FD-246/ 245,213)
(a) Long rail as per drg
(b) Short rail as per drg
(c) New Foot Board as per drg
(d) New Head Board as per drg
(e) Middle Stiffeners as per drg
(f) 12mm ISI-303 Marked ply for Bed top as per drg,Make : greenply, Century , Archidply
(g) Removing unserviceable venner from footboard both side S&F new Venneer 4mm thick both side of footboard as per drg
(h) Removing unserviceable Veneer from head board both side and S&F new Venneer 4mm thick both side of head board as per drawing.
(j) Leg as per drg
M&L for Replacement of U/S Sunmica sheet of table conference (FD-8(M) and S&F 1mm thick Sunmica sheet of Make - Century, Greenlam and Archidlam on front and side of conference table.
Mahesh Traders
SHREE SAI LABOUR CONTRACT CO-OPERATIVE SOCIETY LTD
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .