Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance PERAMBALUR | TAMIL NADU | 621101 | Admitted-Finance |
| 2 | Admitted-Finance NO 2 325 SOUTH STREET Z KULATHUR POST ANDIMADAM TALUK ARIYALUR DISTRICT | ANDIMADAM | ARIYALUR | TAMIL NADU | Admitted-Finance |
Tender Value
₹5.8 L
EMD Value
₹5,800
Closing Date
1 Sept 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Project Director
DRDA, Ariyalur
Construction of Drainage 2 nos in Package No.TN 30-13 in Sendurai Block of Ariyalur District Under AGAMT II 2021-22
2022_RDTN_247540_1
R.C.No.A4/5304/2021, Date.10.08.2022
Open Tender
Civil Works - Others
Item Rate
180 days
Sendurai
As per tender documents
4 documents required · 4 mandatory
₹0
₹5,800
14 Sept 2022
17 Aug 2022
1 Sept 2022
17 Aug 2022
1 Sept 2022
17 Aug 2022
Amount
1.Construction of Drainage at kottaikadu Anbazhagan house to Kalaivanan House in Alathiyur Pt. Earthwork excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth
Supplying and filling in foundation and basement with filling sand in layers not more than 15cm thick well rammed, watered and compacted complete complying with standard specification
Cement concrete 1:4:8 mix (one cement four sand and eight hard broken stone) using 40mm ISS HBG metal for foundation including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, etc., complete as per standard specification
Supplying and Erecting centering for sides including cost and conveyance of all materials and labour charges etc complete.,
Cement concrete 1:3:6 mix (one cement three sand and six hard broken stone) using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, etc., complete as per standard specification
Plastering in Cement Mortar 1:5 mix, 12mm thick including cost and conveyance of all materials to work site and all labour charges etc., complete.
Vertical Filter Earthwork excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth
Supplying and Filling the soak pit with 225 mm boulders as per standard specification
Supplying and Filling the soak pit with 40 mm boulders as per standard specification
Supplying and Filling the soak pit with 20 mm boulders as per standard specification
Supplying and filling in foundation and basement with filling sand including cost and coveyance of all materials to site and all labour charges ect., complete with standard specification
Cement concrete 1:4:8 mix (one cement four sand and eight hard broken stone) using 40mm ISS HBG metal for foundation including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, etc., complete as per standard specification
Supplying and Erecting centering for sides including cost and conveyance of all materials and labour charges etc complete.,
Cement concrete 1:2:4 mix (one cement two sand and four hard broken stone) using 20mm ISS HBG metal for foundation including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, etc., complete as per standard specification
Brick work in C.M 1:5 mix using country bricks including cost and conveyance of all materials and labour charges etc complete
Plastering in Cement Mortar 1:5 mix, 12mm thick including cost and conveyance of all materials to work site and all labour charges etc., complete.
Supplying and fixing of RCC Ring 900mm dia for leach pit including cost and conveyance of all materials to site in standard specification
Supplying and fixing of RCC precast slab of 75mm thick 1:2:4 using 20mm HBG jelly pointing including cost and conveyance of all materials to site in standard specification
Provision for Name board
2. Construction of Drainage at Mullukurichi middle street Maruthamuthu house to Jayakanthan house in Alathiyur Pt. (70m) Drainage: Earthwork excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth
Supplying and filling in foundation and basement with filling sand in layers not more than 15cm thick well rammed, watered and compacted complete complying with standard specification
Cement concrete 1:4:8 mix (one cement four sand and eight hard broken stone) using 40mm ISS HBG metal for foundation including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, etc., complete as per standard specification
Supplying and Erecting centering for sides including cost and conveyance of all materials and labour charges etc complete.,
Cement concrete 1:3:6 mix (one cement three sand and six hard broken stone) using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, etc., complete as per standard specification
Plastering in Cement Mortar 1:5 mix, 12mm thick including cost and conveyance of all materials to work site and all labour charges etc., complete.
Vertical filter Earthwork excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth
Supplying and Filling the soak pit with 225 mm boulders as per standard specification
Supplying and Filling the soak pit with 40 mm boulders as per standard specification
Supplying and Filling the soak pit with 20 mm boulders as per standard specification
Supplying and filling in foundation and basement with filling sand including cost and coveyance of all materials to site and all labour charges ect., complete with standard specification
Cement concrete 1:4:8 mix (one cement four sand and eight hard broken stone) using 40mm ISS HBG metal for foundation including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, etc., complete as per standard specification
Supplying and Erecting centering for sides including cost and conveyance of all materials and labour charges etc complete.,
Cement concrete 1:2:4 mix (one cement two sand and four hard broken stone) using 20mm ISS HBG metal for foundation including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, etc., complete as per standard specification
Brick work in C.M 1:5 mix using country bricks including cost and conveyance of all materials and labour charges etc complete
Plastering in Cement Mortar 1:5 mix, 12mm thick including cost and conveyance of all materials to work site and all labour charges etc., complete.
Supplying and fixing of RCC Ring 900mm dia for leach pit including cost and conveyance of all materials to site in standard specification
Supplying and fixing of RCC precast slab of 75mm thick 1:2:4 using 20mm HBG jelly pointing including cost and conveyance of all materials to site in standard specification
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Panneerselvam
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .