| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹57.5 LAdmitted-Finance M S SHREE SANWARIYA CONSTRUCTION COMPANY BOONDI RAJASTHAN | -21.99% | ₹57.5 L | L1 | Admitted-Finance |
| 2 | L2₹58.3 LAdmitted-Finance | -20.99% | ₹58.3 L | L2 | Admitted-Finance |
| 3 | L3₹60.7 LAdmitted-Finance | -17.70% | ₹60.7 L | L3 | Admitted-Finance |
Tender Value
₹73.8 L
EMD Value
₹1.5 L
Closing Date
19 Feb 2026, 6:00 pmClosed
Executive Engineer WDSC Kapasan
Executive Engineer WDSC Kapasan Panchayat Samiti Campus, Kapasan District Chittorgarh (Rajasthan)
3_Construction work of WHS (2), Anicut (3), Anicut cum Causeway (1) and Sankan Pond (5), Gram Panchayat Mungana, Rupakhedi and Balarda PS Kapasan, Project MJSA 2.0
2026_WDSC_536428_3
ENIT 08/2025-26 MJSA 2.0 EE WDSC Kapasan
Open Tender
Miscellaneous Works
120 days
Kapsan
Scan copy Paid Egrase Service Challan of Tender Fee, Processing Fee, EMD and Required All Documents as per
NIB.
2 documents required · 2 mandatory
₹1,000
By Egrace Service Challan
₹1.5 L
Yes
26 Feb 2026
9 Feb 2026
20 Feb 2026
9 Feb 2026
19 Feb 2026
9 Feb 2026
ACTIVITY-WHS (2 WORK) taxy dh lQkbZ ]lk/kkj.k ouLifr rFkk >kfM+;ksa dks dkVus lfgrABSR item No. 191
Mkxcsfyax djuk 2-5 lseh- 5 lseh xgjkbZ rd As per BSR item No. 6 a
जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्थर को अलग करना (Sorting of grass & pebbles) एवं बण्ड (Bund) का सेक्शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य) ईकाई 1 घन मी. मशीनरी कार्य सख्त मिट्टी (in Hard Soil) BSR item no. 196 (b)
सीमेंट कंक्रीट 1 सीमेंट : 4 बजरी तथा 8 गिट्टी / 1 सीमेंट, 3 बजरी तथा6 गिट्टी पत्थर की 20 मिमी नामीय माप की नींव में डालना,कूटना तथा तराई आदि सहित एनीकट के लिए। 1:4:8 वाईब्रटर व मिक्सर का उपयोग नही करने पर 3 प्रतिशत की कटोती की जावेगी। BSR item no.170 a
एनीकट हेतु पत्थर की चिनाई सीमेंट-बजरी मसाले में। uho ]vf/klajpuk esa1 : 6 में BSR item no.166 a
एनीकट हेतु पत्थर की चिनाई सीमेंट-बजरी मसाले में। uho ]vf/klajpuk esa1 : 6 में BSR item no.166 a
सीमेन्ट प्लस्टर दीवार पर 1:4 अनुपात में सीमेन्ट - बजरी मिलाकर जोडों को कुरेदने तथा 14 दिन तक नियमित तराई सहित 25 मि.मी. मोटाई (केवल जलरोधी संरचनाओ के उपयोग हेतु) BSR item no.76a
सीमेंट कंक्रीट 1 सीमेंट : 2 बजरी : 4 पत्थर एग्रीगेट अनुपात में 12 मिमी नामीय माप की एग्रीगेट के साथ डालना,कूटना तथा तराई आदि सहित । BSR item no.16
खुदी हुई मिट्टी/रेत को नीव में तथा कुर्सी में 50 मीटर तक दूरी (Lead) में डालना तथा समतल करना , पानी डालना तथा दूरमुट से कुटना। BSR item no.5
जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्थर को अलग करना (Sorting of grass & pebbles) एवं बण्ड (Bund) का सेक्शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य) ईकाई 1 घन मी. मशीनरी कार्य सख्त मिट्टी (in Hard Soil) BSR item no. 196 (b)
Compation of Earth or highly weathered strata by Manually plain roller (density 90% of Proctor) WRD BSR Chapter Vth 2023 item no.(18A)
Watering of Earth inculding cost of Carriage of Water When Source of Water is Beyond 1 Km. but extra per km. BSR Chapter Vth 2023 item no.(28 A)
BOARD
ACTIVITY-Anicut (3) जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्थर को अलग करना (Sorting of grass & pebbles) एवं बण्ड (Bund) का सेक्शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। मशीनरी कार्य सख्त मिट्टी (in Hard Soil)( Bsr item no. 196B)
सीमेंट कंक्रीट 1 सीमेंट : 4 बजरी तथा 8 गिट्टी / गिट्टी पत्थर की 20 मिमी नामीय माप की नींव में डालना,कूटना तथा तराई आदि सहित एनीकट के लिए। 1:4:8 वाईब्रटर व मिक्सर का उपयोग नही करने पर 3 प्रतिशत की कटोती की जावेगी।( Bsr item no. 170 A)
Centering & Shuttering with plywood or steel sheets including strutting, propping , bracing both ways and removal of form work for foundation in basements rafts, footings, strap beams, bases of columns , etc. upto plinth level. ( PS- BSR2025Itam No. 93b)
Reinforced Cement Concrete work in beams, Suspended floors, Girders having slopes up to 150 ,Landings, Balconies, Shelves, Chajjas, Lintels, Bands, Plain window sills, With 1:1.5:3 (1 cement : 1.5 : coarse sand : 3 graded stone aggregate 20mm nominal size)Staircases and Spiral Staircases up to floor three level includind curing, compaction, Finishing with rendering in cement sand mortar 1:3(1 Cement : 3 Coarse Sand) and making good and joints excluding the cost of centering, Shuttering and reinforcement:( PS- BSR2025Item No. 13a)
Providing & fabricating steel reinforcement for R.C.C. work including cutting , bending, placing in position and binding complete including cost of binding wire in foundations, Raft footing step Beams base of columns etc. all complete up o floor three level.( PS- BSR2025Itam No. 61) 10 mm sariya weight per mtr 0.617kg
एनीकट हेतु पत्थर की चिनाई सीमेंट-बजरी मसाले में। uho ]sa1 : 6 में ।( Bsr item no. 166 A)
एनीकट हेतु पत्थर की चिनाई सीमेंट-बजरी मसाले में। vf/klajpuk esa1 : 6 में ।( Bsr item no. 166 A)
सीमेन्ट प्लस्टर दीवार पर 1:4 अनुपात में सीमेन्ट - बजरी मिलाकर जोडों को कुरेदने तथा 14 दिन तक नियमित तराई सहित 25 मि.मी. मोटाई (केवल जलरोधी संरचनाओ के उपयोग हेतु)( Bsr item no. 76 A)
सीमेंट कंक्रीट 1 सीमेंट : 2 बजरी : 4 पत्थर एग्रीगेट अनुपात में 12 मिमी नामीय माप की एग्रीगेट के साथ डालना,कूटना तथा तराई आदि सहित । Bsr item no. 16)
खुदी हुई मिट्टी/रेत को नीव में तथा कुर्सी में 50 मीटर तक दूरी (Lead) में डालना तथा समतल करना , पानी डालना तथा दूरमुट से कुटना। Bsr item no. 5)
board /paint work detail
Anicut cum causway 1 work जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्थर को अलग करना (Sorting of grass & pebbles) एवं बण्ड (Bund) का सेक्शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य) ईकाई 1 घन मी. मशीनरी कार्य सख्त मिट्टी (in Hard Soil)
सीमेंट कंक्रीट 1 सीमेंट : 4 बजरी तथा 8 गिट्टी / 1 सीमेंट, 3 बजरी तथा6 गिट्टी पत्थर की 20 मिमी नामीय माप की नींव में डालना,कूटना तथा तराई आदि सहित एनीकट के लिए। 1:4:8 वाईब्रटर व मिक्सर का उपयोग नही करने पर 3 प्रतिशत की कटोती की जावेगी।
एनीकट हेतु पत्थर की चिनाई सीमेंट-बजरी मसाले में। uho ]vf/klajpuk esa1 : 6 में
सीमेन्ट प्लस्टर दीवार पर 1:4 अनुपात में सीमेन्ट - बजरी मिलाकर जोडों को कुरेदने तथा 14 दिन तक नियमित तराई सहित 25 मि.मी. मोटाई (केवल जलरोधी संरचनाओ के उपयोग हेतु)
सीमेंट कंक्रीट 1 सीमेंट : 2 बजरी : 4 पत्थर एग्रीगेट अनुपात में 12 मिमी नामीय माप की एग्रीगेट के साथ डालना,कूटना तथा तराई आदि सहित ।
खुदी हुई मिट्टी/रेत को नीव में तथा कुर्सी में 50 मीटर तक दूरी (Lead) में डालना तथा समतल करना , पानी डालना तथा दूरमुट से कुटना।
कल्वर्ट/पुलिया निर्माण हेतु आरसीसी.(रेन्फोसमेंट सीमेंट कंक्रीट)NP3 ह्युम पाइप एक पंक्ति में आवश्यक ढलान देते हुए सीमेंट मसाला 1:2 में बिछाने/लगाने का कार्य मय कोलर सहित |(मिटटी खुदाई,कंक्रीट व चिनाई कार्य के अलावा)
board
sunkun pond 5work जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्थर को अलग करना (Sorting of grass & pebbles) एवं बण्ड (Bund) का सेक्शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य) ईकाई 1 घन मी. मशीनरी कार्य सख्त मिट्टी (in Hard Soil)
taxy dh lQkbZ ]lk/kkj.k ouLifr rFkk >kfM+;ksa dks dkVus lfgrABSR item No. 191
Mkxcsfyax djuk 2-5 lseh- 5 lseh xgjkbZ rd As per BSR item No. 6 a
Display board(Lumpsum)
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.69 MB
Work03amount7377.pdf
Tender Documents • 1.99 MB
BOQ_955763.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid