Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 1008 A PREMIER ENGINEERING COMPANY PURVI RITHANI MEERUT DELHI ROAD MEERUT UTTAR PRADESH 250103 INDIA | MEERUT | UTTAR PRADESH | 250103 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹3.4 L
Closing Date
21 Dec 2021, 11:30 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EX. ENGINEER (E AND M) W-S (SOUTH-WEST)/M-9
D BLOCK OHT OPP DESU COLONY JANAKPURI NEW DELHI-58
Renovation of foundation including providing /fixing of base frame at D-6 BPS Vasant Kunj under Mehrauli Constituency AC 45
2021_DJB_212734_18
N.I.T.No.12 (2021-22)/ EE(EnM)WS-SW/M-9C/oACE(M)-9
Open Tender
Civil Works
Works
30 days
OFFICE OF THE EX. ENGINEER (E AND M) WS-SW/M-9
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
DJB EMD Ac No. 50448339804
Exempted
24 Dec 2021
14 Dec 2021
21 Dec 2021
14 Dec 2021
21 Dec 2021
14 Dec 2021
120 days
Disconnection of all electrical connection, decoupled the Motor from pump and pump from suction & delivery system by mechanical and manual means.
Dismantling the pump-set from the M.S. base frame by cutting of rusted nut bolts by the gas cutter & electric welding set removing all the nut bolts of suction & delivery side by gas cutter & welding job also involve dismantle the suction & delivery side sluice valve, NRV, Taper, bend etc. and lifting the pump & Motor on ground level.
Providingof M.S .blank flange at suction side size 200 mm dia
Providing of M.S .blank flange at delivery side size 150 mm dia
Removing of M.S. base frame from the RCC foundation after cutting the foundation bolt gas cutter / welding set etc. and lifting the same by manual means on ground level.
Demolishing RCC work manually /by mechanical means including stacking of steels bars and disposal of unserviceable material within 50 metres lead as per direction of engineer in charge DSR: 2018- 15.3
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. DSR 2018- 10.2
Providing and lying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering – All work up to plinth level: 1:2:4. ( 1 cement :2 coarse sand (zone –III) : 4 grade stone 20mm nominal size ) Volume of foundation 40 HP Electric pump set= 2( LxBxH) A- 2 Nos. x(1.6 x 0.75 x 1.2 m= 2.88 cum 5.1.3 DSR 2018
Centering and shuttering including strutting, propping etc. and removal of form for : For foundation, footing, bases of columns, etc for mass concrete. 5.9.1 DSR 2018
Steel reinforcement for RCC work for including straitening, cutting, bending, placing in position in binding all complete upto plinth level. Cold twisting bars 5.22.3 DSR 2018
Providing of 200 mm dia. Non rising spindle CI D/F sluice valve as per IS 14846 PN 1.0. Make – Kirloskar / IVC.
Providing of 150 mm dia. Non rising spindle CI D/F sluice valve as per IS 14846 PN 1.0. Make – Kirloskar / IVC.
Providing of 150 mm dia Non return Valve CI D/F as per IS 14846 PN 1.0 Make – Kirloskar / IVC
Providing of Rubber insulation sheet, size 1.5mm thickness. Make :- Jyoti
Providing of MS foundation Bolts of sizes 20 mm x 450 mm ISI mark
Providing M S nut bolts off size as per site requirement ISI mark
Fixing of M S base frame on the RCC foundation and tightening with foundation Nut Bolts. Fixing of Electric pump set on the MS base frame, make proper alignment and tightening the same with the help of required arrangements.
Making suction connection by fixing of sluice valve, gap pieces and flange as per site requirement. Making delivery connection by fixing of sluice valve, NRV, gap piece and flanges as per site requirement
Testing and commissioning of complete system at no load and full load with all the required tests.
RP Electricals
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .