| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 CrAccepted-AOC | ₹4.2 Cr | L1 | Accepted-AOC AOC |
| 2 | L2₹5.5 Cr+₹1.3 Cr (30.9%)Rejected-Finance 0 AHAMADPUR AHAMADPUR AHAMADPUR JAUNPUR UTTAR PRADESH 222180 | JAUNPUR | UTTAR PRADESH | 222180 | ₹5.5 Cr+₹1.3 Cr (30.9%) | L2 | Rejected-Finance Not Admitted |
Tender Value
₹5.5 Cr
EMD Value
₹11.1 L
Closing Date
8 Mar 2024, 12:00 pmClosed
S.E., Jaunpur-Ghazipur Circle, P.W.D., Jaunpur
S.E., Jaunpur-Ghazipur Circle, P.W.D., Jaunpur
Renewal of Kundaha sujanganj machhalishahar madiyahu kerakat sultanpur road (MDR 151E) for BC work
2024_CEUVZ_900909_1
530/SE Tender/jnp-gzp circle/23 date 13-02-2024
Open Tender
Civil Works
Percentage
240 days
Jaunpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,590
₹11.1 L
Yes
S.E., Jaunpur-Ghazipur Circle, P.W.D., Jaunpur
14 Jun 2024
20 Feb 2024
8 Mar 2024
20 Feb 2024
8 Mar 2024
20 Feb 2024
20 Feb 2024
Amount
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. As per Techinical Specification Clause No-503 Morth (Including all material, T&P, labour cess etc. but excluding G.S.T.)
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects as per directed by Engineer-in-charge. (Including all material, T&P, labour cess etc. but excluding G.S.T.)
Construction of sub-grade and earthen shoulders with approved material obtained from Right of way with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2. (Including all material, T&P, labour cess etc. but excluding G.S.T.)
The routine Maintenance of MDR-151E Road Km-1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 82(500), 83, 84, 85, 86, 87(500), 89(980), 90, 91, 92, 93, 94, 95, 96, 97(900) including embankment, Patri, Road Sides, Cross Drains Hume Pipe Culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. including cost of material T&P labour cess, etc. but Excluding cost of GST ) For 1st Year maintenance Cost
The routine Maintenance of MDR-151E Road Km-1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 82(500), 83, 84, 85, 86, 87(500), 89(980), 90, 91, 92, 93, 94, 95, 96, 97(900) including embankment, Patri, Road Sides, Cross Drains Hume Pipe Culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. including cost of material T&P labour cess, etc. but Excluding cost of GST ) For 2nd Year maintenance Cost
The routine Maintenance of MDR-151E Road Km-1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 82(500), 83, 84, 85, 86, 87(500), 89(980), 90, 91, 92, 93, 94, 95, 96, 97(900) including embankment, Patri, Road Sides, Cross Drains Hume Pipe Culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. including cost of material T&P labour cess, etc. but Excluding cost of GST ) For 3rd Year maintenance Cost
The routine Maintenance of MDR-151E Road Km-1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 82(500), 83, 84, 85, 86, 87(500), 89(980), 90, 91, 92, 93, 94, 95, 96, 97(900) including embankment, Patri, Road Sides, Cross Drains Hume Pipe Culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. including cost of material T&P labour cess, etc. but Excluding cost of GST ) For 4th Year maintenance Cost
The routine Maintenance of MDR-151E Road Km-1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 82(500), 83, 84, 85, 86, 87(500), 89(980), 90, 91, 92, 93, 94, 95, 96, 97(900) including embankment, Patri, Road Sides, Cross Drains Hume Pipe Culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. including cost of material T&P labour cess, etc. but Excluding cost of GST ) For 5th Year maintenance Cost
m/s sai construction
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .