| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹72.5 LAccepted-AOC AT MALLIBANDHA PO KALAMACHHUNIN PS COLLIERY TALCHER DIST ANGUL ODISHA 759103 | TALCHER | ANGUL | ODISHA | 759103 | ₹72.5 L | L1 | Accepted-AOC AWARDED FOR BEING L1 BIDDER |
| 2 | L2₹77.1 L+₹4.6 L (6.35%)Rejected-Finance AT BADAJORADA TALCHER ANGUL ODISHA 759103 | ANUGUL | ODISHA | 759103 | ₹77.1 L+₹4.6 L (6.35%) | L2 | Rejected-Finance REJECTED FOR NOT BEING L1 BIDDER |
| 3 | L3₹83.2 L+₹10.7 L (14.8%)Rejected-Finance AT KAHKAREI PO RAJJIHARAN VIA KOSALA DIST ANGUL PIN 759103 ODISHA | ANGUL | ODISHA | 759103 | ₹83.2 L+₹10.7 L (14.8%) | L3 | Rejected-Finance REJECTED FOR NOT BEING L1 BIDDER |
| 4 | L4₹86.7 L+₹14.2 L (19.6%)Rejected-Finance ANANTA OCP JAGANNATH AREA | ANUGUL | ODISHA | 759103 | ₹86.7 L+₹14.2 L (19.6%) | L4 | Rejected-Finance REJECTED FOR NOT BEING L1 BIDDER |
| 5 | L5₹89.1 L+₹16.6 L (22.9%)Rejected-Finance AT SHARMA CHHAK PO TALCHER ANGUL ODISHA DIST ANGUL ODISHA 759100 | ANUGUL | ODISHA | 759100 | ₹89.1 L+₹16.6 L (22.9%) | L5 | Rejected-Finance REJECTED FOR NOT BEING L1 BIDDER |
| Sl No | Description | Qty | Unit | ABHAYA KUMAR MOHANTY L1 | Pratap Kumar Sahoo L3 | Sanjay Kumar L4 | PRATAP KUMAR PANI L5 | SOUMYA RANJAN PRADHAN L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00Item Description/ Heading | ||||||||
| 1.01 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material as per relevant clauses of section 300 & 2100 ) Ordinary soil Mechanical Means upto 3 m depth | 4,027.65 | Cum | 50 ₹2,01,382.5 | 59 ₹2,37,631.35 | 69.75 ₹2,80,928.59 | 39 ₹1,57,078.35 Lowest | 62 ₹2,49,714.3 |
| 1.02 | Sand Filling in Foundation Trenches as per Drawing & Technical Specification | 302.09 | Cum | 770 ₹2,32,609.3 Lowest | 879 ₹2,65,537.11 | 903.75 ₹2,73,013.84 | 898 ₹2,71,276.82 | 803 ₹2,42,578.27 |
| 1.03 | Plain/Reinforced cement concrete in open foundation including formwork, shuttering etc. complete as per drawing and technical specifications and as per relevant clauses of section 1500, 1700 & 2100 PCC Grade M15 | 302.09 | Cum | 3,700 ₹11,17,733 Lowest | 4,199 ₹12,68,475.91 | 4,350.75 ₹13,14,318.07 | 4,561 ₹13,77,832.49 | 3,867 ₹11,68,182.03 |
| 1.04 | Plain/Reinforced cement concrete in open foundation including formwork, shuttering etc. complete as per drawing and technical specifications and as per relevant clauses of section 1500, 1700 & 2100 PCC Grade M20 . | 1,135.07 | Cum | 4,000 ₹45,40,280 Lowest | 4,599 ₹52,20,186.93 | 4,775.25 ₹54,20,243.02 | 5,007 ₹56,83,295.49 | 4,245 ₹48,18,372.15 |
| 2.00 | Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC | 1 | Nos | 11,57,480.91 ₹11,57,480.91 Lowest | 13,28,447.95 ₹13,28,447.95 | 13,84,815.67 ₹13,84,815.67 | 14,23,001.8 ₹14,23,001.8 | 12,30,980.88 ₹12,30,980.88 |
Tender Value
₹1.2 Cr
EMD Value
₹1.4 L
Closing Date
8 Jun 2026, 5:00 pmClosed
STAFF OFFICER (CIVIL), HINGULA AREA
SO (CIVIL), OFFICE OF THE GM, HINGULA AREA, P.O._N.S.NAGAR, TALCHER, ANGUL_759148, ODISHA, INDIA
Construction of peripheral drain around coal stock, in-motion weighbridge and static weighbridge of Hingula OCP under Hingula Area.
2026_MCL_360054_1
MCL/GM(HA)/Civil/e-Tender/ 26-27/29 Dt.22.05.2026
Open Tender
Civil Works - Others
Item Rate
300 days
HINGULA OCP
AS PER NIT
5 documents required · 5 mandatory
₹1.4 L
1 Aug 2026
23 May 2026
10 Jun 2026
23 May 2026
8 Jun 2026
23 May 2026
23 May 2026 - 1 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Item Description/ Heading | |||||
| 1.01 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material as per relevant clauses of section 300 & 2100 ) Ordinary soil Mechanical Means upto 3 m depth | 4,027.65 | Cum | 93 | ₹3,74,571.45 |
| 1.02 | Sand Filling in Foundation Trenches as per Drawing & Technical Specification | 302.09 | Cum | 1,205 | ₹3,64,018.45 |
| 1.03 | Plain/Reinforced cement concrete in open foundation including formwork, shuttering etc. complete as per drawing and technical specifications and as per relevant clauses of section 1500, 1700 & 2100 PCC Grade M15 | 302.09 | Cum | 5,801 | ₹17,52,424.09 |
| 1.04 | Plain/Reinforced cement concrete in open foundation including formwork, shuttering etc. complete as per drawing and technical specifications and as per relevant clauses of section 1500, 1700 & 2100 PCC Grade M20 . | 1,135.07 | Cum | 6,367 | ₹72,26,990.69 |
| 2 | Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC | 1 | Nos | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.61 MB
Tendernotice_2.pdf
PDF • 0.81 MB
BOQ_372930.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .