Tender Value
₹1.5 Cr
EMD Value
₹3.0 L
Closing Date
4 May 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
WORKS
18 conditions · 3 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
With the submission of the certificate/affidavit as mentioned, the practice of verification of tenderer's documents by the Railway dispensed with. Instruction for bidders, in this regards are:
Railway reserves the right to verify all statements, information and documents submitted by the bidder in his tender offer, and the bidder shall, when so required by the Railway, make available all such information, evidence and documents as may be necessary for such verification. Any such verification of lack of such verification, by the railway shall not relieve the bidder of its obligations or liabilities hereunder nor will it affect any rights of the railway thereunder.
In case of any wrong information submitted by tenderer, the contract shall be terminated, Earnest Money Deposit (EMD),Performance Guarantee (PG) and Security Deposit (SD) of contract forfeited and agency barred for doing business on entire Indian Railways for 5 (five) years.
With such a system of self-certification of credentials, tender finalization should also be speeded up. The Tenderer(s) shall keep the offer open for a minimum period of 60 days (in case of two packet system of tendering 90days) from the date of closing of the Tender.
146 conditions · 2 needing a document upload
Any payment required for E-Tendering is accepted through Net Banking or Payment Gateway only.
Credentials in support of fulfillment of eligibility criteria ( Without these documents the offer is liable to be rejected) as per details stipulated in Tender documents. Each and every pages of the supporting documents should be signed with proper seal and date.
Details of technical personnel with qualification and experience employed by the firm.
Details of special equipments , tools and plants, machinery etc available with the firm for execution of contract works.
If working through contract labour , the contractor must resgister with Labour Commissioner and necessary license to be submitted with tender or to be produced before signing of contract agreement.
Partnership deed, if any, constitution of the firm and copies of power of attorney and other connected legal documents to be submitted.
Submission of requisite information for Financial Eligibility criteria as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
All required documents duly attested as per Para 14.0 of IRGCC must be submitted.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Execution of Signaling & Telecommunication work in connection with: Reliability improvement in the working of LC Gates through the provision of improved circuit (4-2-ka-1), replacement of Pedestal, Lock Post, Power Relay (BLR), MSR etc and other reliability improvement works at LC Gates over Raipur Division.
SNT-R-2026-08
SNT-R-2026-08
Open
Works - General
9 Months
Raipur, Chhattisgarh
₹0
₹3.0 L
4 May 2026
6 Apr 2026
20 Apr 2026
29 items across 2 schedules · ₹1,51,98,737.79 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Cement Concrete of proportion 1:3:6 with graded aggregate of size 25mm. and below. | cum | 6.00 | 2,943 | 17,658 |
| 2 | Alteration/ Modifications in the existing location boxes, fixing ofequipments, cable insertion, termination, wiring, testing &commissioning, two coat painting, lettering to suit the circuits asper approved wiring diagrams. This includes filling with sand and plastering the same. | Numbers | 6.00 | 2,548 | 15,288 |
| 3 | Alteration of existing Q-series/Composite Relay Racks and cable termination racks. | Numbers | 4.00 | 19,785 | 79,140 |
| 4 | Installation and wiring of Rotary key transmitters/KLCR on teak wood board enclosed inside a suitable box with front transparent check cover with locking arrangement. This includes 3/4" thick teak wood boards, transparent sheet for box, locking arrangement. 2 nos.of locks for box and 1 No. lock for front transparent sheet. | Each | 28.00 | 507 | 14,196 |
| 5 | Supply & installation of Fencing (Picket Type Tie Bar fencing) work around S&T apparatus case or building/office etc. as per instruction of Railway representative. | Kg | 1400.00 | 234.88 | 3,28,832 |
| 6 | Charging and installation of secondary cell 2V- 80AH/120AH/200AH (lead acid type), and preparation of electrolyte for lead acid cells. If power is not available at site of work, charging may be done at nearby location as per convenience of the Railway. Initial Charging to be done in presence of Rlys representative from executive agency as well as maintenance org,with uninterrupted supply. | Each | 110.00 | 310 | 34,100 |
| 7 | Excavation & casting of pedestal foundation for left/right hand boom of lifting barriers. | Each | 36.00 | 9,427 | 3,39,372 |
| 8 | Excavation & casting of foundation for stop post. | Each | 36.00 | 1,453 | 52,308 |
| 9 | Installation and Fixing of "E" type lock along with Welding Work. | Numbers | 12.00 | 704 | 8,448 |
| 10 | Supply and installation of Class-A protection as per RDSO guidelines. Supply of all required material as per latest RDSO Guidelines. This includes supply of (per installation): (i) Counter: 02 Nos, (ii) Lightening arrestor: as per building size, (iii) Spark Gas Isolator: Min. 2 Nos (or as per site requirement), (iv) Any other items required for commissioning of this item. Earthing shall comply all guidelines specified in TAN No. STS/E/TAN/3006 Ver.3.1 dated25.06.2025 or Latest. Materials inspection by RITES. | Numbers | 20.00 | 2,63,040 | 52,60,800 |
| 11 | Supply and provision of Perimetric/Ring Earth with Maintenance Free Earth arrangement as per RDSO TAN No. STS/E/TAN/3006 Ver.3.1 dated25.06.2025 or Latest. Supply of all requites material as per latest RDSO Guideline. Earthing shall comply all guidelines (arrangement, parameters, pre-commissioning check list, warranty of 60 months etc.) specified in RDSOTAN no. STS/E/TAN/3006 Ver.3.1 dated 25.06.2025. NOTE: (1) The overall Earth resistance value for the earth connected with MEEB shall be less than1 ohm, (2) The earth pits shall be interlinked using a 25 x 2 mm copper tape/Solid copper round conductor of 8mm dia/GI tape of 50X6mm (for theft prone areas only) with proper exothermic welding, (3) The interconnecting conductor shall be buried at a depth of not less than 500 mm below the ground level. This conductor shall also be covered with approximately 30 kg of earth enhancement compound for every 3 meters of its length, (4) PVC insulated multi- strand single core 4 X 35 sq. mm copper cable or 2nos of 25X 2 mm copper tape to be used for connecting MEEB to nearest earth electrode, (5) Provision of Bonding Ring Conductor (BRC)of 25 x 2 mm copper tape shall be provided at Relay Room & IPS Room and all equipments & racks should be connected to BRC as per RDSO TAN, (6) All the required Materials for providing Earthing & Bonding as per schedule will be suppliedby Contractor and from RDSO approved firm only. | Station | 20.00 | 2,90,614.6 | 58,12,292 |
| 12 | Casting of CC foundations in the ratio of 1:3:6 for sliding boom asper Drg. Minimum 10 Nos of foundation per set shall be cast using standard size holding down bolts & nuts for erection. Item include excavation, ramming, curing and plastering 1:4 cement and sand mixture. Aggregate, cement, sand and holding down bolts & nuts to be supplied by the contactor. | LC Gate | 14.00 | 33,065.07 | 4,62,910.98 |
| Schedule total | ₹1,24,25,344.98 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
TAN3006Ver3_1dated30_06_2025.pdf RDSO TAN
ATTACHMENT
GCCACSs_1.pdf
ATTACHMENT
Annexure-J.pdf
ATTACHMENT
Annexure-2LC.pdf
ATTACHMENT
IRGCCApril-2022.pdf
ATTACHMENT
Annexure-VIAVIB.pdf
ATTACHMENT
TAN3006Ver3_1dated30_06_2025.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .