Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 LAccepted-AOC NEAR WATER TANK TIRWANJA MOKASA POST KACHRALA CHOTA NAGPUR ROAD CHANDRAPUR MAHARASHTRA 442902 | CHANDRAPUR | MAHARASHTRA | 442902 | ₹3.4 L | L1 | Accepted-AOC Work order Attached |
| 2 | L2₹4.4 L+₹92,144.96 (26.8%)Rejected-Finance | ₹4.4 L+₹92,144.96 (26.8%) | L2 | Rejected-Finance Commercially L2 bidder Rejected, TCR attached as per NIT. |
| 3 | L3₹4.6 L+₹1.2 L (34.5%)Rejected-Finance | ₹4.6 L+₹1.2 L (34.5%) | L3 | Rejected-Finance Commercially L3 bidder Rejected, TCR attached as per NIT. |
| 4 | Rejected-Technical AT PO DUNDWA PANDEYMORE TANDWA DIST CHHATRA JHARKHAND 825321 | TANDWA | CHHATRA | JHARKHAND | 825321 | - | - | Rejected-Technical Technically Rejected |
| 5 | Rejected-Technical | - | - | Rejected-Technical Technically Rejected |
Tender Value
₹4.9 L
EMD Value
₹6,200
Closing Date
6 Apr 2023, 4:00 pmClosed
Staff Officer ENM
Office of the Area Ganeral Manager , Chandrapur Area
Work for Grounding of Vertical joist and fabrication/welding vertical plates at discharge point of CHP, BOCM, Chandrapur Area
2023_WCL_276115_1
wcl_ch3150_enm_0081_2022-23
Open Tender
Electrical and Maintenance Works
Item Rate
60 days
Chandrapur area
please read tender documents as per NIT
3 documents required · 3 mandatory
₹6,200
Yes
21 Sept 2023
23 Mar 2023
7 Apr 2023
24 Mar 2023
6 Apr 2023
24 Mar 2023
24 Mar 2023 - 31 Mar 2023
Amount
Labour Cost: Making Cement concrete foundation including excavation (60*60*150)cm deep in 1:3:6 cement concrete (20 to 25)mm stone metal with necessary curing and finishing complete, Vertical joist 200*100 mm= 15 Nos. PWD SOR (2018/19) 16-3-6
Making Cement concrete foundation including excavation (60*60*150)cm deep in 1:3:6 cement concrete (20 to 25)mm stone metal with necessary curing and finishing complete, Vertical joist 200*100 mm= 15 Nos. PWD SOR (2018/19) 16-3-6
Labour Cost : Fabrication of steel structure with the help of vertical joist, horizontal channel frame and M.S. sheet of 16mm/12mm as per guidelines of Engg. In charge .(PF [email protected]) Civil rate Analysis
M/S.ARATI ENGINEERING WORKS
Supa Construction
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .