| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.6 LAdmitted-Finance HARYANA HR | GURUGRAM | HARYANA | 122001 | +4.50% | ₹2.6 L | L1 | Admitted-Finance |
| 2 | L2₹2.7 LAdmitted-Finance | +6.54% | ₹2.7 L | L2 | Admitted-Finance |
| 3 | L3₹2.7 LAdmitted-Finance 0 NGG POWER TECH INDIA PRIVATE LIMITED VILLAGE JHOLAN MAJRA PO POLIAN BEET TEHSIL HAROL JHOLAN UNA HIMACHAL PRADESH 174503 | UNA | HIMACHAL PRADESH | 174503 | +8.50% | ₹2.7 L | L3 | Admitted-Finance |
Tender Value
₹2.5 L
EMD Value
₹2,499
Closing Date
14 Jan 2026, 11:00 amClosed
SR. EXECUTIVE ENGINEER ED HPSEBL RAKKAR UNA
SR. EXECUTIVE ENGINEER ED HPSEBL RAKKAR UNA
Tender for providing 11kV HT Line and proposed 11/0.4kV,100 KVA Sub-Station near Green Avenue Colony Rakkar and re-earthing of existing 5 nos Sub-Station Bid No- UED/206/2025-26 under ESD HPSEBL NOII Una.
2026_HPSEB_125196_1
BID NO- UED/206/2025-26
Open Tender
Electrical Works
90 days
RAKKAR UNA
AS PER SBD
5 documents required · 5 mandatory
₹590
₹2,499
29 Apr 2026
7 Jan 2026
15 Jan 2026
7 Jan 2026
14 Jan 2026
7 Jan 2026
A) Erection Part
ERECTION PART 11kV HT Line TS. No-257/2025-26 wbs no- 32100261-001-una-HT-
Stringing and sagging conductor:- Laying of conductor stringing and sagging, binding with insulator complete in all respect.
Laying of G.I Wire, Stringing, Sagging and binding complete in all respect.
Erection of Stay Set HT:- Digging of Pit fixing of Stay Rod, filling of Pit, Nozeiling & Tightning complete in all respect.
Mannual carriage from road to site ,transportation charges from central store to site and loading- unloading in all respect (IN ALL HEAD) average distance at site
ERECTION PART 11/0.4kV,100 KVA Sub-Station TS. N0-258/2025-26 WBS NO- 32100261-001-UNA-DTR-
Erection of100 kva S/Stn. Str.:-Digging of Pit for S/T Pole and earthing, drilling of holes in X-arm, preparation of plate form str. Member CI, Alluminium Paint AI i.e X-arml, Knee bracing set, erection of D-pole,errection of plate form, ercetion of x-Arm, drop out, fuse unit, linghting arrestor, MCCB Switch of LT Box, Energy Meter, Erection of T/F, and earthing conn. to T/F G.O Switch lightning etc. erection of Stay Set, Erection of Jumper, Pipe earthing 3 Nos., Erection of LT cable, brabed wire and painting, 3 Nos. earthing to S/Stn. by prov. 50Kg Salt charcole in each earthing i/c construction of trench for earthing as per REC Board Standard complete in all respect.
Mannual carriage from road to site ,transportation charges from central store to site and loading- unloading in all respect (IN ALL HEAD) average distance at site
SUPPLY PART. 11kV HT Line TS. No-257/2025-26 wbs no- 32100261-001-una-HT-
Prov.AAAC 7/4.26 mm Conductor (Provided By HPSEBL)
Prov.G.I.Wire No. 8 SWG in mtr. (Provided By HPSEBL)
Prov.Nuts and Bolts of Various Sizes
Prov.MS Half Clamp (Provided By HPSEBL)
Prov.MS Full Clamp
Prov.11kv Pin Insulator with pin complete in all respect
Prov.11kv Stay Set
Prov. Stay Wire (7/3.15 mm) (10 kg. per Stay Set)
SUPPLY PART
Supply PART 11/0.4kV,100 KVA Sub-Station TS. N0-258/2025-26 WBS NO- 32100261-001-UNA-DTR-
Distribution Transformer (Ordinary) 11/0.4 KV, 100KVA (Provided By HPSEBL)
Steel Tubular Poles (9 m, Working load>200Kgf/m2) (Provided By HPSEBL)
Muffs with concrete filling
X-Arm (Channel Iron (100X50X6mm) Length 2800mm X 2 No's) for incomer Line. Provided by HPSEBL
MS Angle Iron (50X50X5mm) Length 2800mm x1 No's for LA's .
X-Arm (Channel Iron (75X40X6mm) Length: ( 2800mm x 4 No's) for supporting DO fuse unit & GO switch (Provided By HPSEBL)
Transformer Belting & Knee Bracing
X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for Transformer Bed Provided by HPSEBL
X-Arm [Channel Iron (100x50x6 mm), Length : (460 mm) x 2 Nos for supporting Main Channel of Transformer]
MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos
MS Angle Iron (35X35x5 mm), Length : (460 ) x 2 Nos
MS Angle Iron (50X50x6 mm), Length : (950 mm) x 2 Nos for Bed Knee Bracing
Transformer LT Distribution Box and GO Switch fixing Assembly
MS Angle Iron (50X50x6 mm), Length: (2800 mm) x 2 Nos
MS Angle Iron (50X50x6 mm), Length: (450 mm) x 1 Nos
GO Switch Handle Supporting: [Channel Iron (75x40x6 mm), Length: 460 mm
GO AB Switch Unit (11kV, 400A, 25 KA) Tripple pole O/D type
D.O Fuse Unit
Surge Arrester, 9 kV Station Class (Porcelain Type)
Discs insulator sets (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.) (Provided By HPSEBL)
Stay set complete
Stay Wire (7/3.15 mm) (7.0 kg per Stay Set)
Pipe Earthing Set
LT Distribution Panel Box with MCCB (40A, 25 kA, 4P) and SFU (16A, 4No, rewirable)
Half Clamp (M.S. Flat 50X6 mm)
Full Clamps (M.S. Flat 50X6 mm)
Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]
Aluminium Thimble
Thimble copper 200 amps
Danger Plate
Barbed Wire
LT Cable (3.5 Core) 70 mm²
Energy Meter (3-Phase, 4-Wire) DLMS compliant 50 A CT Type for 100KVA Transformer Provided by HPSEBL
Aluminium Paint.
Prov.Red Oxide (1.5 Ltr. Per Pole)
5 Nos. complete re-earthing for various distribution transformers i.e. existing 11/0.4 kV, 63 kVA ML-9 Upper Arniala; 63 kVA CHC-5 Rakkar; 63 kVA BH10 Near Govt. Collage Una; 63 kVA BH-17 Near Railway Bridge Bharolian Khurd and 250 kVA VN-2nd Vikas Nagar Una TS NO-228/2025-26 WBS NO-32100261-001-DTR-UNA-DTR-321
3 Nos. complete earthing sets for per transformer installation, each consisting of 40 mm dia × 3.0 m long G.I. pipe (medium class) electrode, buried vertically in ground and surrounded by alternate layers of charcoal/coke and common salt to achieve the desired earth resistance. Each electrode shall be connected to the equipment with G.I. wire of 8 SWG, securely fastened using suitable clamps, bolts, and nuts. The top of each electrode shall be provided with a G.I. reducer, watering funnel with mesh, and inspection pipe for regular watering and maintenance. Each earth pit shall be provided with a C.I. earth chamber with removable cover, and a test link / earth resistance test point shall be provided for measurement. The work includes all materials, labour, excavation, refilling, and restoration of the surface, complete in all respects as per IS:3043 / REC Construction Standards and as directed by the Engineer-in-Charge.
Pipe Earthing Set (MS Plate earthing) (GI pipe 40 mm, GI Socket ,MS Plate 300X300X6 mm) (3 Nos for Each)
6 SWG GI wire For Earthing (25 kg for Each)
Providing Charcoal and Salt for the earthing (1 Nos for Each)
Erection of Earthing of Sub-Station
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.10 MB
Tendernotice_2.pdf
PDF • 0.57 MB
BOQ_184342.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid