| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹68.8 LAccepted-AOC SWAGAT CO OP HSG SOCIETY LTD 22 303 CHAITANYA SHIVAJI RAJE COMPLEX MHADA COMPLEX OPP EKA NAGAR KANDIVALI W MUMBAI 400 067 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400067 | ₹68.8 L Quoted ₹69.8 L | L1 | Accepted-AOC ACCEPTANCE |
| 2 | L2₹1.0 Cr+₹30.3 L (43.4%)Rejected-Finance | ₹1.0 Cr+₹30.3 L (43.4%) | L2 | Rejected-Finance L2 |
| 3 | L3₹1.1 Cr+₹38.3 L (54.9%)Rejected-Finance SHOP NO 10 BMC SHOPPING CENTRE MITHA NAGAR GOREGAON WEST MUMBAI 400 104 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400104 | ₹1.1 Cr+₹38.3 L (54.9%) | L3 | Rejected-Finance L3 |
| 4 | L4₹1.1 Cr+₹39.6 L (56.7%)Rejected-Finance PLOT NO 1134 1196 MORIVALI VILLAGE TAL AMBARNATH DIST THANE AMBERNATH 421505 | AMBERNATH | THANE | MAHARASHTRA | 421505 | ₹1.1 Cr+₹39.6 L (56.7%) | L4 | Rejected-Finance L4 |
| 5 | L5₹1.1 Cr+₹40.3 L (57.7%)Rejected-Finance GALA NO B 128 129 130 SATYAM INDUSTRIAL ESTATE OFF KARVE ROAD OPP SNDT COLLEGE ERANNDWANE PUNE 411038 PUNE MAHARASHTRA 411038 | PUNE | MAHARASHTRA | 411038 | ₹1.1 Cr+₹40.3 L (57.7%) | L5 | Rejected-Finance L5 |
Tender Value
₹1.1 Cr
EMD Value
₹1.9 L
Closing Date
12 Nov 2024, 6:00 pmClosed
COL SAIKAT DE CWE NAVY VASCO
CWE NAVY VASCO VASCO DA GAMA GOA 403802
REPAIR MAINTENANCE INCLUDING MANNING OPERATION OF AC PLANTS AT BGRP WED NSD INCLUDING DG SET INSTALLATION AT PATANJALI COOL COLD ROOM AND 6000 WAREHOUSE UNDER GE (SB) KARWAR
2024_MES_678624_1
85843/E8
Open Tender
Electrical and Maintenance Works
Item Rate
334 days
CWE NAVY VASCO
AS PER TENDER DOC
9 documents required · 9 mandatory
₹1,000
GE (SB) KARWAR
₹1.9 L
Yes
31 Jan 2025
8 Oct 2024
14 Nov 2024
8 Oct 2024
12 Nov 2024
29 Oct 2024
Amount
SCH 'A' PART-I (M & O OF AC PLANTS)
Manning & operation of central AC plant DX Unit at WED, ( 2x30 TR working and 01 x 30 TR stand by) (Make :- BLUE STAR, Model No. WCUS2-030 condensing unit complete of 3 Nos. complete with cooling tower AHU & other accessories each for 24 hrs 3 shifts around the clock run daily
a) Water cooled unit model WCUS2-30 -03Nos.
b) Condeser water pump set Model BWC 80/100 capacity 102 CMH at 25 Mtr head , Make -Becon Weir Ltd -03Nos
c) Condeser water pump motor Model ND-112 M capacity 5 HP, Make - Crompton Greaves -03Nos
d) Air handling unit with blower motor-01 No. Make - Blue Star Model ESHX 4-420 of 41000 cmh
e) FRP Cooling tower capacity 113 USGPM ,Model AQ 3822 with CT fan-03No. Make Paharpur
f) Electrical control panel cubical type floor mounted with maint switch MCB's voltmeter , Ammeter, Starter Condenser etc. complete-01Set.
g) Control devices such as expansive valve thermostat solenoid valve HP/ LP/CP cut outs with panel board installed gauges-01 Set.
h) Digit type thermometer-01 Set
j) Air supply duct with grill diffusers dampers and heater etc.complete-01 Set.
k) Condenser piping MS 100/80/50mm dia with valves pressure gauge temperature gauge complete -1Set.
Manning & Opeartion of Central AC Plant DX unit of capacity 3X30 TR ( 2x30 TR working and 01 x 30 TR stand by) (Make :- BLUE STAR, Model No. WCUS 2-030 at NSD complete with cooling tower, AHU & other accessories in 03 shifts as per timings decided by Engineer in charge for efficient and continuous running / operation of central AC Plant and its electrical panel board with other installation / equipments as mentioned below:-
(a) Water cooled DX unit model LCUS2-030 - 03 Nos
(b) Condenser water pump model 2U1 capacity of 17 CMH at 25 Mtr head, Make-Becon Weir Ltd -03 Nos.
(c) Contenser water pump motor Model ND-112 m CAPACITY 5 HP, Make-Crompton Greaves -03 Nos
(d) Air handling unit with blower motor heater bank, cooling coil, electric control panel, complete, installed in AHU room-01 No. Make-Blue star Model ESHWX 6-160 of 17000 CMH
(e) FRP Cooling tower capacity 75 USGPM, Model AQ 3831 with CT fan-03 Nos Make Paharpur (2 No working and 1 No standby)
(f) Electrical control panel cubical type floor mounted with maint switch MCB's volmeter, Ammeter, Starter Condenser etc. complete-01 set
(g) Control devices such as expansive valve thermostat solenoid valve HP/LOP/CP cut outs with panel board installed gauges-01 set.
(h) Digit type thermometer - 01 set
(j) Air supply duct with grill diffusers dampers and heater etc complete - 01 set
(k) Condenser piping MS 100/80/50 mm dia with valves pressure gauge temperature gauge complete -1 set.
Manning and operation of Warehouse central AC plant at MO of capacity of 26 ton-03 Nos. ( 2 W ,1 S) Make : Blue Star, Model No. XWC2S-026 running daily 24 hrs. in 3 shifts as per timings decided by Engineer in charge for efficient and continuous running / operation of central AC Plant and its electrical panel board with other installation / equipments as mentioned below
a)Water cooled unit model XWC2S-026 -03Nos. b)Chilled water monoblock pump set Model KDI 830++ capacity 5 HP, Make -Kirloskar, Discharge-10 lps Head- 17-26m -02 Nos c)Condeser monoblock pump set Model KDI 527++ capacity 7.5 HP, Make -Kirloskar, Discharge-14 lps Head- 18-29m -02 Nos d)Air handling unit with blower motor-01 No. Make - Zeco Model – ZDS-250 of 26000 CFM e)FRP Cooling tower capacity 260 USGPM, Model CM4/7.5/ E/3 with CT fan-01 No. Make Mihir f)Electrical control panel cubical type floor mounted with maint switch MCB's voltmeter , Ammeter, Starter Condenser etc. complete-01Set. g)Control devices such as expansive valve thermostat solenoid valve HP/ LP/CP cut outs with panel board installed gauges-01 Set. h)Air supply duct with grill diffusers dampers and heater etc.complete-01 Set. i)Condenser piping MS 100/80/65mm dia with valves pressure gauge, temperature gauge complete -1Set
Manning and operation of package type AC plant at BGRP of capacity of 7.5 ton-03 Nos. ( 2 x 7.5 TR working and 1x 7.5 TR standy) Make : Blue Star, Model DPW-1322 S running daily 8 hrs. 01 shift for smooth functioning of entire system and to maintain specific temperature as directed complete. AC plants consists of the following accessories:-
a) Package type Air conditioning Plant sealed compressor condenser Model DPW 1322S-02 Nos. (1 W,1S)
b) Condenser water pump motor Model BWC-40 capacity 102 CMH at 25 mtr head , Make Becon Weir Ltd- 03 Nos
c) Condenser water pump motor Model ND-90L capacity 3 HP Make- Crompton Greaves-03 Nos
d) FRP type Cooling tower with blower motor Model AQ 3810 , capacity 30 USGPM , Make Paharpur-03 Nos.
e) Electric control panel cubical type main switches,, starter voltmeter, ammeter contractors -01Set.
f) Control devices such as expansive valve thermostat solenoid valve HP/ LP/CP cut outs with panel board installed gauges-01 Set.
g) Sealed AHU with cooling coil and blower motor-02Set.
h) Ducting for supply air with grills diffusers dampers per and re heater etc.-01Set.
Manning and operation of DG set 2 Nos 320 KVA capacity each ( one working and one standby) installed at INHS Patanjali for three (03) shifts round the clock on all days including Sunday and holiday comprising the following equipment all as directed by Engineer -in -charge .
(a) Engine Model No 7BD2 V12 MKII HP-396 ,Alternator 320 KVA ,3 phase 415 Volts Make Crompton Greaves Ltd -02 Nos
(b) AMF panel/Synchronise panel rating 2x320 KVA 415 Volts 3 phase with accessories such as ACB 800 Amps 50 KA -02 Nos Auto/main control relay -02 Nos and digital metering etc -01 Nos
(c) LT distribution panel 3 phase 415 Volts with accessories such as ACB 1000 Amps 65 KA -02 Nos .MCCB 800 Amps -02 Nos MCCB 630 Amps -02 Nos MCCB 250 Amps -01 Nos.
(d) DG Auxilary panel-01 Nos
NOTE FOR Item No 4-
(i) The unit rate quoted shall be deemed to be include for daily routine maintenance as detailed below for trouble free functioning of DG Set and equipment.
(a)Checking /rectifing of loose connections.
(b) Maintaing rhe general clearance of the installation
(c) Check the water /coolent level in radiator & top up as and when required .check oil level & fuel and inform Engr-in-charge.
(d) Check oil level & fuel and inform Engr-in-charge.
(e) Check level of electrolyte in battery and top up if required.
(f) Check battery terminal and if founf loose /tight properly.
(vii) Fuel will be issued by Department through issue voucher free for consumption only for DG Sets.
Note for item No.1 to 5
(a) Contractor has to employ following staff for manning & operation of the AC plants at each shifts of 8 hours
(i) One No operator having minimum ITI qualification in Ref Mech/Electrician trade from Govt recognised institute with minimum 2 years experience in maintenance & operation of AC plants in each shift of 8 hrs (. The operator must be competent to caryout the routine maintenance & check of AC plant including maintenance/check/inspection of electrical panel board. for Sl Item No 1 to 4
(ii) One No operator having minimum ITI qualification in FGM/Electrician trade from Govt recognised institute with minimum 2 years experience in maintenance & operation of DG set in each shift of 8 hrs (. The operator must be competent to caryout the routine maintenance & check of DG set installation including maintenance/check/inspection of electrical panel board. for Sl Item No 5
(b) Contractor will maintain proper records of all kinds of daily, weekly , monthly, quarterly, half yearly, yearly or whatsoever maintenance is carried out during contract period in a binded book/register and will obtain the signature of Engineer-in-Charge
(c) The operator will ensure general cleanliness and upkeep of the installation on daily basis.
(d) The routine maintenance/checks shall be strictly carried out by the operator all as per the list of routine maintenance activities with periodicity as per appendix 'A' to PS hereinafter attached.
(e) The unit rate quoted shall deemed include for maintenance for earthpits, cutting & removing of vegitation and upkeep of the surrounding area, all around the bldg upto 6m from the plinth protection all as directed by Engr-in-Charge. In case of failure, a penalty of Rs 2000/- per month will be levied and recovered from dues. . (f) The contractor shall provide 02 uniforms to each operator & helper and design of uniform shall be got approved. In case of failure, a penalty of Rs 2000/- per uniform will be levied and recovered from dues. (g) In case of failure due to absence of operative staff, the contractor shall be liable to pay compensation at twice the cost of a day’s Manning & Operation derived from pro rata rate of Sch ‘A’ quoted rates.
(h) Defective parts of plants will be replaced and measured under respective item of this schedule.
(i)Power supply for operating the installations will be made availiable by department free of cost.
SCH 'A' PART-II (ROUTINE MAINTENANCE OF AC PLANTS)
M&L dismantling electric motor of any make, 3 phase 415V of following capacity, opening the motor for rewinding using super enamelled copper wire of suitable gauge to match with the existing winding as per manufacturer design including varnishing & drying and re-assembling the motor, connecting with proper alignment and testing complete including transporting to workshop for rewinding complete all as directed.
M & L for Servicing of water pump split casing type set by removing & dismantling pump and connected pipes & electric connections etc and replacing of unserviceable parts with new gland packing set Gun metal bushes, bearing, water seal packing complete cleaning of impeller greasing etc reassembling and refixing in original position complete with packing and necessary nut & belt etc including testing for smooth functioning etcof following capacity all as specified and directed.
(a) 5 hp at WED/NSD
(b) 3 hp at BGRP
Taking out old unserviceabe scroll compressor 13 TR capacity from the unit after disconnecting electrical wiring and piping connections , nuts and bolts etc and Supply and fixing new scroll compressor 13 TR capacity and connecting pipe line for existing piping brazing and electric connection etc complete all as specified and directed.
All as per item No 8 above but for 7.5 TR Capacity.
M & L for disconnecting condenser for descaling & Plugging them & providing of 15 mm tee out let for local circulation of mild acid solution in the condenser (separate container and small pump set to circulate diluted acid solution to be used) PH value of solution to be circulated & to be kept 4 and checking frequently i.e. every one hour during the operation Scalgun WS solution to be used for descaling purpose after 2 to 3 hours of cleaning if ph value remains less than 7 flush with fresh water mixed with sodium carbonate tubes and cleaning with nylon brush after closing the end covers, circulating diluted acid solution as specified above & PH value to be maintained as above & flushing the same with fresh water including recharging of stored refrigerant up to required pressure complete all as specified & directed by EIC of for 30 TR at WED/NSD
Pumping down the plant to preserve the existing refrigerant gas & leak testing chiller plant by charging of Nitrogen gas in to entire plant & monitoring for 24 hrs to find the leakages rectification of leak by brazing/ Capping leaked tubing & replacement of necessary gasket packing as wherever required including copper tubes of suitable size vacuumising of the plant by vacuum pump & keeping 24 hrs for testing including rectification of leakages if any finally recharging of existing refrigerant gas to the plant and and topping up of refrigerant if required to maintain the standard pressure complete testing of the plant for smooth functioning complete.
(a) 30 TR chiller unit at WED/NSD
(b) 7.5 TR chiller unit at BGRP
(c) 22 TR chiller unit at NCN
Supply & charge refrigerant (R - 22) gas as per requirement
Topping up / Replacement of compressor oil with new compressor oil of Make :- Frizol 68 or equivalent all as specified and directed by EIC
Supply & Fix in repair & complete all as directed.
(a) Water Flow Switch complete all as directed .
(b) Moisture liquid indicators complete all as directed. Make: B/M or equivalent.
(c) Single phase preventor for compressor /Motor for SM 101 GIC or eqv in L&T/Minilec/ABB
(d) Strip type 3 KW Heaters
(e) Strip type 2.0 KW Heaters
(f) Pressure gauge 0-300 PSI .
(g) Pressure gauge 0-150 PSI
(h) Filter drier core for 30/22 TR Central AC Plant
(j) LP/HP cut out switch for 30/22 TR Central AC Plant
(k) Float Valve for 25 mm
(l) Cooling tower fins of size 4'x6'
(m) AHU belt Make : Fenner/Dunlop
(n) Mercury in glass industrial type thermometer
M&L for applying one coat of synthetic enamel paint as per colour code with spray machine on surfaces of 3x30 TR central AC plant comprising compressor motor, Pump, water pipe lines etc by filling cavities if any with filler including preparation of surfaces & indication markings all as specified and directed. WED/NSD
M&L for applying one coat of synthetic enamel paint as per colour code with spray machine on surfaces of 3x7.5 TR central AC plant comprising compressor motor, Pump, water pipe lines etc by filling cavities if any with filler including preparation of surfaces & indication markings all as specified and directed. BGRP
M&L for applying one coat of synthetic enamel paint as per colour code with spray machine on surfaces of 3x22 TR central AC plant comprising compressor motor, Pump, water pipe lines etc by filling cavities if any with filler including preparation of surfaces & indication markings all as specified and directed.NCN
Taking down motor, blower fan assembly from cooling Tower, removing unserviceable fins , & providing new PVC fins of size 4"x6" ,after cleaning of Louvers, drift eleminators fill surface by moderate pressure water nozzle to remove all surface impurities incl removal of rust/scale, scrapping down the hard water deposited from bottom tray with chemical and preparing the surfaces and painting with one coat of anticorrosive paint to match with existing colour, servicing of fan and motor assembly including removal of dust, oil, scale of motor body and replacing of unserviceable nozzle,bearings , painting with anti corrosive paint, draining and filling of bearing housing with new SAE 20 grade mineral oil, greasing of bearing with IOCL mobilux etc , & reassembling complete of following cooling towers
(a) FRP Cooling tower capacity 131 USGPM Make Paharpur AT WED/NSD
(b) FRP Cooling tower capacity 30 USGPM Make Paharpur AT BGRP
Note: (a)Defective parts of plants will be replaced and measured under respective item of this schedule. (b) Fins, float valve reqd for replacement will be measured under under respective item of this schedule.
Supply & fixing in repair Nitrile insulation layers of size 25 mm thickness sticking on the chiller surface by using approved adhesive and ceiling joint by weather proof tape after removing unserviceable nitrile insulation from the chiller & cleaning complete all as directed by Engineer-in-charge.
(a) Supply & Fix in repairs MS pipe heavy grade 80 mm dia including removing of unserviceable MS pipe medium grade of 80 mm dia all as specified & directed
(b) Supply & Fix in repairs MS pipe heavy grade 100 mm dia including removing of unserviceable MS pipe medium grade of 100 mm dia all as specified & directed
(c) Supply & Fix in repairs MS pipe heavy grade 40 mm dia including removing of unserviceable MS pipe medium grade of 40 mm dia all as specified & directed
(d) Supply & Fix in repairs MS pipe heavy grade 50 mm dia including removing of unserviceable MS pipe medium grade of 50 mm dia all as specified & directed
(e) Supply & Fix in repairs butter fly valve 50 mm dia including removing of unserviceable butter fly valve of size 50 mm dia all as specified & directed.
(f) Supply & Fix in repairs butter fly valve 80 mm dia including removing of unserviceable butter fly valve of size 100 mm dia all as specified & directed.
Supply and fixing in repair expansion valve for 30/22 TR AC plant as per exisiting make complete all as specified and directed.
Supply and fixing in repair expansion valve for 7.5 TR AC plant as per exisiting make complete all as specified and directed.
Supply and fixing in repair fine filters 5 Microns as per exisiting size and make complete all as specified and directed.
Supply and fixing in repair pre filters 10 Micron as per exisiting size and make complete all as specified and directed.
M&L in repair duct insulations with resin bonded fiber glass wool density 24 Kg/Cum with laminated aluminium barriers thick 50 mm and including following :- (a) Cleaning the duct surface. (b) Applying rubber based adhesive CPRX compound. (c) Ceiling all joints and circular cover laps including alumunium foil taps 50 mm size 12/50 mm maximum intervals 1.2 mtrs.
Removing side panel of AHU of any capacity, dismantling of AHU carefully removing unserviceable blower bearings and removing motor and blower assembly , replacement of AHU blower bearings after machining of shafts, cleaning bottom tray of AHU and refixing electric motor and top side panel in origial position with new bolts washers and shafts keys and bottom of tray and checking the shafts balancing and testing for smooth running all as specified and directed.
M & L for repair of impeller of monoblock pump set of capacity 5HP split casing type set by removing & dismantling pump and complete cleaning of impeller greasing replacing of unserviceable coupling ,etc reassembling and refixing in original position complete with packing and necessary nut & belt etc including testing for smooth functioning all as specified and directed.
M & L for repair of impeller of monoblock pump set of capacity 5HP split casing type set by removing & dismantling pump and complete cleaning of impeller greasing replacing of unserviceable coupling ,etc reassembling and refixing in original position complete with packing and necessary nut & belt etc including testing for smooth functioning all as specified and directed.
Supply & Fixing in repairs aluminium busbar of rated capacity 200A, covered with PVC insulated sleeves including insulator, nuts, bolts, etc. with complete connection complete all as specified and directed.
Supply & Fixing in repair LED phase indicators (Red, Yellow, Blue)
Supply & Fixing in repair Digital multi function meter with 63/5 CT capable of measuring V, A, F, PF, W/VA, WH, Vah, Runhrs, Onhrs & interrups-
Supplying, fixing, testing and commissioning in repair of Balancing Valve of 80 mm with built in measuring facility with C I body flanged construction with EPDM coated disc with long pitch with protected out pipe insulation & PN 16 pressure rating for chilled water circulation, in the chilled/hot water plumbing duly insulated to the same specifications as the connected piping and adequately supported as per specifications complete all as specified and as directed.
Supply & fixing in repair digital display thermo hygrometer measuring temp and RH to be installed in conditioned space, complete all as specified and as directed.
M & L earthing complete with GI earth plate electrode of size 60cmx60cmx6 mm thick, buried directly in ground (earth pit not less than 2.25m deep below normal ground level) with top edge of the earth plate not less than 1.5m below normal ground level connected with GI strip 32 x 6 mm by means of bolts, nuts, checknuts and washers of galvanised iron or steelincluding necessary excavation and earth work in any type of soil, removing surplus soil to a distance not exc 50m, with and including PCC chamber in PCC(1:2:4) type B1, using (20 mm graded stone aggregate),"mild steel angle iron frame" made out of MS angle iron of size 40x40x6 mm thick duly painted with two coats of synthetic enamel paint over one coat of red oxide zinc chrome primer hinged with and including 10 mm thick CI cover with handle, watering arrangement with funnel internally secured with wire mesh with 20mm dia medium grade GI pipe for watering, 40 mm dia light grade, GI pipe for lead protection in & including alternate layers of charcoal dust and common salt complete all as shown in electrical "Plate No-3 of SSR Part-I-2009" and connected to earthing test point all as specified and as directed including testing on completion.
Supplying, fixing, testing and commissioning in repair of Y - Strainer of Ductile CI Body flanged ends with stainless steel strainer for chilled water circulation of size 80 mm, in the chilled/hot water plumbing duly insulated to the same specifications as the connected piping and adequately supported as per specifications complete all as specified and as directed.
Supplying, fixing, testing and commissioning in repair of NON - RETURN VALVE with dual plate of C I body SS plates vulcanized NBR seal flanged end & PN 16 pressure rating for chilled water/condenser water circulation of size 80 mm, in the chilled/condensor water plumbing duly insulated to the same specifications as the connected piping and adequately supported as per specifications complete all as specified and as directed.
Supply and fixing in repair in position the following Ball Valves 25 mm dia for makeup line as per specifications complete all as specified and as directed
Supplying, installing, testing and commissioning of Fresh Air powder coated Anodized extruded aluminium construction fresh air louvers (50 mm deep) (Fresh air louver with VCD , bird screen & rattle-free) complete as per specification complete all as specified and as directed
Supplying ,laying , fixing & testing of following sizes of XLPE insulated,armoured heavy duty electric cable with aluminium conductor,1100 volts grade complete as required and as directed
4C- 10 sq mm
4C- 6 sq mm
Supply and fixing in repair amp rating 240V, 10KA 'C' curve miniature circuit breaker (MCB) SP of 6 to 32 Amps current rating complete with connection testing and commissioning.
Manufacture, supply, installation and commissioning in repair of the following extensible cubical type indoor mounting powder coated, modular compartmentalized IP 42, dead front, dust and vermin proof, floor mounting 2 mm thick sheet clad switchboard suitable for use at 415 volts 3 phase 4 wire 50 cycle system.
Incomer: MCCB 63A 4P 25KA 1 NO Outgoing 1) MCCB 63A 4P 16KA -3 NOS (For star dela starter 10HP) 2) MCCB 40A 4P 16KA -3 NOS (For heating arrangement sysem) 3) MCCB 63A 4P 16KA - 3 NOS (For exhaust blower starter) 1 No. 6 amps 2 Pole MCB for fire damper actuator. 1 No. 6 amps 2 Pole MCB for control circuit NO/NC Contact for BMS as if required.
Note:- The following provisions shall be required to be made in the switchboard detailed below (a) The switchboard shall have provision for entry of all XLPE cables from the top/bottom as required. (b) All live accessible parts shall be shrouded and all equipment shall be finger touch proof. The bus bar insulation shall be with heat shrinkable sleeves. SMC/DMC shrouds and bus bar supports shall be used.
(c) Suitable tinned copper extension links for incoming/outgoing cables shall be provided whenever required. (d) space heater/light/air filter shall be provided for each vertical compartment. (e) Electrolytic high conductivity aluminium three phase and neutral busbars rated amps having a maximum current density of 1 amp (f) Starter Panel (g) AHU Panel(7.5KW AHU Fan Motor)
PART-III : ROUTINE MAINT OF DG SET 320 KVA
Opening the LT Panel board cubical type for DG set located in DG room, cleaning the Bus Duct chamber, inspect the complete panel, tighten the all incoming, outgoing ACBs/MCCB s/ SFU of different capacity, nuts, bolts, bus bar insulator and replace with new one if required and heating up for removal of moisture, record its IR value with the help of 1.1KV megger and applying thick coating of Z931 strippex B and Z 955 Strippex (SL) of stanvac product for preventing from flush over and fire hazard, including replacement of 3mm thick gasket, closing of all holes and charging the same complete all as directed.
All as per item No 50 hereinbefore but for main electric panel
All as per item No 50 hereinbefore but for DG auxiliary panel.
M&L for scrapping old paint and rust, cleaning and preparation of surface of DG set, DG set enclosures, diesel tank, rolling shutter of DG set, DG panel board and painting with synthetic enamel paint to match with existing colour and painting the exhaust pipe with aluminium paint complete all as specified and directed.
M&L for isolating earthing lead conductor from test point and measuring resistance value of earth pit complete all as specified and directed.
Supply and fix in repairs of AVR Model AS 440 of alteranator 3 phase 415 Volts of 320 KVA Make Stamford Alternator complete testing all as directed.
Supply and fixing in repairs of Rectifier service Kit of alteranator 3 phase 415 Volts of 320 KVA make Stamford Alternator complete testing all as directed.
Supply and Fix in repairs of new battery of 12 volts 180 AH battery all as specified and directed
Taking out the radiator from the engine up radiator fins descaling core for elimination of residual etc com[plete all as specified and directed.
Taking out & caliberation of fuel injection pump, testing complete and refixing the same to original position etc complete all as specified and directed.
Servicing of 320 KVA DG set of make Greaves Mode;l No 7 BD 2 V 12 MK II HP -396 , by opening up the rocker and cover, adjusting the rocker arm tappet gap, removing & cleaning the inlet & outlet valves, replacement of tappet cover gaskets, checking & adjusting fuel injection timing, removing the diesel feed pipes, cleaning throughly & pressure testing, removing the oil sump of engine, cleaning & replacement of Engine Oil , oil filters, fuel fitters, replacement of inlet manifold gasket, draining out diesel from diesel storage tank completely, cleaning the tank & drying, outlet & over flow pipes from tank to engine. including replacement of spare parts as require etc complete all as spcified and directed. Note- (i) Servicing of DG set has to be done by authorised service engineer of cummins only. (ii) Spare parts requred will be measured and paid separately. (iii) Unit rate quoted shall be deemed to be included removing and fixing spare parts.
Supply only following spares for routine maintenance of 320 KVA DG set Greaves Engine Model No 7BD 2v 12 MK-II HP-396 under item no 18 hereinbefore
(a) Fuel filter cartridge 6.0541.18. 08.008 set with packing ring complete all as specified .
(b) Engine oil filter cartridge 6.0541.18. 08.008 set complete with'O' ring complete all as specified .
(c) Greaves Maxthem engine oil or equivalent SAE 30 grade oil all as directed.
(d) Coolant Concentrate
(e) Pre filter Cat Part No . 1200240911
(f) Microfilter Cat Part No 1200240912
PART-IV :ROUTINE MAINT COLD & COOL ROOM
M&L for rectification of defects and making functional cold room,cool room of any capacity incl rectification of minor defect such as tripping of MCBs, replacement of MCBs labour only wherever necessary, rectifying loose electrical connections, making fresh connections in electric panel / connectorr etc, making functional of defective drain pipe blockage/leakage etc, checking of functionality of compressor of any capacity etc complete all as specified and directed. Note :- (i) Unit rate quoted shall include for maintaining proper record and obtain the signature of concerned user unit. (ii) Unit rate quoted shall include for sundry items / materials as required.
Cool room with capacity 4 ton reciprocating compressor
Cold room with capacity 9 ton reciprocating compressor
Supply only R-134 A refrigerant gas in sealed container.
Supply only R-404(a) refrigerant gas in sealed container.
Labour only for gas charging with required quantity with R-134 a and R- 404 arefrigerant gas including all allied works such as vaccumising the complete system, soap leak test, nitrogen gas pressure test, replacement of copper filters, capillary, copper tubing of suitable size and required length, flux, flare nut, dead plug, dead cap, brazing etc including necessary welding work, testing and commissioning upto satisfactory performance for the following :- Note :- Qty of gas will be measured and paid separately.
Refrigeration circuit of cool room of capacity 4 Ton.
Refrigeration circuit of cold room of capacity 9 Ton.
S&F in repair as per existing new fan / blower motor, single end shaft, single phase, 240 volts, 2 HP metallic body including fan blade assembly suitable for 9 TR and 4 TR make Alstom/Marthom for outdoor unit of floor mounted AC complete all as specified and directed.
S&F in repair single phase preventer cum controller for operation of floor mounted AC of 4 and 9 Ton capacity.
S&F in repair HP/LP cut out for floor mounted AC of 4 and 9 Ton capacity complete all as specified and directed.
Supply and fixed in repairs expansion valves thermostatical type for cold storage of capacity 9 ton compressor complete all as specified and directed.
Supply and fixed in repairs expansion valves thermostatical type for cold storage of capacity 4 ton compressor complete all as specified and directed.
Supply and fixed in repairs filter drier model DG -304 suitable for refrigerant 404 (a) for cold storage of capacity 9 ton compressor complete all as specified and directed.
Supply and fixed in repairs filter drier for cool room suitable for refrigerant 134 (a) of capacity 4 ton compressor complete all as specified and directed.
S&F 3 phase Contactor Make : ABB Model No ( A-16-A-30-10-240Volt) suitable for 9TR compressor of Cold room complete all as specified and directed.
S&F 3 phase Contactor Make : ABB Model No ( A-9-30-10-240 Volt ) suitable for 9TR compressor of Cold room complete all as specified and directed.
S&F 3 phase Contactor Make : ABB Model No ( B-25-30-10-240 Volt ) Volt suitable for 9TR compressor of Cold room complete all as specified and directed.
S&F in repair 8 Pin Pla relay suitable for 4TR and 9 TR compressor of Cold room & Cool room complete all as specified and directed.
S&F in repair 3 phase Contactor Make : ABB Model No ( B-9-30-10-240V) suitable for 4TR compressor of Cool room complete all as specified and directed.
S&F in repair 3 phase Contactor Make : ABB Model No ( MNX-18-240) suitable for 4TR compressor of Cool room complete all as specified and directed.
Supply and fixing in repairs sub zero suitable for 4 TR and 9TR compressor complete all as specified and directed.
Supply and fixed in repairs overload relay for capacity 9 ton and 4 Ton compressor complete all as specified and directed.
Supply and fixed in repairs cassette AC indoor PCB for 1.5 TR complete all as specified and directed.
somnath engineering corporation (BID ID -3157016)
Shree Ayyappa Engineering (BID ID -3158178)
shakti engineering and electrical works (BID ID -3163315)
M/s Vijay Airconditioning Pvt Ltd (BID ID -3163521)
sapana enterprises (BID ID -3163452)
pk Enterprises (BID ID -3163247)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .