| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.4 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹11.4 L+₹2,644 (0.23%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹12.8 L+₹1.3 L (11.7%)Admitted-Finance 02 | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S MUDRAWATI L2 | M/S DURGA ENTERPRISES L3 | M/S MISHRA CONSTRUCTION CO L1 |
|---|---|---|---|---|---|---|
| 1.10WORK UNDER EDD-HARRAIYA, BASTI | ||||||
| 2.00 | Loading, Carrige & Safe Unloading of 11 KV VCB From Store to site of work Substation Hyidarabad | 1 | No | 15,450 ₹15,450 | 15,452 ₹15,452 | 15,448 ₹15,448 Lowest |
| 3.00 | Loading carraige & Unloading of PCC Poles 8.5 mtr from store to site Hardiya under S/S Hyidarabad | 130 | No | 1,33,900 ₹1,33,900 | 1,34,030 ₹1,34,030 | 1,33,640 ₹1,33,640 Lowest |
| 4.00 | Loading carraige & Unloding of Remaining HT Line Weasal with XLPE & other material , from store to site Keahawapur under S/S Hyidarabad | 1 | Job | 15,450 ₹15,450 | 15,452 ₹15,452 | 15,448 ₹15,448 Lowest |
| 5.00 | Errection of Single PCC Pole with all fitting at Vill Hyidarabad | 130 | No | 1,18,950 ₹1,18,950 | 1,19,340 ₹1,19,340 | 1,18,690 ₹1,18,690 Lowest |
| 6.00 | Grouting of PCC with Cement Bricks Ballast & coarse sand as per satnderd specifications | 130 | Job | 1,17,000 ₹1,17,000 | 1,17,520 ₹1,17,520 | 1,16,740 ₹1,16,740 Lowest |
| 7.00 | Laying, Stringing, Tensioning & Binding of New wesal Conduter for HT 11 KV Overhead Line | 20 | Km | 20,600 ₹20,600 | 20,700 ₹20,700 | 20,560 ₹20,560 Lowest |
| 8.00 | Earthing of PCC Pole satnderd specifications | 130 | No | 1,13,100 ₹1,13,100 | 1,13,880 ₹1,13,880 | 1,12,840 ₹1,12,840 Lowest |
| 9.00 | Digging & Laying of 11KV Cable in Trench with Sand & Bricks | 100 | Mtr | 26,000 ₹26,000 | 26,700 ₹26,700 | 25,800 ₹25,800 Lowest |
| 10.00 | Making of 11 KV Jointing Kit | 1 | Job | 3,090 ₹3,090 | 3,098 ₹3,098 | 3,088 ₹3,088 Lowest |
Tender Value
Refer Docs
EMD Value
₹12,000
Closing Date
18 Sept 2025, 2:00 pmClosed
SE EDC BASTI
SE EDC BASTI
Work of Haidrabad Feeder Separation under Business Plan Head 2025 26 under EDD HARRAIYA Basti
2025_PVVNV_1068337_2
38/EDC(B)/2025-26
Open Tender
Electrical Works
Lump-sum
BASTI
AS PER TENDER
2 documents required · 2 mandatory
₹3,540
SE EDC
₹12,000
22 Sept 2025
12 Sept 2025
19 Sept 2025
12 Sept 2025
18 Sept 2025
12 Sept 2025
WORK UNDER EDD-HARRAIYA, BASTI
Loading, Carrige & Safe Unloading of 11 KV VCB From Store to site of work Substation Hyidarabad
Loading carraige & Unloading of PCC Poles 8.5 mtr from store to site Hardiya under S/S Hyidarabad
Loading carraige & Unloding of Remaining HT Line Weasal with XLPE & other material , from store to site Keahawapur under S/S Hyidarabad
Errection of Single PCC Pole with all fitting at Vill Hyidarabad
Grouting of PCC with Cement Bricks Ballast & coarse sand as per satnderd specifications
Laying, Stringing, Tensioning & Binding of New wesal Conduter for HT 11 KV Overhead Line
Earthing of PCC Pole satnderd specifications
Digging & Laying of 11KV Cable in Trench with Sand & Bricks
Making of 11 KV Jointing Kit
Tree Branch cutting Charge
Installation of Comisoning Charges
Extention of Control Room
Concreting of Poles
Concreting of Stay
Decenterlized Matetial (With GST)
Clamp for Top,T-off, X-arm, Gaurding Angle
Supply of Nut & Bolt
F-Bracket
Barbed Wire
Danger Board with Clamp
M/S MUDRAWATI (BID ID -5543442)
M/S DURGA ENTERPRISES (BID ID -5542154)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .