| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.9 LAccepted-AOC | L1 | Accepted-AOC Being lowest and reasonable | |
| 2 | L2₹37.9 L+₹5.6 L (17.4%)Rejected-Finance | L2 | Rejected-Finance Not being lowest | |
| 3 | L3₹51.0 L+₹18.8 L (58.1%)Rejected-Finance | L3 | Rejected-Finance Not being lowest |
Tender Value
₹38.5 L
EMD Value
₹77,000
Closing Date
4 Sept 2023, 6:00 pmClosed
GARRISON ENGINEER I R nd D WEST BANGALORE
GARRISON ENGINEER I R nd D WEST BANGALORE, DRDO COMPLEX, CV RAMAN NAGAR
PERIODICAL MAINT REPAIRS TO RADAR OTP MISC REPAIRS TO FIRE ALARM AND SAFETY SYSTEM, LOOP CARD WATER SPRINKLER SYSTEM SMOKE DETECTORS AND REPAIRS TO LT PANEL BOARD AT LRDE TECH AREA BENGALURU
2023_MES_604658_1
GE(I)/R ND D/BAN/TOKEN/44 OF 2023-24 8197/E8
Open Tender
Civil Works
Item Rate
330 days
GARRISON ENGINEER I R nd D WEST BANGALORE
CLASS AND CATEGORY AS PER NIT
9 documents required · 9 mandatory
₹500
GARRISON ENGINEER I R nd D WEST BANGALORE
₹77,000
20 Oct 2023
28 Jun 2023
11 Sept 2023
29 Jun 2023
4 Sept 2023
21 Aug 2023
29 Jun 2023 - 13 Jul 2023
Amount
Disconnecting electrically operated squirrel cage crane heavy duty motor of cap 13.4 HP, AC 3 phase, 415 Volts from existing location of electro mechanically driven winch unit by unscrewing of nuts, bolt and dismantlling all parts carefully, checking all components in and including servicing, greasing, oiling etc as applicable for smooth functioning complete all as per site requirements and reassembling, alignment of motor complete with electro mechanically driven winch unit and testing complete all as directed by Engineer-in-charge.
Disconnecting motor of cap 1 HP 3 Phase 415 Volts in respect of locking pin unit from existing location of RTP by unscrewing of nuts, bolt and dismantlling all parts carefully, checking all components in and including servicing, greasing, oiling etc complete all as per site requirements and reassembling, alignment of motor complete with the existing pin unit and testing complete all as directed by Engineer-in-charge. Note for Sl No. 1 to 2 : (i) If motor condition demands varnishing / insulation or rewinding works during servicing, the same shall be measured and paid separately under relevent item of this schedule.
Labour only for applying Greasing to spindles, guide rollers, platform locking pins etc arrangements of winch assembly unit - 01 No using necessary tools and plants, gease gun etc after dismanling all components carefully, removing of existing old grease and other lubricating materials from all parts by rubbing, scrapping and cleaning with the cotton waste, diesel and other cleaning material as applicable etc and applying fresh grease, assembling all parts carefully,alignment with winch unit properly testing complete all as directed by Engineer-in-charge.
Labour only for applying Black cadmium compound to hoisting mechanism wire ropes, rope drum and rope pulleys of winch assembly - 01 No using necessary tools and plants etc after dismanling all components carefully, removing of existing old cadmium compound and other lubricating materials from all parts by rubbing, scrapping and cleaning with the cotton waste, diesel or other any cleaning material as applicable etc and applying fresh cadmium compound, assembling all parts carefully, alignment with winch unit properly, testing complete all as directed by Engineer-in-charge.
Labour only for opening winch gearbox screws and nuts bolts, dismanling all components carefully, draining out existing oil from gearbox of winch assembly unit - 01 No using necessary tools and plants etc removing of old sludge and foreign material from gear box complete, overhauling of gear box parts complete and cleaning with the cotton waste, diesel or other any cleaning material as applicable etc and filling gear oil carefully, reassembling, alignment with winch unit properly, testing complete all as directed by Engineer-in-charge.
Labour only for disconnecting electro hydraulic thruster operated brake from winch assembly unit, dismantling all components carefully, draining out existing hydraulic oil using necessary tools and plants etc removing of old sludge and foreign material from thruster unit complete, overhauling of thruster brake system complete and cleaning with the cotton waste, diesel or other any cleaning material as applicable etc and filling hydraulic oil carefully, reassembling, alignment with winch unit properly testing complete all as directed by Engineer-in-charge. NOTE FOR SL No. 1 to 6 :- (i) The job shall be paid twice in the contract period with an interval of Three months periodcity. (ii) Grease, Black cadmium compound, Gear oil and Hydrullic oil as applicable shall be measured and paid separately under relevent item of this schedule as "SUPPLY ONLY".
Taking up defective electrically operated squirrel cage crane duty motor of cap 13.4 HP, AC 3 phase, 415 Volts from existing location, checking, measuring no load current, IR value and winding resistance using micro ohm meter before winding insulation / varnishing to windings and dismantling of motor, measuring stator and rotor ID, carry out dynamic balancing of rotor if required, applying insulation varnish material to windings after removal of defective varnishing/insulations etc, assembling of motor, carry out no load current and KW study and alignment of all the loosen parts including re-fixing, connections, testing and commisioning complete all as directed by Engineer-in-charge.
Taking up defective electrically operated squirrel cage crane duty motor of cap 13.4 HP, AC 3 phase, 415 Volts from existing location, checking, measuring no load current, IR value and winding resistance using micro ohm meter before rewinding works and dismantling of motor, taking out defective wires rewinding with best quality existing gauge copper of existing gauge with new insulation materials, varnishing, heatinng, reassembling, testing, assembling of motor, carry out no load current and KW study and alignment of all the loosen parts including re-fixing, connections, testing and commisioning complete all as directed by Engineer-in-charge.
Taking up defective motor, 3 phase, 415 Volts, AC 1 HP capacity from the existing location, dismantlling, removing the burn out winding, rewinding with same gauge copper wire, insulating, varnishing, reassemble parts, re-fixing in the same position, testing and commissioning complete all as directed by Engineer-in-charge.
Taking up defective mono block pumpset centrifugal motor of cap 5 HP AC 3 phase, 415 Voltscomplete from the existing location by unscrewing of nuts, bolt, dismantlling all parts, checking bushes, bearings and all other parts carefully, overhauling works to pump and motor complete in and includoing replacement of worn out bushes, bearings, rewinding works , varnish works complete as per site requirements and reassembling, alignment of motor with pump set complete in all respects, testing and commissioning complete all as directed by Engineer-in-charge.
Supply only Grease in 20 kg bucket for Greasing spindles, guide rollers, platform locking pins etc of Radar Test Platform all as directed by Engineer-in-charge. Make : Castrol (Premium longlife) or equivalent specifications as apporved by GE.
Supply only Black cadmium compound in 18 kg bucket for hoisting mechanism wire ropes, rope drum and rope pulleys etc of Radar Test Platform all as directed by Engineer-in-charge. Make : Balmerol (Bluecoat 2B) or equivalent specifications as apporved by GE.
Supply only Gear Oil 90 grade or equivalent type suitable for filling / top up in winch gear box as per site conditions all as directed by Engineer-in-charge.
Supply only hydraulic oil as per existing grade suitable for winch thruster break all as directed by Engineer-in-charge. Make for Sl No. 13 to 14 : Castrol/Shell/Servo.
Dismantlling, taking up old existing electro hydrulic Thruster operated brake assembly KTM type complete from the existing location of RTP winch unit with all connected items carefully by using necessary tools and plants, servicing, adjustament to brake system,repairing works as applicable for smooth functioning during entire currency of contract complete all as directed by Engineer-in-charge.
Material and labour for replacement of Break shoe assembly with liner complete all as directed by Engineer-in-charge.
Material and labour for replacement of Coupling suitable for 1 HP motor complete all as directed by Engineer-in-charge.
Supply and fixing for replacement break drum Coupling of size as per ground requirements suitable for winch unit as per site conditions complete all as directed by Engineer-in-charge.
Supply and fixing for replacement rotary limit switch near pin locking system of RTP type RLS -48, 415 Volts, 40 Amps as per site requirements complete all as directed by Engineer-in-charge.
Supply and fixing for replacement Lever type Limit Switch type - KLS, 415 Volts, 40 Amps complete as per site requirements all as directed by Engineer-in-charge Make - Radiant Machines Pvt Ltd or equ specifications model of any make as approved by GE.
Supply mounting fixing testing single avaition LED light fitting Red colour aluminium body complete ISI marked suitable for existing RTP site requirements including taking down old defective lights comlete all as directed by Engineer-in-charge.
Material and labour for replacement PVC insulated cable armoured copper conductor of size 1.5 Sqmm drawn through existing conduit of any type and size surface type including all accessories complete for RTP lights / avaition lights as applicable all as specified and directed by Engr-in-charge.
Supply fixing testing bulk head fitting LED LED 10 Watt outdoor type complete with necessary holes, clamp arrangements etc on RTP as per site requirements cluding taking down old defective lights comlete all as directed by Engineer-in-charge
Supply fixing testing and commissioning outdoor type push botton box 4 way of NO / NC 16 Nos system for RTP hoist, lower lock and unlock etc in and including connected wirings cluding taking down old defective NO/NC system comlete complete all as per site requirements all as directed by Engineer-in-charge.
Dismantling all cables carefully, Checking of existing electro driven Four winch units control panel control wirings, connected control fuses, relays, all connected parts and metering controls etc, taking out HRC fuses, over load protection relays and connected components, servicing,cleaning, resetting, caliberation of all items with alignment of operating panel, metering instruments including replacement of unserviceable minor nature parts and testing in all respects all as per site conditions, reconnections complete all as directed by Engineer-in-charge.
Taking down existing old and defective load cell displayweigh controller panel located on top of Radar testing platform in and including disconnecting control wires from existing load cells from rope anchor positions of height 30 mtr (Appx) and other connected wires/ items carefully using required tools and plants as per site conditions complete all as directed by Engineer-in-charge.
Supply, errection, fixing, caliberation, testing and commissioning of New electronics display weigh controller panel system on top of Radar Testing platform for weight monitoring system of existing weighing cap upto 80 Ton, weighing zone 8, No. of load cells - 08 Nos, 230 Volt, AC, rope type tension loadcell, loadcell cap 5 Ton, No of load cells - 08 Nos, weigh controller with 04 Nos sensors input side and 01 No sensor out put sidel,Power supply transformer module, Digitiliser - type Digital microprocessor based, input mV from loadcell through PCB display Digital 13 mm LED, No of display 4 (For individual weight) standalone mounting 230 Volts AC complete in all respects as per site requirement specifications complete all as directed by Engineer-in-charge. Note : (i) The firm is responsible to have a visit on RTP site before quotaing their amount for ibid job (ii) Item No. 29 shall be measured and paid separately as SUPPLY only and all other items and spares inclusive in the quoted rate no extra amount paid in this regards. Make-Electroweigh instruments or equivalent specification model of any make as approved by GE.
Supply only signal special cable as per site requirements of RTP complete all as directed by Engineer-in-charge.
Supplying and laying synthetic Rubber insulated mats 2 mm thick for voltage upto 3.3 kv for electrical purpose as per IS 15652-2006, (superseding IS 5424) suitable for electrical shock safety of sizes 2m x 1m including taking down defective item complete all as specified and as directed by Engineer-in-charge.
Checking Servicing of booster Pump of existing capacity , Greasing and Oiling of all Pump parts and Couplings, Checking the alignment of pump with motor, Coupling and shaft.,Checking of cable terminals ,foundation Bolt tightening as per site requirements complete, testing pump all as directed by Engineer-in -charge. Note : The job shall be paid twice in the contract period with an interval of Three months periodcity.
Supply and Installation for replacement Female Coupling Gun Metal of 63mm dia as per site requirements complete all as directed by Engineer-in -charge.
Supply and installaiton for replacement 63mm diameter Gun Metal Branch pipes with detachable gun metal nozzles as per existing and suitable site requirements complete all as directed by Engineer-in -charge.
Supply and installation for replacement RRL Hose - 15 Mtrs Long 63mm dia as per existing and suitable site requirements with one set of gun metal female and male instantaneous coupling complete all as directed by Engineer-in -charge.
Supply and Installation for replacement Glass for Hydrant Box with rubber beeding as per existing and suitable site requirements complete all as directed by Engineer-in -charge.
Supply and installaiton for replacement key for hydrant box as per existing and suitable site requirements complete all as directed by Engineer-in -charge.
Supply and installation for replacement Hydrant Lug for hydrant valve as per existing and suitable site requirements complete all as directed by Engineer-in -charge..
Supply and installation of Shut off Nozzle as per existing on site located at the end of rubber hose in the hose reel drum including taking down defective item complete all as directed by Engineer-in -charge.
Supply and Installation for replacement 8mm / 10mm Gland Rope for Jockey pump-01 No, Electrical Pump - 02 Nos, Booster pump - 03 No as per existing and suitable site requirements complete all as directed by Engineer-in -charge.
Supply and installation of Swing type hose reel drum with 19 mm diameter, 30 M long rubber hose including nozzles etc as per existing and suitable site requirements including taking down defective item complete all as directed by Engineer-in -charge.
Material and labour for One coat of synthetic enamel paint red colour and black colour etc all as per site best quality all weather protect proof type for Fire hydrants of 1.5 mtr height including fire hydrant valve handle and bottom sluice valve, handle etc complete all as directed by Engineer-in-charge
Labour for servicing checking caliberation testing of existing fire alaram panel, connected wiring system, detectors and devices of any type as per existing on site, panel make - Notifier/Ravel/Apollo in and including cables continuity, checking and clearing of fault in the system if any, activation of MCP settings and making serviceble entire system round the clock during currency of contract, location - RSH, A3MTDC and RADL of LRDE complex complete all as directed in Engineer -in-Charge.
Labour for servicing checking caliberation testing of existing fire alaram panel, connected wiring system, detectors and devices of any type as per existing on site, panel make - Notifier/Rvel/APOLLO in and including cables continuity, checking and clearing of fault in the system if any, activation of MCP settings and making serviceble entire system round the clock during currency of contract, location - RADAR BUILDING GF (01 No), FF (02 Nos), EMP (01 No) and MLCP (01No) LRDE complex complete all as directed in Engineer -in-Charge.NOTE FOR ITEM NOS 42 to 43 :- (i) All Spares inclusive in the quoted rate excluding items here-in-after mentioned (ii) The firm is responsible for making good false ceiling of any type distrubed during rectification / fixing of spares etc and the cost for the same is inclusive in the quoted rate complete all as directed by Engineer-in-charge.
Checking of water sprinkle fire fighting system infrastructure complete, rectifications of water leakages in the pipe lines, servicing all controls,testing of pressure of water in the lines and near all sprinkles properly and replacement of sprinklers / bulbs, setting of temoperature of sprinklers as per existing on the site as existing on earlier, tightening of all nuts, bolts and washers, testing system operation in all respects complete all directed by Engineer-in-charge NOTE : (i) All Spares inclusive in the quoted rate as per site requirements (ii) The firm is responsible for making good false ceiling of any type distrubed during rectification / fixing of spares etc and the cost for the same is inclusive in the quoted rate complete all as directed by Engineer-in-charge.
Supply and Installation of Single Loop Card which can support around 159 detectors and 159 devices suitable for site requirements including taking down defective item complete all as directed by Engineer-in-charge.
Supply and Installation of microprocessor controlled based 4 Zone Fire alarm Panel suitable for site requirements including taking down defective item complete all as directed by Engineer-in-charge.. Make - Ravel / Honeywell / Apollo or equ as approved by GE.
Supply and Installation of SMF Lead acid batteries for Fire alarm Panel suitable for site requirements including taking down defective item complete all as directed by Engineer-in-charge.
Supply installation testing of Photoelectric smoke Detector or smoke detectors of any type with Junction boxes as per site requirements make/ model including taking down defective item complete all as directed by Engineer-in-charge.
Supply and Installation of Manual call point with Junction boxes as per site requirements including taking down defective item complete all as directed by Engineer-in-charge.
Supply, Laying PVC copper cable FR 2 x 1.5 Sq mm armoured cable on surface of wall / ceiling/existing conduit of any type including taking down defective item complete all as directed by Engineer-in-charge.
Supply, Laying PVC copper cable FR 2 x 1.5 Sq mm cable on surface of wall / ceiling or drawn through existing PVC conduit or as per site conditions including taking down defective item complete all as directed by Engineer-in-charge.
Supply fixing testing Conventional Hooter, Wall mountable, 24 V DC Operation, Piezo Electric Type, Operating Voltage 24V DC, Operating Current 40ma as per existing make and model of the site or equivelent specification model of any ISI marked complete for site requirements including taking down defective item complete all as directed by Engineer-in-charge.
Comprehensive Maintenance of MS Motorised Sliding gate daily cleaning checking and carry out necessary maint as per site requirements for motor, gear box, top guider of gate guide roller assembly, drive system, compressing motor open box, rack pinion, manual over side mechanism base plate, control system /panel with actuator ,safety system control panel complete all as directed by Engineer-in-charge. Location - Main Gate -02 Nos, A3MTDC - 02 Nos, RADL -02 Nos and MT -01 No.
Comprehensive Maintenance of MS Motorised rolling shutter daily cleaning checking and carry out necessary maint as per site requirements for motor, gear box, top guider of gate guide roller assembly, drive system, compressing motor open box, rack pinion, manual over side mechanism base plate, control system /panel with actuator ,safety system control panel complete all as directed by Engineer-in-charge. Location - APFNM -02 No, QRAD - 02 No, Note for Sl item No. 53 to 54 : The quoted cost for Comprehensive maint includes all spares and repairs, rewinding works as applicable for proper functioning of gates during entire currency period of contract.
Taking down unserviceable DCP type portable fire extinguiser 6 kg ISI marked from the existing locations along with existing arrangements, Supply and fixing new DCP 6 Kg fire extinguisher with clamp,nut and bolt etc for ABC class of fire in and including poper fixing in the installtions complete all as directed by Engineer-in-charge.
Taking down unserviceable DCP type portable fire extinguiser 4 kg ISI marked from the existing locations along with existing arrangements, Supply and fixing new DCP 4 Kg fire extinguisher with clamp,nut and bolt etc for ABC class of fire in and including poper fixing in the installtions complete all as directed by Engineer-in-charge. Make for Sl item No. 55 to 56 - Safety Plus/Ceasefire/Safex
Pacific Enterprises
C R R CONSTRUCTIONS
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .