Tender Value
₹14.9 L
EMD Value
₹16,000
Closing Date
24 Mar 2023, 12:00 pmClosed
Superintending Engineer
Superintending Engineer, E.W.C., 177, Alenganj, Prayagraj
Supply and Erection for Increasing Capacity of 33/ 11 KV S/S (8 Plus 8 to 8 Plus 10 mva) Sikandara, Distt.Prayagraj under Business Plan 2023-24 on Semi Turnkey Basis
2023_PVVNV_786226_1
15/EWCP/2022-23
Open Tender
Electrical Works
Turn-key
365 days
Prayagraj
Supply and Erection for Increasing Capacity of 33/ 11 KV S/S (8 Plus 8 to 8 Plus 10 mva) Sikandara, Distt.Prayagraj under Business Plan 2023-24 on Semi Turnkey Basis
2 documents required · 2 mandatory
₹1,180
Account Number 914020010003107
₹16,000
Yes
29 Mar 2023
18 Mar 2023
24 Mar 2023
18 Mar 2023
24 Mar 2023
18 Mar 2023
SUPPLY & ERECTION OF MATERIAL
Erection of complete structure for 33 KV lightening arrestor in switch yard. as per RESPO drawing. Work includes Erection of 3 Nos.33 KV Lightening arrestor, its fitting and mounting with care. Grouting of structure with L.C, of 1:3:6 construction of plinth size 0.90x0.45x 0.45 cum. plastering the plinth with cement mortar with cement and sand in ratio 1:4. Works includes cost of clamp concrete material, labour T&P and cement, which shall be provided by the contractor.
Erection of complete 33 KV VCB with structure in switchyard and grouting of VCB Structures. C.T. Structure by cement, sand, brick ballast mortar in ratio 1:3:4. Work includes complete fitting of VCB and C.T. on structure carefully with making all connections of control cable for operating the VCB and C.T. Only VCB, C.T., Battery and battery chargar and their structure shall be provided by the department. All other item like cement, concrete material, T&P shall be provided by the contractor. Work also includes installation and commissioning of Battery and Battery charger.
Installation of 33 KV transformer control pannel in the switchgear room and grouting the pannel by rag bolt using cement, sand mortar in ratio 1:3. Work includs fitting of all accessories in all respect with complete connection of control cable with pannel.Grouting material will be provided by the Contractor.
Erection of complete structure for 33 KV post Insulators in Switch yard. Work includes Installation of 3 Nos. 33 KV Post Insulator on each structure complete as per schedule, grouting of Structure with Ist class brick ballast in the ratio of 1:3:6, plastering in the ratio of 1:3 on plinth size 0.90x0.45x0.45 Cum. The work is to be done strictly as per RESPO drawing. All the material like post Insulator cap, Cement, concrete material used for above work will be provided by the Contractor.
Repairing of Existing T/F plinth size 4.46 x 3.46 x 1.0 Mtr.
Dismantling of Switchyard fencing for safe shifting of old 8/10 MVA power T/Fs
Safe Shifting & dragging of old 8 MVA T/F from inside to out side of Switch Yard after detaching its accessories i.e. Radiator, conservator etc and empting the T/F i.e taking out the T/F oil and disconnecting all 33 KV and 11 KV connections as well as dismantling of 11 KV cable stand and neutral stand. All tools & T&P shall be provided by the contractor.
Safe shifting and dragging of 10 MVA Power Transformer from outside of Switch Yard to inside of Switch Yard taking precautions to avoid damage of bushings of Transformer and other accessories. All tools, T&P etc shall be provided by the contractor.
Erection of 10 MVA Power Transformers on plinth, fixing of all accessories like radiator, conservator tank etc. complete and filling of T/F oil in Transformer complete in all respect.
Special earthing of neutral and body of 10MVA T/F with the help of 3 Nos.G.I. pipe 40 M.M. dia. length 20 feet. G.I. pipe for making of delta, and 2 nos for body earthing complete in all respect and connected with 50x6 m.m GI Strip. G.I. Pipe, G.I. Strip etc. required for completion of work in all respect shall be provided by the Contractor.
Earthing of 11 KV indoor equipments, switch gears as per RESPO Drawing. with G.I. Strip of Size 50x6 mm, provided by which will be the contractor.
Earthing of 33 KV C.T. Structure complete as per schedule with 50x6 mm.G.I. Strip. All earthing material shall be provided by the contractor.
Special earthing of lightening arrestor structure with 6 Nos. additional 40 mm dia 2.5 Mtr. Long G.I. pipe electrodes/rod by digging 3 Mtr. deep pits and connecting it with L.A. through G.I. Strip 35x6 mm welded at both ends. All the material Like G.I. pipe, G.I. strip shall be provided by the contractor.
painting of All structure and equipment inside the switch yard with two coats of red oxide primer and thereafter two coats of aluminium paint, giving silver white finish, painting is to be done after proper cleaning of the structures. paint, primer, thinner etc. required shall be provided by the contractor himself.
Installation of 11 KV VCB in the switch gear room, by grouting base channel 100 x 50 x 6 x 1000mm. Fixing of 11 KV switchgears rag bolt, mounting of P.T. on incoming.
11 KV In coming
Laying of 11 KV 3 x 70/120/185/300 Sqmm. XLPE power cable by digging 0.75 Mtr. deep trench, putting layer of sand in the bottom, ramming it, laying of cable over it RMT and covering the cable from sides and top by laying bricks, finally covering the same by earth and levelling of the same, all the materials, except cable, will be provided by the contractor. Rates may be quoted per RMT
Construction of cable trenchs for L.T. cable for station T/F in the switchyard as per direction of engineer. trenchs to be 12” wide and 9” deep. work includes digging, of trench, concreting of the foundation in the ratio 1:3:6 R.B. wall 9” wide with cement mortar 1:4 and plastering inside the trench in the ratio 1:3 and sand filling in the trench. All material will be provided by the contractor.
Cartage of materials from store center Naini to site, like all Sub station structure, 11 KV Switch gears, Earth mat material, poles, station T/F, All Equipment (TPMO, LA, Fuse set, C.T, P.T. Isolators, VCB, Conductor, Cable, etc.)
Termination of cable boxes of size 11 KV 3 x 300 Sqmm. Joniting Kits
Indoor
Outdoor
Laying of following copper control cable form C.T. T/F to transformer control pannel/protection Board. All control cable shall be supplied by the contractor.
Installation of 24 volt Battery & Battery Charger shall be provided by the contractor
Following items shall also be provided by the contractor at the Sub-station.
Hand Gloves
Rubber Matting
J.L. Enterprises
Om Engineering Enterprises
Urmila Associates
PRANIKA ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .