| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.4 LAccepted-AOC | L1 | Accepted-AOC AOC | |
| 2 | L2₹9.8 L+₹46,048 (4.90%)Rejected-Finance | L2 | Rejected-Finance Highest Value |
| Sl No | Description | Qty | Unit | KRISHNAMOORTHY SUBRAMANIAN L1 | ARIKRISHNAN L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all classes of
soils such as hard stiff clay, stiff black
cotton, hard red earth, shales, murram,
ordinary earth, earth mix with 50% fair
sized boulders etc., with initial lead and
lifts including laying, spreading,
leveling, sectioning breaking clods etc.,
including all incidental charges etc.,
complete as per standard specification .
for Foundations SS 20B TNDSS NO. 23
&24 V, VI (S2) VI 9 | 195 | 1CM (One Cubic Meter) | 170 ₹33,150 Lowest | 170 ₹33,150 Lowest |
| 2.00 | Plain Cement concrete of mix 1:4:8
(One cement four sand and eight
aggregates) using 40mm gauge hard
broken including cost conveyance of all
materials to site including labour
charges, transporting and placing in
position including shoring, strutting
forming protective bunds, cofferdams
bailing out of water labour for mixing
compacting, finishing and curing,
working at depths, tools and plants and
incidental charges such as sheeting,
shoring and bracing and their
subsequent removal etc., complete as
per standard specification.
TNDSS NO.28 V,VI S25 | 30 | 1CM (One Cubic Meter) | 5,259 ₹1,57,770 Lowest | 5,259 ₹1,57,770 Lowest |
| 3.00Supplying & Erecting of steel centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle and supported by casurina props of 10 - 13cm dia. spaced @ 75cm c/c etc., complete complying with standard specifications ..(RCC floor slab, roof slab, Rectangular/ square, Tee/ Ell beams, Lintels, staircase waist slabs, Landing slabs, Landing beam, Portico beam etc., ). TNDSS NO.86 K, 86 A | |||||
| 4.00Without strutting | |||||
| 5.00 | S.W.Drain | 702 | 1SQM (One Meter Square) | 288 ₹2,02,176 Lowest | 320 ₹2,24,640 |
| 6.00 | Plain Cement Concrete 1:3:6 Mix (one
part cement, three part sand and six part
of aggrigate) using 20 mm size ISS
HBG metal from approved quarry
including cost and conveyance of all
materials to site. Loading and unloading
charges and labour charges for mixing.
Laying and curing etc., complete as per
TNDSS NO: 28 & VI (S2) VI (S5A) VII
standard specifications as directed by
Engineer incharge. | 88 | 1SQm (One Cubic Meter ) | 6,032 ₹5,30,816 Lowest | 6,300 ₹5,54,400 |
| 7.00 | Finishing the top of flooring with
granothatic flooring with cement
concrete 1:2:4 (one cement, two sand
and four aggrigate) using 10 to 12mm
stone chips – 25mm tk etc., Complete. | 88 | 1 CM (One Cubic Meter) | 170 ₹14,960 Lowest | 170 ₹14,960 Lowest |
Tender Value
Refer Docs
EMD Value
₹11,500
Closing Date
5 Feb 2024, 3:00 pmClosed
Executive Officer
17,patti Street, srimushnam, Srimushnam (TK) Cuddalore (DT)
Construction of Storm water drain at Sedar Street and in Srimushnam Town Panchayat
2024_DTP_415314_1
2024/05/A1
Open Tender
Civil Works
Works
60 days
Srimushnam Town panchayat
Construction of Storm water drain at Sedar Street and in Srimushnam Town
Panchayat
2 documents required · 2 mandatory
₹0
₹11,500
Yes
27 Oct 2025
30 Jan 2024
5 Feb 2024
30 Jan 2024
5 Feb 2024
30 Jan 2024
30 Jan 2024 - 5 Feb 2024
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .