Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.3 CrAccepted-Finance | ₹28.3 Cr | L1 | Accepted-Finance Lowest rate found. |
| 2 | L2₹30.4 Cr+₹2.1 Cr (7.35%)Accepted-Finance | ₹30.4 Cr+₹2.1 Cr (7.35%) | L2 | Accepted-Finance High rate found. |
| 3 | L3₹33.8 Cr+₹5.5 Cr (19.3%)Accepted-Finance | ₹33.8 Cr+₹5.5 Cr (19.3%) | L3 | Accepted-Finance High rate found. |
Tender Value
Refer Docs
Closing Date
15 Mar 2021, 2:00 pmClosed
The Exe., Engg., PWD, WD-I, Daman.
The Multi Office Complex, 2nd Floor, Near Moti Daman Market, Moti Daman.
Widening and Strengthening of NH848B Ch. 8 to 180 to 11 plus 960 and Ch. 14 plus 100 to 20 plus 230 at Daman. Engineering, Procurement and Construction (EPC Mode).
2021_MoRTH_612489_1
Tender Notice No.97/2020-21 (NH848B)
Open Tender
Civil Works
Works
365 days
Daman District.
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
Bharatkosh portal
Exempted
The Exe., Engg., PWD, WD-I, Daman.
26 Mar 2021
28 Jan 2021
17 Mar 2021
28 Jan 2021
15 Mar 2021
28 Jan 2021
19 Feb 2021
Amount
Civil work
I/ We hereby submit our BID and offer a BID PriceRs.......................................... (Rs...................................... in words) for undertaking the aforesaid Project in accordance with the Bidding Documents and the Agreement for the work of Widening & Strengthening of NH848B Ch. 8+180 to 11+960 & Ch. 14+100 to 20+230 at Daman. {Engineering, Procurement & Construction (EPC) Mode}
m/s j m shah
RKC INFRABUILT PRIVATE LIMITED
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .