| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.4 LAccepted-Finance JAMMU | JAMMU | JAMMU AND KASHMIR | 180001 | ₹2.4 L | 1 | Accepted-Finance Found Eligible |
| 2 | 2₹2.5 LAccepted-Finance 111 MINI SHOPPING COMPLEX NEAR HOTEL ASIA NEHRU MARKET JAMMU JAMMU KASHMIR 180004 UDYAM JK 07 0001057 | JAMMU | JAMMU AND KASHMIR | 180004 | ₹2.5 L | 2 | Accepted-Finance Found Eligible |
| 3 | 3₹2.5 LAccepted-Finance | ₹2.5 L | 3 | Accepted-Finance Found Eligible |
| Sl No | Description | Qty | Unit | Vaibhav Engineers and Technocrates L1 | MUSKAN ELECTRICAL L3 | AADISHWAR ELECTRICAL AND MECHANICAL WORKS L2 |
|---|---|---|---|---|---|---|
| 1.00 | 1. Dismounting of 485 kW, 650 HP BHEL Make HT motor from its place of installation by way of disengaging all its three phase cable connections of rotor, stator, commutator assembly, trifurcated sealing box, etc. Opening & disengaging coupling set (Motor half coupling & Pump-half coupling) of Unit No.06, separating motor from motor skirt by opening all its nuts & bolts and placing motor on steel fabricated stool properly. Complete job.01Job
2. Extraction of whole pumping unit from its respective pit by way of dismantling, opening all internal and external 500 mm dia. x 200 mm dia. x 70 mm dia. lengths of column assembly components in sequence along with connected fittings such as muff coupling, C.I. Guide spiders, top shaft, stuffing box, C.I. Bell mouth, enlarger, strainer and bowl assembly lubrication system of column assembly one by one and stacking of each at pump house after checking and segregating of damaged defective parts of each. Complete job. 01 Job
3. Transportation charges for shifting of worn-out items from LIS Ranjan to workshop and back shifting to site of installation after strengthening / reconditioning involving manual loading, mechanical transportation and handling charges. Complete job. 01 job
4. Fabrication of heavy duty ERW flanged end shaft enclosing tube of 200 mm. dia. x 2000mm long, 6/8 mm. thickness, having flanges on either side (welded on inside of the pipe) with drilled and threaded 6 nos. holes to suit M20 x 50mm bolts.01 job
5. Repair/reconditioning of AISI-410-SS muff coupling along with its top & bottom nuts by way of rebuilding at old worn-out portions with re-metalling with special SS welding electrodes, then turning, finishing to true required size and rethreading both the nuts and required portion of the coupling, finishing of all the surfaces of nuts and muff coupling for proper fitment along with rebuilding of key ways. Complete job. 04 jobs
6. Repairing of Guide spider by way of replacement of rubber bearings, nitrile rubber pads for arms, CS head screws M12 x 20mm, MS cover dia. 130mm with drilled 4 nos. holes for rubber bearing locking and locking screws M10 mm.03 jobs
7. Reconditioning of 200 mm dia. x 2000mm length, ERW shaft enclosing tube by cutting, removing from both ends of 200 mm dia. shaft enclosing flanges and fitting of new flanges similar size as specification to each end of the tube which should have six nos. of M20 dia. size threads, MS welding to both ends of the flanges with main tube and then turning, facing both the ends in respect of all over accurate thickness, straightening and alignment, facing of the flanges. Complete job 03 jobs
8. Strengthening/Reconditioning of column assembly components by Fabrication of C.I. guide spider set with three legs complete comprising of one no. guide spider suitable for line shaft of size 70mm dia. three no.’s rubber pads and slotted CS M12 x 20mm screw, one no. rubber bearing, one no. cover for rubber bearing and bearing screws and washers. 03 jobs
9. Reconditioning of SS AISI-410-line shaft 70 mm dia. 2.15 mtrs. long at worn out portions by way of rebuilding the worn out, undersize portions by remetalling with special SS welding electrodes in layers and then turning, grinding, polishing, finishing to true size and specifications including rebuilding, finishing of key ways to true size. Also removing & checking eccentricity of line shaft with dial gauge at various off sets. Removing deflection/eccentricity by heat treatment or on hydraulic press, removing of deflections on heads/ ends and then again checking the alignment of the shaft on lathe machine. P/F of new fabricated AISI-410-SS cotter pins of line shaft. (The material used for the SS shaft will be provided by the department presently lying at the sub-divisional store along with muff couplings).02jobs
10. Assembling of each column one by one with 70 mm shaft, 200mm internal tube and 500mm external pipe in sequence while lowering in the respective pit along with assembled bowl assembly. This includes fitting, lowering of line shafts, guide spiders, muff couplings, top shaft, tension tube, deflector tube, joining of discharge surging head with delivery line 500 mm dia. along with providing and fitting of relevant joining material, fire fly sheet, graphite packing, grease packing, 19 mm size nuts, bolts, washers, fitting and tightening after complete alignment, leveling etc. Complete job01 job
11. Testing of pumping unit which includes installation of 485 KW, 650 HP, 6.6 KV VT motor solid shaft BHEL make HT motor on the skirt and its alignment with respective pump half coupling, reconnection of dismantled cable connections of 6.6 KV, 3 phase to rotor, stator, slipring assembly, liquid rotor starter trifurcated sealing box and space heater, cleaning of all carbon brushes, connecting of motor half coupling with pump half coupling, checking all connections with proper alignments and adjustment and testing of pumping unit for its proper operation 01 job | 1 | Job | 4,883.5 ₹2.4 L | 2,461.5 ₹2.4 L | 3,677.25 ₹2.4 L |
Tender Value
₹2.5 L
EMD Value
₹4,952
Closing Date
16 Feb 2026, 2:00 pmClosed
Executive Engineer MID Akhnoor/Nowshera
Office of Executive Engineer MID Akhnoor/Nowshera
Repair / Reconditioning / fabrication of worn-out column assembly components of 20 cusec Jyoti make (3stage) 700T1 A6, 20 cusecs discharge VT pump no. 06 installed at LIS Ranjan
2026_IFC_302571_1
MID/AN/103
Open Tender
Machineries/ Mechanical Engg Items
10 days
Ranjan
Please refer Tender documents.
7 documents required · 7 mandatory
₹200
Executive Engineer MID Akhnoor/Nowshera
₹4,952
Yes
Office of Executive Engineer MID Akhnoor/Nowshera
19 Feb 2026
7 Feb 2026
17 Feb 2026
7 Feb 2026
16 Feb 2026
10 Feb 2026
9 Feb 2026
1. Dismounting of 485 kW, 650 HP BHEL Make HT motor from its place of installation by way of disengaging all its three phase cable connections of rotor, stator, commutator assembly, trifurcated sealing box, etc. Opening & disengaging coupling set (Motor half coupling & Pump-half coupling) of Unit No.06, separating motor from motor skirt by opening all its nuts & bolts and placing motor on steel fabricated stool properly. Complete job.01Job 2. Extraction of whole pumping unit from its respective pit by way of dismantling, opening all internal and external 500 mm dia. x 200 mm dia. x 70 mm dia. lengths of column assembly components in sequence along with connected fittings such as muff coupling, C.I. Guide spiders, top shaft, stuffing box, C.I. Bell mouth, enlarger, strainer and bowl assembly lubrication system of column assembly one by one and stacking of each at pump house after checking and segregating of damaged defective parts of each. Complete job. 01 Job 3. Transportation charges for shifting of worn-out items from LIS Ranjan to workshop and back shifting to site of installation after strengthening / reconditioning involving manual loading, mechanical transportation and handling charges. Complete job. 01 job 4. Fabrication of heavy duty ERW flanged end shaft enclosing tube of 200 mm. dia. x 2000mm long, 6/8 mm. thickness, having flanges on either side (welded on inside of the pipe) with drilled and threaded 6 nos. holes to suit M20 x 50mm bolts.01 job 5. Repair/reconditioning of AISI-410-SS muff coupling along with its top & bottom nuts by way of rebuilding at old worn-out portions with re-metalling with special SS welding electrodes, then turning, finishing to true required size and rethreading both the nuts and required portion of the coupling, finishing of all the surfaces of nuts and muff coupling for proper fitment along with rebuilding of key ways. Complete job. 04 jobs 6. Repairing of Guide spider by way of replacement of rubber bearings, nitrile rubber pads for arms, CS head screws M12 x 20mm, MS cover dia. 130mm with drilled 4 nos. holes for rubber bearing locking and locking screws M10 mm.03 jobs 7. Reconditioning of 200 mm dia. x 2000mm length, ERW shaft enclosing tube by cutting, removing from both ends of 200 mm dia. shaft enclosing flanges and fitting of new flanges similar size as specification to each end of the tube which should have six nos. of M20 dia. size threads, MS welding to both ends of the flanges with main tube and then turning, facing both the ends in respect of all over accurate thickness, straightening and alignment, facing of the flanges. Complete job 03 jobs 8. Strengthening/Reconditioning of column assembly components by Fabrication of C.I. guide spider set with three legs complete comprising of one no. guide spider suitable for line shaft of size 70mm dia. three no.’s rubber pads and slotted CS M12 x 20mm screw, one no. rubber bearing, one no. cover for rubber bearing and bearing screws and washers. 03 jobs 9. Reconditioning of SS AISI-410-line shaft 70 mm dia. 2.15 mtrs. long at worn out portions by way of rebuilding the worn out, undersize portions by remetalling with special SS welding electrodes in layers and then turning, grinding, polishing, finishing to true size and specifications including rebuilding, finishing of key ways to true size. Also removing & checking eccentricity of line shaft with dial gauge at various off sets. Removing deflection/eccentricity by heat treatment or on hydraulic press, removing of deflections on heads/ ends and then again checking the alignment of the shaft on lathe machine. P/F of new fabricated AISI-410-SS cotter pins of line shaft. (The material used for the SS shaft will be provided by the department presently lying at the sub-divisional store along with muff couplings).02jobs 10. Assembling of each column one by one with 70 mm shaft, 200mm internal tube and 500mm external pipe in sequence while lowering in the respective pit along with assembled bowl assembly. This includes fitting, lowering of line shafts, guide spiders, muff couplings, top shaft, tension tube, deflector tube, joining of discharge surging head with delivery line 500 mm dia. along with providing and fitting of relevant joining material, fire fly sheet, graphite packing, grease packing, 19 mm size nuts, bolts, washers, fitting and tightening after complete alignment, leveling etc. Complete job01 job 11. Testing of pumping unit which includes installation of 485 KW, 650 HP, 6.6 KV VT motor solid shaft BHEL make HT motor on the skirt and its alignment with respective pump half coupling, reconnection of dismantled cable connections of 6.6 KV, 3 phase to rotor, stator, slipring assembly, liquid rotor starter trifurcated sealing box and space heater, cleaning of all carbon brushes, connecting of motor half coupling with pump half coupling, checking all connections with proper alignments and adjustment and testing of pumping unit for its proper operation 01 job
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
BOQ_981987.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid