Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.1 LAdmitted-Fee/PreQual/Technical/Finance | -31.99% | ₹1.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.2 L+₹13,073.33 (12.1%)Admitted-Fee/PreQual/Technical/Finance R O BAGHJOGI LANKER RAINAWARI SRINAGAR | SRINAGAR | JAMMU AND KASHMIR | 190001 | -23.79% | ₹1.2 L+₹13,073.33 (12.1%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹1.2 L+₹14,811.34 (13.7%)Admitted-Fee/PreQual/Technical/Finance | -22.70% | ₹1.2 L+₹14,811.34 (13.7%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹1.2 L+₹16,088.54 (14.8%)Admitted-Fee/PreQual/Technical/Finance | -21.90% | ₹1.2 L+₹16,088.54 (14.8%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹1.3 L+₹16,724.74 (15.4%)Admitted-Fee/PreQual/Technical/Finance | -21.50% | ₹1.3 L+₹16,724.74 (15.4%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.6 L
EMD Value
₹3,180
Closing Date
21 Jul 2026, 6:00 pmClosed
Executive Engineer RRWD SMC
Executive Engineer RIGHT RIVER WORKS DIVISION SMC REGAL LANE LAL CHOWK
Construction of Lane from House of Nazir Ahmad Lone to Abdul Aziz Lone at Tengpora, Zoonimar
2026_HAUDD_315318_32
SHORT Term NOTICE INVITING ETENDER No. 10 of 2026-2027 Dated 09.07.2026 RRWD SMC
Open Tender
Civil Works
Percentage
30 days
Lone at Tengpora, Zoonimar
PLEASE REFER TO TENDER DOCUMENT
2 documents required · 2 mandatory
₹201
FA/CAO AC NO 0216010200000007
₹3,180
26 Jul 2026
10 Jul 2026
22 Jul 2026
10 Jul 2026
21 Jul 2026
10 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Engagement of Labourers for site clearance | 3 | No. | 553 | ₹1,659 |
| - | Supplying and laying of Stone Soling hand packed with horizontal level including all carriages complete | 9.25 | Cum | 850 | ₹7,862.5 |
| - | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 Cement: 4 fine sand: 8 grade stone aggregate 40mm nominal size). | 7 | Cum | 5,202.9 | ₹36,420.3 |
| - | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 8.13 | Cum | 7,104.35 | ₹57,758.37 |
| - | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level: Thermo-Mechanically Treated bars of grade Fe-500D or more | 395 | Kgs | 123.2 | ₹48,664 |
| - | Carriage of material by mechanical Transport.
Sand/Aggregates | 20.57 | Cum | 344.49 | ₹7,086.16 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
BOQ_1022624.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .