| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.6 LAccepted-AOC | L1 | Accepted-AOC Letter of Acceptance to L1 Tenderer | |
| 2 | L2₹36.3 L+₹64,836.64 (1.82%)Rejected-AOC | L2 | Rejected-AOC Rejected tenderer due to highest amount quoted |
| Sl No | Description | Qty | Unit | P.SIVAKUMAR L1 | M/S.KCP CONSTRUCTIONS L2 |
|---|---|---|---|---|---|
| 1.00Construction of OHT(100000 Litre) Chunambedu Colony at Chunambedu Panchayat in Chithamur Block Under SFC(Dt Pt- General Fund) for the year 2025-26 | |||||
| 2.00 | Earth work excavation for foundation and depositing on bank within an initial lead of 10m and an initial lift of 2m for the following classification of soil including shoring, strutting, bailing out water wherever necessary and all other incidental charges and as directed by the Officers. First depth of 0 to 2m | 134.46 | Cum | 260 ₹34,959.6 Lowest | 275 ₹36,976.5 |
| 3.00 | Cement concrete 1:4:8 (One cement, four sand and eight course aggregate of 40mm size hard blue granite broken stone) for levelling course including the cost of mixing, placing the concrete in position, consolidating finishing the ends complete and curing etc. complete and as directed by TWAD Board Officers for works beyond 1.50m from GL for footing. | 8.24 | Cum | 5,454 ₹44,940.96 Lowest | 5,454 ₹44,940.96 Lowest |
| 4.00 | R.C.C. 1:1.5:2(M30) (one cement one and half sand and two 20mm &10mm HBG stone) for Floor slab floor beam &side wall excluding the cost of reinforcement, centering and shuttering but including the cost of mixing, placing, vibrating of concrete curing and finishing etc., complete as directed by the officers Column footing below 1.50 m from GL | 23.74 | Cum | 9,355 ₹2,22,087.7 Lowest | 9,355 ₹2,22,087.7 Lowest |
| 5.00 | Column below GL upto 1.50 m | 1.19 | Cum | 9,355 ₹11,132.45 Lowest | 9,355 ₹11,132.45 Lowest |
| 6.00 | Column above GL upto 4.50 m | 4.56 | Cum | 9,495 ₹43,297.2 Lowest | 9,495 ₹43,297.2 Lowest |
| 7.00 | Column above 4.50 m upto 7.32 m | 2.89 | Cum | 9,495 ₹27,440.55 Lowest | 9,495 ₹27,440.55 Lowest |
| 8.00 | Column above 7.32 m upto 10.98m | 3.72 | Cum | 9,495 ₹35,321.4 Lowest | 9,495 ₹35,321.4 Lowest |
| 9.00 | Column above 10.98 m upto 11.55m | 0.13 | Cum | 9,495 ₹1,234.35 Lowest | 9,495 ₹1,234.35 Lowest |
| 10.00 | Braces at GL | 3.37 | Cum | 9,495 ₹31,998.15 Lowest | 9,495 ₹31,998.15 Lowest |
Tender Value
₹36 L
EMD Value
₹36,000
Closing Date
17 Oct 2025, 3:00 pmClosed
Block Development Officer(BP), Chithamur Block
Block Development office Chithamur Block
Construction of OHT(100000 Litre) at Chunambedu Colony in Chunambedu Panchayat in Chithamur Block Under SFC(Dt Pt- General Fund) for the year 2025-26
2025_RDTN_613302_1
Rc.No.181/2025/Cpt A2 Dated 07.10.2025
Open Tender
Civil Works - Water Works
Item Rate
90 days
Chunambedu colony
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹36,000
Yes
6 Dec 2025
11 Oct 2025
17 Oct 2025
11 Oct 2025
17 Oct 2025
11 Oct 2025
Amount
Construction of OHT(100000 Litre) Chunambedu Colony at Chunambedu Panchayat in Chithamur Block Under SFC(Dt Pt- General Fund) for the year 2025-26
Earth work excavation for foundation and depositing on bank within an initial lead of 10m and an initial lift of 2m for the following classification of soil including shoring, strutting, bailing out water wherever necessary and all other incidental charges and as directed by the Officers. First depth of 0 to 2m
Cement concrete 1:4:8 (One cement, four sand and eight course aggregate of 40mm size hard blue granite broken stone) for levelling course including the cost of mixing, placing the concrete in position, consolidating finishing the ends complete and curing etc. complete and as directed by TWAD Board Officers for works beyond 1.50m from GL for footing.
R.C.C. 1:1.5:2(M30) (one cement one and half sand and two 20mm &10mm HBG stone) for Floor slab floor beam &side wall excluding the cost of reinforcement, centering and shuttering but including the cost of mixing, placing, vibrating of concrete curing and finishing etc., complete as directed by the officers Column footing below 1.50 m from GL
Column below GL upto 1.50 m
Column above GL upto 4.50 m
Column above 4.50 m upto 7.32 m
Column above 7.32 m upto 10.98m
Column above 10.98 m upto 11.55m
Braces at GL
Braces at 3.35m to 3.75m above GL
Braces at 7.10m t0 7.32m above GL
Braces at 7.32m t0 7.50m above GL
Braces at 10.85m t0 10.98m above GL
Braces at 10.98m t0 11.55m above GL
Central Column inside the tank from 11.80m to 14.75m above G.L.
Centering for soffits of RCC members or plane surfaces including shuttering, strutting to centering and providing supports etc complete for the following members using MS sheets of size 90 cm x 60 cm BG 10 gauge stiffened with welded M.S. angles of size 25x25x3mm laid over silver oak (country wood) joist of size 10x6.5 cm (spaced @ about 90 cm c/c) and supported by casurina props of 10 to 13 cm dia (spaced at 75 cm c/c) and as directed by Officers. Square Column Column below GL 0 to 1.50m
Colum above 3.30m to 4.3 ht from GL
Column above 4.30 m upto 5.30 m
Column above 5.30 m upto 6.30 m
Column above 6.30 m upto 7.30 m
Column above 7.30 m upto 8.30 m
Column above 8.30 m upto 9.30 m
Column above 9.30 m upto 10.30 m
Deduct for Floor Beam at 10.85m to 11.55m height
Column above 11.30 m upto 11.55 m
Central circular column: Column below GL 0 to 1.50m
Column above 3.30m to 4.3 ht from GL
Column above 4.30 m upto 5.30 m
Column above 5.30 m upto 6.30 m
Column above 6.30 m upto 7.30 m
Deduct for brace at 7.10m to 7.50m height
Colum above 7.30m to 8.3 ht from GL
Column above 8.30 m upto 9.30 m
Column above 9.30 m upto 10.30 m
Column above 10.30 m upto 10.85 m
Plain Surface: Ground level Brace
Brace at 3.35m-3.75m m above G.L.
Brace at 7.10m-7.50m m above G.L.
Floor Beam at 10.85m-11.55m m above G.L.
Floor slab and working platform at 11.55 m above G.L.
Roof slab at 2.95 m above floor slab
Braces at 7.10m t0 7.32m above GL: Upto 3.30m height above and below GL
Supplying, fabricating and placing in position of RTS rods for reinforcement for various members including cost of steel for all RCC works as directed byOfficers. The rate to include the cost of binding wire also.
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Supply,delivery and fixing of pipes for OHT connections including civil works (vide separate estimate)
Providing and fixing of RCC 1:2:4 mix spiral stair-case of approved design outside of the tank as generally shown in plan including cost of cement, shuttering, strutting, moulding, lifting, casting of steps and any other incidental charges and painting etc. complete.
Supply, delivery and fixing in position of CI man hole cover and frame of size 60 x 60 cm on roof slab and as directed by the Officers. The manhole frame and cover should be of light duty and conforming to IS 1726/1974.
Providing Hand rails over the Roof slab by using 32 mm GI Pipe with 40mm x 6mm MS Flat and fixied with 12mm dia Fastner Bolt 75mm long and as directed by TWAD Bd officers
Providing Hand rails over the Standing Platform by using 32 mm GI Pipe with 40mm x 6mm MS Flat and fixied with 12mm dia Fastner Bolt 75mm long and as directed by TWAD Bd officers
RCC 1:1.5:3(One cement one and half sand and three 20 mm size HBG stone) for the RCC inside ladder including the cost of reinforcement fabrication centering and shuttering, cost of mixing placing of concrete vibrating curing, finishing etc., complete including fixing of RCC Ladder etc., complete as directed by the officers.
SuB Estimate: Pipe Line
Earth work excavation in all types of soil lead And lift ss 20 B etc complete Including All Labour Charges Including Cost and Conveyance etc Complete. .
Supply and Following of 90mm dia PVC Pipe Including Cost and Conveyance etc Complete. 4 KSC
Supply and Fixing of PVC Pipe Including Cost and Conveyance etc Complete.
Refilling excavated earth Including All Labour Charges Including Cost and Conveyance etc Complete. .
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
M/S.KCP CONSTRUCTIONS (BID ID -1486444)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .