Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance NO 26 ANGELS COMPLEX TVS TOLGATE TIRUCHIRAPALLI TAMIL NADU 620 020 | TIRUCHIRAPALLI | TIRUCHIRAPALLI | TAMIL NADU | 620020 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Rejected-Technical NO 1 120 FIRST STREET SANIPOONDI VILLAGE TIRUVANNAMALAI TALUK DISTRICT TAMIL NADU 606 755 | TIRUVANNAMALAI | TIRUVANNAMALAI | TAMIL NADU | 606755 | Rejected-Technical All as per tender conditions |
| 5 | Rejected-Technical NA | NA | NA | 121004 | Rejected-Technical All as per tender conditions |
Tender Value
₹80.4 L
EMD Value
₹1.6 L
Closing Date
27 Apr 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
chief engineer
chennai port trust centenary building
TENDER FOR FACE LIFTING OF CENTENARY BUILDING AT CHENNAI PORT AUTHORITY IN EX(C)CD-II DIVISION
2022_ChPT_682529_1
T/WMA3/23 /2022/E
Open Tender
Civil Works
Works
240 days
chennai port trust centenary building
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹1.6 L
Yes
22 Jun 2022
7 Apr 2022
28 Apr 2022
7 Apr 2022
27 Apr 2022
21 Apr 2022
120 days
1.Dismantling the exterior wall tiles dadoing with base mortar of all floors to the required thickness to receive without damaging the structures nearby, including collecting and stacking the debris within a lead of 50m for disposal all as directed at site of work including all labour, tools, equipments, safety belts, helmet, safety shoes, etc., complete.
2.Dismantling and removing the existing damaged RCC fins slab of all floors at centenary building (45m approx) the existing structure nearby and collecting, stacking the debris within a lead of 50m for disposal including all accessories, conveying and handing over the serviceable materials if any, to the departmental stores / RSD yard within a lead of 3 km all as directed at site of work including costs of all labour, tools, fuel, equipments, safety belts, helmet, safety shoes, etc., complete.
3.Chipping thoroughly the existing damaged RCC fins plastering to a required thick of all floors at centenary building (45m approx) the existing structure nearby and collecting, stacking the debris within a lead of 50m for disposal all as directed at site of work including costs of all labour, tools, fuel, equipments, safety belts, helmet, safety shoes, etc., complete.
4.Chipping thoroughly the existing ceiling plastering to a required thick, of all floors at centenary building (45m approx) not distrubing the existing structure near by and conveying the debris within a lead of 50m all as directed at site of work and wherever necessary required including all labour, tools, transport, material,equipments, safety belts, helmet, safety shoes, etc., complete.
5.Applying Reebaklens RR (Rust Remover) or equivalent of all floors with brush for complete wetting of rusted materials / steel surface and preparing the surface free from all dust particles and loose materials by using wire brush and applying two coat anti corrosive (Nitozinc primer of Fosroc or equivalent) protective coat of approved quality all as per manufacture specification and as directed at site of work. The rate shall include cost of materials, labour, brushes, tools, plant equipment, safety belts, helmet, safety shoes, transport, fuel etc., complete. NOTE: The payment will be made only for actual surface area of reinforcement bars on which protective coating is applied.
6.Applying epoxy resin bonding agent (Nitro bond EPL of Fosroc) or its equivalent of all floors at the top of existing concrete surface using short haired brush and applied on the old concrete surface to receive new finish/concrete/plastering all as per manufacture specification and as directed at site of work. The rate shall include preparing the substrate, mixing the compound, applying, cost of materials, labour, brushes, tools, plant, equipment, transport, safety belts, helmet, safety shoes, fuel etc., complete. NOTE:The new concrete/plastering shall be placed to the coated substrate,when it is in a tacky state.
7.Preparing the surfaces of damaged vertical fins slab & wall portion of all floors in cement mortar 1:3 (1cement : 3 crushed stone sand) 20 mm thick to the required finish curing etc., wherever required all as per relevant specification and as directed at site of work including all labour, materials, curing, cement, tools, equipments, transport, safety belts, helmet, safety shoes, etc., complete.
8.Preparing the surfaces of ceiling plastering in cement mortar 1:3 ( 1 cement :3 crushed stone Sand ) 6 to 10 mm thick to the required finish, curing etc., wherever required all as per relevant specification and as directed including all materials, cement, labours, curing, tools, equipments, transport, safety belts, helmet, safety shoes, etc., complete.
9.Dismantling and Removing the existing damaged PVC pipes 110mm dia / 75mm dia of all floors with all accessories, wherever required without damaging near by structures and handing over the retrieve materials if any to the Departmental stores / RSD yard within a lead of 3kms all as specified and as directed at site of work including all labour, tools, tackles, equipments, transport, safety belts, helmet, safety shoes, fuel etc., complete.
10.Providing and fixing new rain water pipes of all floors with best quality rigid unplastisized PVC rain water pipe of 110mm outer dia and capable of withstanding pressure of 6kg/sqm with necessary special clamps made out of M.S.Flat 20mmx3mm with two coats of anti corrosive paint in masonry/ concrete cutting holes of size 100x100x100mm embedding the clamps in PCC 1:2:4( 1 Cement:2 Crushed stone sand: 4 stone aggregate of 6mm nominal size ) making good the disturbed portion of masonary/ concrete surface all as per specification and or as directed, including all materials, necessary door elbows, door Yee, door Tee, cement, labour, tools, tackles, equipments, transport, safety belts, helmet, safety shoes, fuel etc., complete.
11.Providing and fixing new rain water pipes / AC water line pipe of all floors with best quality rigid unplastisized PVC water pipe of 75mm outer dia and capable of withstanding pressure of 6kg/sqm with necessary special clamps made out of M.S.Flat 20mmx3mm with two coats of anti corrosive paint in masonry/ concrete cutting holes of size 100x100x100mm embedding the clamps in PCC 1:2:4( 1 Cement:2 Crushed stone sand: 4 stone aggregate of 6mm nominal size ) making good the disturbed portion of masonary / concrete surface all as per specification and or as directed, including all materials, necessary door elbows, door Yee, door Tee, cement, labour, tools, tackles, equipments, transport, safety belts, helmet, safety shoes, fuel etc., complete.
12.Providing and fixing the Double steel pipe scaffolding around Centenary Building and wherever required up to 45m height (approx) for carry out the repair / improvement works of dismantling existing damaged ceiling / fins/ rain water pipes and providing new one at required floor level and upto terrace of the Centenary Building while fixing / dismantling without damaging the nearby structures by using M.S. pipes 40 to 50mm dia and of 3mm thk. for vertical horizontal members including bracing and spacing to suit the site condition, including providing longitudinal and transverse middle braces with adequate strength and providing platform with country wood planks/steel beam (40mm thick and 20mm thick) etc., including covering the working area with suitable green safety monofilament net cost of materials, labour, lead and lift, safety measures and dismantling /removing the same after completion of the work all as directed at site of work and to the satisfaction of the site officials, including removing the entire scaffolding materials after completion of the repair works without disturbing the office premises all-round the centenary building during office hours all as directed at site, free from any left over materials including all labour, tools, equipments, safety belts, helmet, safety shoes, etc., complete. Note : 1). Scaffolding will be measured only one time for entire repair / improvements (length x height) 2)75% of the payment may be released after erecting of scaffolding in all respects 3) 25% of the balance payment will be released only after completion of work. scaffolding measurement will be measured only one time for the entire repair/improvement works.
13.Providing and laying cement concrete 1:2:4 mix (1 cement: 2 crushed stone sand: 4 hard granite aggregate 12 mm graded down to 6mm ) as central core 60 mm thick for RCC Fins slab of all floors including providing steel reinforcement of 8 mm tied with 1.25 mm dia black annealed steel binding wire wherever required including providing chicken mesh tied properly over the steel reinforcement and plastering CM 1:3 ( 1 cement : 3 crushed stone sand) 6 to 10 mm thick on either side of drop slab including centering ,shuttering, mixing transporting placing, vibrating, all as per relevant specification and all as directed at site of work, including all materials, cement, labour, curing, tools, equipments, transport, safety belts, helmet, safety shoes, fuel, etc., complete. Note: Payment will be made for steel reinforcement separately under relevant item.
14.Providing and fixing anodized aluminium decorative grills of 6mm nominal thickness with mesh size 50x50mm of approved design of all floors as available in the market to the with aluminium F/U/H channel at in between of RCC fins/wall opening all as directed, including all labour, tools, tackles, equipments, transport, safety ladder, safety belts, helmet, safety shoes, fuel etc., complete.
15.Preparing the surfaces of existing ceiling white washing and applying two coats of plastic emulsion paint and over a one coat of plastic emulsion primer Asian paint or equivalent to give an even shade of basement floors / all floors and (thorough scrapping can be done wherever required) all as directed at site of work including all labour, scaffolding, materials, tools, equipments, brushes, safety ladder, safety belts, helmet, safety shoes, etc.,complete.
16.Preparing the surfaces of internal walls and applying two coats of colour washing using plastic emulsion paint of basement floor and (thorough scrapping can be done wherever required) Asian paint or equivalent to give an even shade all as per relevant specifications and as directed at site of work including all labour, materials, tools, tackles, equipments, brushes, safety belts, helmet, safety shoes, etc., complete.
17.Preparing the existing external wall surfaces of all floors and (thorough scrapping can be done wherever required) applying two coats of weather shield max paint (100% acrylic latex exterior) (ICI Dulux or equivalent brand) over a one coat of weather shield max primer of superior approved quality and shade to give an even shade including all materials, labour, brushes, tools, equipments, safety ladder, safety belts, helmet, safety shoes, etc., complete.
18. Supplying, fabricating and placing in position HYSD (Fe 415/500 grade) TMT steel bars as reinforcement for all RCC Fins slab of all floors wherever required, including handling, cutting, bending and tying with 1.25mm dia black annealed steel binding wire including placing, all as per relevant specification, drawings and as directed including all materials, labour, tools, equipment, safety belts, helmet, safety shoes, transport, fuel, etc., complete. Note:1.The rate shall be inclusive of cost of reinforcement steel, binding wire and fabrication charges etc., complete. Binding wire will not be measured for payment purpose. 2.The contractor will be allowed to use Fe500 Grade TMT steel bar without claiming any extra cost.
19.Preparing and making holes 10mm dia up to a depth of 50mm by using hand drilling machine in the existing RCC surface / masonry and preparing the surface free from all dust particles in the holes and placing 8mm dia TMT bars for vertical fins of all floors to fix FOSROC LOKFIX S etc., all as per relevant specification and all as directed at site of work including all labour, tools, materials, equipments, safety belts, helmet, safety shoes, fuel, etc., complete. Note: Payment will be made for steel reinforcement separately under relevant item.
20. Preparing the water proofing treatment with mesh (DCP or equivalent) at existing surfaces thoroughly to remove all dirt and loose particles at open terrace area, any crack visible on the surface and apply crack fill high performance polymer modified cementitious crack sealer. Applying prime coat of acrylic latex based water proofing adequate cum bonding agent and laying of non-woven fiber glass mesh (only on the flooring surface) of 45 GSM with necessary preparation and applying two coat of elastomeric high performance Acrylic system, premium quality acrylic coating and all as per manufacturer specification and all as directed at site of work including all material, curing, labour, tools, equipments, safety belts, helmet, safety shoes, transport, fuel, etc., complete.
21.Supplying and fixing in position 5mm nominal thick frosted glass of all floors (Saint Gobain or Modiguard) for aluminium ventilators louvered glass and fixing with necessary accessories like channels wherever required, screws etc., and as directed at site of work including all materials, labour, tools, safety belts, helmet, safety shoes, equipment, transport, fuel etc., complete. NOTE: 1.The actual area of glass used alone will be measured for payment purpose.
22.Supplying and fixing 5mm nominal thick plain glass of ground floor (saint gobain (or) Modiguard make) for Existing Aluminium door shutters / partition including removing of damaged glasses from the and fixing with necessary accessories like rubber beading, screw etc., all as directed at site of work including all materials, labour, tools, equipment, safety belts, helmet, safety shoes, transport, fuel etc.,complete. NOTE: 1. The actual area of glass used alone will be measured for payment purpose. 2. The rate shall include the cost of rubber beading, etc.,
23.Supplying and fixing approved quality non reflective type sun control film of thickness 50 micron of all floors (Gareware or equivalent) to the glass panels of the window / doors / partition after thoroughly cleaning the glass panels and removing the stains, any other foreign particles etc., if any, with good quality soap or liquid detergents and as directed including all materials labour, tools, equipments, safety belts, helmet, safety shoes, transport, fuel, etc., complete.
24.Dismantling and removing the existing aluminum sliding window / fixed aluminium partition panel and door frames at northern side of CB all floors (of area more than 3 sq.m ) including frame with shutters without damaging the structures nearby, including transporting and handing over the same to departmental stores / RSO yard within a lead of 3 km all as specified and as directed at site of work including all labour, tools, equipments, safety belts, helmet, safety shoes, transport, fuel etc., complete.
25.Providing and fixing factory made uPVC (60 series) white colour casement sliding window outer frame of size 62mmx60mm, shutter frame of size 66mmx42mm fixed with glass beading of size 25mmx16mm and fixed with 5mm thick plain glass of all floor comprising of uPVC multi-chambered framed with in-built roller track and sash extruded profiles duly reinforced with 1.60 thick galvanized mild steel including EPDM gasket wall thickness 2.3mm(+/-) 0.3 mm, wool pile, zinc alloy (white powder coated) handle on fixing frame to finished wall and necessary stainless steel screws etc. shall be mitered out and fusion welded at all corners, including required glass panels, drilling of holes for fixing hardware’s and drainage of water etc., and filled with weather proof silicon sealent over bracket rod of required size and of approved quality including all as per the manufacture specification and all as directed at site, materials, labour, brushes, tools, equipments, safety belts, helmet, safety shoes, etc., complete.
26.Providing and fixing factory made uPVC(58 series) white colour fixed window of wall thickness 2.3mm (+/-)0.3mm of all floors comprising of uPVC fixed outer frame of size 58mmx60mm, mullion frame of size 72mmx60mm duly reinforced with 1.60 thick galvanized mild steel including EPDM gasket, glass beading of size 25mmx16mm and fixed with 5mm thick plain glass, wool pile, and necessary stainless steel screws etc., shall be mitered cut and fusion welded at all corners, drilling of holes for fixing hardware’s etc., and filled with weather proof silicon sealent over backer rod of required and approved quality including all as per the manufacture specification and all as directed at site, materials, labour, tools, equipments, safety belts, helmet, safety shoes, etc., complete.
27.Loading, transporting, dumping and leveling the debris etc., in the low lying areas nearer to the site of work within a lead of 3 Kms all as per relevant specifications and as directed including all labour, transport, tools, equipments, safety belts, helmet, safety shoes, fuel, etc., complete. Note: 1. The tenderer shall maintain trip sheets in triplicate in Trust’s approved format at his own cost for the quantity of and debris transported. 2. No interim payment will be made and No deduction of voids for debris will be made. 3.How ever, the final quantity of Debris will be restricted to actual quantity of demolishing item ..
DEVVANAND GROUP
Creators Engineers and Interiors Pvt Ltd
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .