| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.6 LAccepted-AOC | L1 | Accepted-AOC quoted lowest amount | |
| 2 | L2₹35.0 L+₹16,753 (0.48%)Rejected-Finance | L2 | Rejected-Finance Rejected
because it
has quoted
Second
lowest
amount | |
| 3 | Rejected-Technical | - | Rejected-Technical Not complied with technical documents |
Tender Value
Refer Docs
EMD Value
₹1.6 L
Closing Date
12 Feb 2021, 2:00 pmClosed
Unit-In charge
Add- Camp Office, 17-H Ashok Vihar Colony Paharia Varanasi 221007
Labour Charges for construction of Langar Hall at Sant Ravidas Ji Janmsthali Sirgovardhan Varanasi.
2021_UPRNN_550706_1
96/e-Tender/RNN/Bhadohi Unit/20
Open Tender
Civil Works - Buildings
Item Rate
60 days
Sirgovardhan Varanasi
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
U P RAJKIYA NIRMAN NIGAM LTD.
₹1.6 L
5 Apr 2021
2 Feb 2021
12 Feb 2021
2 Feb 2021
12 Feb 2021
2 Feb 2021
Amount
Labour Charges
L/C for fixing and removal of shuttering wooden/steel including its hire charges and supply of all material ,shuttering oils cotton waste etc as required including all labour and T& P complete required for proper completion of work . A -for Columns upto 3.5 mtr height
B- Same as above item 1.01 but for Columns above 3.5 mtr upto 6.5 mtr height.
C- Same as above item 1.01 but Beam for floor height upto 6.5 mtr.
E- Same as above item but 1.01 Shuttering upto plinth level
L/C for RCC in specified mix or M-30 grade from RMC to site complete in all respect. A-Columns upto 3.5 mtr. Height
Same as above item but for upto 6.5 mtr height
Same as above item but for Beams for floor 6.5 mtr.
For slab
RCC upto plinth level
Labour charges for laying cement concrete 1:4:8 as specified mix in foundation including compaction as per direction of E/I
Labour Charges for brick work in foundation and plinth with cement mortar 1:6 of specified mix excluding cost of T& P and curing as per direction of E/I
Labour Charges for making Cover Block
Hire Charges of mixer with hopper for mixing of cement concrete including operator running and maintenance of mixer machine but excluding cost of fuel.
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .