Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.3 LAccepted-AOC | ₹10.3 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹10.3 LRejected-AOC | ₹10.3 L | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | K Ganesan L2 | K.SIVAPPA L1 |
|---|---|---|---|---|---|
| 1.001.Providing Pipe Drain and Pipe Line From AD Colony to Main Road @ Nariganapuram H/O B.S.Thimmasandhiram.Est.Amt.Rs:-10.37 Lakhs. | |||||
| 2.00 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. | 150.75 | Cum | 165.27 ₹24,914.45 | 164.61 ₹24,814.96 |
| 3.00 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed | 3.07 | Cum | 5,639.38 ₹17,312.90 | 5,616.88 ₹17,243.82 |
| 4.00 | Supply and cost of RCC NP3 Humepipe including cost and conveyance of all materials and labour charges etc complete. | 160 | Rm | 3,174.32 ₹5.1 L | 3,161.65 ₹5.1 L |
| 5.00 | Lowering RCC pipes and specials into the trenches and laying to proper grade Alignment | 160 | Rm | 181.84 ₹29,094.40 | 181.12 ₹28,979.20 |
| 6.00 | Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) | 101.76 | Sqm | 548.87 ₹55,853.01 | 546.68 ₹55,630.16 |
| 7.00 | Plain Cement Concrete 1:3:6 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 11.7 | Cum | 6,424.92 ₹75,171.56 | 6,399.29 ₹74,871.69 |
| 8.00 | Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour | 7.56 | Sqm | 586.81 ₹4,436.28 | 584.47 ₹4,418.59 |
| 9.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 0.22 | mt | 92,088.15 ₹20,351.48 | 91,720.71 ₹20,270.28 |
| 10.00 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 2.83 | Cum | 9,532.74 ₹26,977.65 | 9,494.71 ₹26,870.03 |
Updated dates
Tender Value
₹10.4 L
EMD Value
₹11,000
Closing Date
13 Feb 2026, 3:00 pmClosed
The Block Development Officer (V.P) Shoolagiri
The Block Development Office Shoolagiri
Krishnagiri District Shoolagiri Block under the Scheme Mines and Minerals_2023_24 Providing Pipe Drain and Pipe Line From Ad Colony to Main Road at Nariganapuram in B.S.Thimmasandhiram Panchayat Package No_2025_26_SGI_111
2026_RDTN_652890_1
Rocno_3342_2025_E2
Open Tender
Civil Works
The Block Development Office Shoolagiri
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹11,000
Yes
The Block Development Office Shoolagiri
14 Mar 2026
7 Feb 2026
13 Feb 2026
7 Feb 2026
13 Feb 2026
7 Feb 2026
9 Feb 2026
1.Providing Pipe Drain and Pipe Line From AD Colony to Main Road @ Nariganapuram H/O B.S.Thimmasandhiram.Est.Amt.Rs:-10.37 Lakhs.
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Supply and cost of RCC NP3 Humepipe including cost and conveyance of all materials and labour charges etc complete.
Lowering RCC pipes and specials into the trenches and laying to proper grade Alignment
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid)
Plain Cement Concrete 1:3:6 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Refilling in Basement with excavated Earth in layers of not more than 15cm. Thick well rammed, watered and consolidated complying with standard specifications etc., complete.
Providing Pipe Line
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Refilling in Basement with excavated Earth in layers of not more than 15cm. Thick well rammed, watered and consolidated complying with standard specifications etc., complete.
Towards Supply Cost laying of GI/PVC Pipes & Specials including all cost and conveyance of all charges
63mm 4KSC PVC Pipe
63mm PVC Bend
Saddle Piece 63mmx20mm
75mm HDPE Pipe -PE-100-PN-6
Provision For name Board Charges
Provision For Photocharges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.64 MB
BOQ_782860.xls
BOQ • 0.32 MB
PB111.pdf
Tender Documents • 0.84 MB
TB111.pdf
Tender Documents • 0.89 MB
Download all tender documents and submit your bid