Tender Value
₹8.1 Cr
EMD Value
₹16.2 L
Closing Date
29 Oct 2026, 12:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Arvind
DIV 2 Panchkula
Construction of Roads, Parking and Interlocking concrete block Pavement (60 mm thick) and Protection Work of Nallah on Nada Choe Boundary from IP-1 to DSS No. 452 in Shopping Centre, Sector-25 Part III, Panchkula complete in all respects including 3
2026_HBC_554746_1
2026F71F737D 80B1 489E 91EF 6485C58CEB4F270HSV
Open Tender
Civil Works
Works
540 days
Panchkula
2 documents required · 2 mandatory
₹5,000
₹16.2 L
Yes
15 Oct 2026
15 Oct 2026
29 Oct 2026
15 Oct 2026
29 Oct 2026
15 Oct 2026
15 Oct 2026 - 17 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [1.PM084] PM084. Hydraulic Excavator of 1 cum bucket [Rate] | 160 | Hours | 1,965 | ₹3,14,400 |
| 2 | [11.67.1]Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface : 1. Water thinnable cement primer [Through Rate] | 873.7 | Sqm | 22 | ₹19,221.4 |
| 3 | [16.32]Filing stones or spalls into crates, and hand-packing by mechanical/ mannual means. [Through Rate] | 2,530 | cum | 97 | ₹2,45,410 |
| 4 | [17.14.3]Granular Sub-Base with Close Graded Material - (Table:- 400-1) Plant mix method
Construction of granular sub-base by providing Material as per Grading III (Table 400-I of MORTandH 5th revision) mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per technical clause 401 of MORTandH specifications 3. Grading III material [Through Rate] | 5,093.6 | cum | 1,197 | ₹60,97,039.2 |
| 5 | [17.24]Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per technical clause 406 of MORT&H specifications [Through Rate] | 7,508.05 | cum | 1,174 | ₹88,14,450.7 |
| 6 | [17.25.1]Prime Coat @ 0.85kg per sqm 1. Prime Coat @ 0.60kg per sqm Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means as per technical clause 503 of MORT&H specifications [Through Rate] | 33,075 | Sqm | 48 | ₹15,87,600 |
| 7 | [17.26.2]Tack Coat 2. Providing and applying tack coat with penetration grade bitumen VG - 10 using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous/ granular surface cleaned with mechanical broom as per technical clause 503 of MORT&H specifications [Through Rate] | 66,150 | Sqm | 18 | ₹11,90,700 |
| 8 | [17.30.2]Dense Graded Bituminous Macadam with Batch Type HMP 2. Dense Graded Bituminous Macadam 50 mm to 75 mm thickness (Grading II) Providing and laying 50mm - 75 mm dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG 30 @ 4.5% by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete, as per technical clause No. 505 of MORT&H specifications Note-If bitumen required is more than 4.5% as per job mix formula, no extra payment will be paid. Extra bitumen required will be considered as incidental to work. [Through Rate] | 1,653.75 | cum | 7,397 | ₹1,22,32,788.75 |
| 9 | [17.31.2]Bituminous Concrete with Batch type HMP 2. Bituminous Concrete 30 mm to 45 mm thickness (grading II) with 100-120 TPH batch type HMP Providing and laying 30mm - 45 mm bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG - 30 @ 5.4% per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete as per technical clause 507 of per MORTH specifications Note-If bitumen required is more than 5.4% as per job mix formula, no extra payment will be paid. Extra bitumen required will be considered as incidental to work. [Through Rate] | 992.25 | cum | 8,923 | ₹88,53,846.75 |
| 10 | [17.5.3]Compacting Original Ground 3. Compaction of Earthwork
Compaction of & preparation of sub grade including loosening, levelling of earth 225 mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the Table 3000-2 as per technical clause 305 of MORT&H specifications [Through Rate] | 36,438.1 | Sqm | 7 | ₹2,55,066.7 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.92 MB
BOQ_634670.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .