Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10 LAccepted-AOC | L1 | Accepted-AOC Lowest | |
| 2 | L2₹11.2 L+₹1.2 L (12.0%)Rejected-Finance SALEMPUR ROAD SADABAD HATHRAS | HATHRAS | HATHRAS | UTTAR PRADESH | L2 | Rejected-Finance Highest | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
31 Mar 2022, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE EDC-I, Mathura
Near Kali Mandir, Mathura Cantt, Mathura
The work for Installation of Three phase meters On New Connection of PTW connections along with other associated works under EDD-Ist, Mathura
2021_DVVNL_661400_1
73/EDC-I(M)/2021-22
Open Tender
Electrical Works
Item Rate
180 days
Mathura
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Dvvnl Agra
₹10,000
Yes
20 Oct 2022
21 Dec 2021
31 Mar 2022
21 Dec 2021
31 Mar 2022
21 Dec 2021
90 days
Amount
(A) Cartage of Three phase energy meter from Mathura Store to Test Lab and then prepairing the meter by fixing plastic / hologram seals and entering meter data on meter ragister accordingly and then marking the Lab meter No. on meter cover with permanent marker pen and then carting the meter from the Test Lab to respective 33/11 KV substation/ site of work [Distance appxy 50 Km.], as per direction of Supervising Engineer including the work of loading, unloading and stacking the meters at the respective ends.and also Including the cost of arrangement of labour, T & P, carrier required for proper completion of work. (B) Installation of Three Phase Meter at outside the premises of PTW consumers by proper laying and fixing of cable from respective pole to meter including the work of sealing and filling of sealing certificate properly. The work Cost of Labour and T&P required for proper completion of work. (C) Review of connections for confirming MU Base Billing after 10-15 days of meter installation as per Billing Parameter and providing meter reading in KWH and Maximum Demand in M.S. Excel format.
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .