| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹595.5 CrAccepted-AOC | ₹595.5 Cr | L1 | Accepted-AOC Lowest bid |
| 2 | L2₹660.8 CrRejected-AOC PLOT NO 61 KESHAV NAGAR HAWA SADAK JAIPUR RAJASTHAN 302006 | JAIPUR | RAJASTHAN | 302006 | ₹660.8 Cr | L2 | Rejected-AOC Not the lowest bid |
| 3 | L3₹700.5 CrRejected-AOC HEAD OFFICE 8TH FLOOR EXPRESS CORPORATE PARK SECTOR 16A FILM CITY NOIDA GAUTAM BUDDHA NAGAR UTTAR PRADESH 201301 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | ₹700.5 Cr | L3 | Rejected-AOC Not the lowest bid |
| 4 | L4₹742.1 CrRejected-AOC 807 PEARL BUSINESS PARK NETAJI SUBHASH PLACE PITAMPURA DELHI | DELHI | DELHI | ₹742.1 Cr | L4 | Rejected-AOC Not the lowest bid |
| 5 | L5₹748.1 CrRejected-AOC 401 THE GRAND MALL OPP STATE BANK ZONAL OFFICE S M ROAD AMBAWADI AHMEDABAD 380015 | AHMADABAD | GUJARAT | 380015 | ₹748.1 Cr | L5 | Rejected-AOC Not the lowest bid |
Tender Value
Refer Docs
Closing Date
22 Sept 2021, 3:00 pmClosed
General Manager
Office of the General Manager, Yamuna Pollution Control Unit, UP Jal Nigam, Water Works Crossing, Jeoni Mandi Road, Agra 282004, UP
Design, Build, Finance, Operate and Transfer Sewage Treatment Plants (STPs) along with Associated Infrastructure for a period of 15 years through Hybrid Annuity Based PPP Mode in Agra, Uttar Pradesh under the Namami Gange Programme
2021_UPJNM_586761_1
1140/Nivida/10, Dt. 13.05.2021
Global Tenders
Civil Works - Others
730 days
Agra
As per bid documents.
4 documents required · 4 mandatory
₹0
Exempted
Agra
25 Jun 2022
17 May 2021
22 Sept 2021
17 May 2021
22 Sept 2021
1 Sept 2021
17 May 2021 - 9 Jun 2021
10 Jun 2021
Amount
Northern and Tajganj Zone Package Facilities - Jaganpur (New) Facilities (Jaganpur (New) STP Facilities + Jaganpur (New) Associated Infrastructure)
Bid Project Cost for Jaganpur (New) Facilities (Jaganpur (New) STP Facilities + Jaganpur (New) Associated Infrastructure) (including all cess, levies, duties etc. but excluding GST)
Jaganpur (New) STP Facilities
Jaganpur (New) Associated Infrastructure
O&M Charges for the first month after COD (including all cess, levies, duties etc. but excluding GST) for the Jaganpur (New) STP Facilities
Manpower
Maintenance and Repair
Chemicals
O&M Charges for the first month after COD (including all cess, levies, duties etc. but excluding GST) for the Jaganpur (New) Associated Infrastructure
Manpower
Maintenance and Repair
Guaranteed Energy Consumption for the Jaganpur (New) STP Facilities, Jaganpur (New) STP Guaranteed Energy Consumption (Value should be entered in all the cells from row nos. 25 to 39 and should be greater than 0)
For flow upto 20 MLD and BOD upto 100 mg/L
For flow upto 20 MLD and BOD > 100 mg/L and upto 150 mg/L
For flow upto 20 MLD and BOD > 150 mg/L and upto 200 mg/L
For flow upto 20 MLD and BOD > 200 mg/L and upto 250 mg/L
For flow upto 20 MLD and BOD > 250 mg/L and upto 300 mg/L
For flow > 20 MLD and upto 25 MLD and BOD upto 100 mg/L
For flow > 20 MLD and upto 25 MLD and BOD > 100 mg/L and upto 150 mg/L
For flow > 20 MLD and upto 25 MLD and BOD > 150 mg/L and upto 200 mg/L
For flow > 20 MLD and upto 25 MLD and BOD > 200 mg/L and upto 250 mg/L
For flow > 20 MLD and upto 25 MLD and BOD > 250 mg/L and upto 300 mg/L
For flow > 25 MLD and upto 31 MLD and BOD upto 100 mg/L
For flow > 25 MLD and upto 31 MLD and BOD > 100 mg/L and upto 150 mg/L
For flow > 25 MLD and upto 31 MLD and BOD > 150 mg/L and upto 200 mg/L
For flow > 25 MLD and upto 31 MLD and BOD > 200 mg/L and upto 250 mg/L
For flow > 25 MLD and upto 31 MLD and BOD > 250 mg/L and upto 300 mg/L
Jaganpur (New) STP Average Guaranteed Energy Consumption for the 31 MLD new STP (To be filled as 0.00 by the bidder)
Jaganpur (New) STP Power Charges for the 31 MLD new STP (Average GEC from 1.27 above)x(31 MLD)x(365x15)x(Power unit rate=8.60/kWh)x(Multiplication factor=1.52) (To be filled as 0.00 by the bidder)
Guaranteed Energy Consumption for the Jaganpur (New) Associated Infrastructure, Jaganpur (New) Associated Infrastructure Guaranteed Energy Consumption (Note : the Bidder is required to quote the Guaranteed Energy Consumption in kWh/MLD. The value shown in quantity is computed as - (Cumulative Flow in the Pumping Stations - 31 MLD for Evaluation purposes)X(365x15)x(Power Unit Rate)x(Multiplication Factor) - 31x5475x8.60x1.30)
Land requirement for STP Facilities (Note: Land cost, as per circle rate of INR 4,350 per sq.m, is shown in the quantity column and the Bidder has to enter the Land requirement for STP Facilities in sq.m in the rate column so that the total amount required can be calculated. The maximum land requirement quoted by the bidder should not exceed 41300 sq.m)
Total for Jaganpur (New) Facilities (To be filled as 0.00 by the bidder)
Northern and Tajganj Zone Package Facilities - Artoni Facilities (Artoni Decentralised STP Facilities + Artoni Associated Infrastructure)
Bid Project Cost for Artoni Facilities (Artoni Decentralized STP Facilities + Artoni Associated Infrastructure) (including all cess, levies, duties etc. but excluding GST)
Artoni Decentralized STP Facilities
Artoni Associated Infrastructure
O&M Charges for the first month after COD (including all cess, levies, duties etc. but excluding GST) for the Artoni Decentralised STP Facilities
Manpower
Maintenance and Repair
Chemicals
O&M Charges for the first month after COD (including all cess, levies, duties etc. but excluding GST) for the Artoni Associated Infrastructure
Manpower
Maintenance and Repair
Guaranteed Energy Consumption for the Artoni Decentralized STP (Note: the Bidder is required to quote the Guaranteed Energy Consumption in kWh/MLD. The value shown in quantity is computed as - (Cumulative Flow in the STPs - 0.35 MLD for Evaluation purposes)X(365x15)X(Power Unit Rate)X(Multiplication Factor) - 0.35x365x15x8.60x1.20)
Guaranteed Energy consumption for the Artoni Associated Infrastructure, Artoni Associated Infrastructure Guaranteed Energy Consumption (Note : the Bidder is required to quote the Guaranteed Energy Consumption in kWh/MLD. The value shown in quantity is computed as - (Cumulative Flow in the nalas - 0.35 MLD for Evaluation purposes)X(365x15)x(Power Unit Rate) - 0.35x5475x8.60)
Total for Artoni Facilities (To be filled as 0.00 by the bidder)
Northern and Tajganj Zone Package Facilities - Jalma Facilities (Jalma STP Facilities + Jalma Associated Infrastructure)
Bid Project Cost for Jalma Facilities (Jalma Decentralized STP Facilities + Jalma Associated Infrastructure) (including all cess, levies, duties etc. but excluding GST)
Jalma Decentralized STP Facilities
Jalma Associated Infrastructure
O&M Charges for the first month after COD (including all cess, levies, duties etc. but excluding GST) for the Jalma Decentralised STP Facilities
Manpower
Maintenance and Repair
Chemicals
O&M Charges for the first month after COD (including all cess, levies, duties etc. but excluding GST) for the Jalma Associated Infrastructure
Manpower
Maintenance and Repair
Guaranteed Energy Consumption for the Jalma Decentralized STP (Note: the Bidder is required to quote the Guaranteed Energy Consumption in kWh/MLD. The value shown in quantity is computed as - (Cumulative Flow in the STPs - 0.30 MLD for Evaluation purposes)X(365x15)X(Power Unit Rate)X(Multiplication Factor) - 0.30x365x15x8.60x1.20)
Guaranteed Energy consumption for the Jalma Associated Infrastructure, Jalma Associated Infrastructure Guaranteed Energy Consumption (Note : the Bidder is required to quote the Guaranteed Energy Consumption in kWh/MLD. The value shown in quantity is computed as - (Cumulative Flow in the nalas - 0.30 MLD for Evaluation purposes)X(365x15)x(Power Unit Rate) - 0.3x5475x8.60)
Total for Jalma Facilities (To be filled as 0.00 by the bidder)
Northern and Tajganj Zone Package Facilities - Kailash Mandir Facilities (Kailash Mandir Decentralised STP Facilities + Kailash Mandir Associated Infrastructure)
Bid Project Cost for Kailash Mandir Facilities (Kailash Mandir Decentralized STP Facilities + Kailash Mandir Associated Infrastructure) (including all cess, levies, duties etc. but excluding GST)
Kailash Mandir Decentralized STP Facilities
Kailash Mandir Associated Infrastructure
O&M Charges for the first month after COD (including all cess, levies, duties etc. but excluding GST) for the Kailash Mandir Decentralised STP Facilities
Manpower
Maintenance and Repair
Chemicals
O&M Charges for the first month after COD (including all cess, levies, duties etc. but excluding GST) for the Kailash Mandir Associated Infrastructure
Manpower
Maintenance and Repair
Guaranteed Energy Consumption for the Kailash Mandir Decentralized STP (Note: the Bidder is required to quote the Guaranteed Energy Consumption in kWh/MLD. The value shown in quantity is computed as - (Cumulative Flow in the STPs - 0.02 MLD for Evaluation purposes)X(365x15)X(Power Unit Rate)X(Multiplication Factor) - 0.02x365x15x8.60x1.20)
Guaranteed Energy consumption for the Kailash Mandir Associated Infrastructure, Kailash Mandir Associated Infrastructure Guaranteed Energy Consumption (Note : the Bidder is required to quote the Guaranteed Energy Consumption in kWh/MLD. The value shown in quantity is computed as - (Cumulative Flow in the nalas - 0.02 MLD for Evaluation purposes)X(365x15)x(Power Unit Rate) - 0.02x5475x8.60)
Total for Kailash Mandir Facilities (To be filled as 0.00 by the bidder)
Northern and Tajganj Zone Package Facilities - K K Nagar Facilities (K K Nagar Decentralised STP Facilities + K K Nagar Associated Infrastructure)
Bid Project Cost for K K Nagar Facilities (K K Nagar Decentralized STP Facilities + K K Nagar Associated Infrastructure) (including all cess, levies, duties etc. but excluding GST)
K K Nagar Decentralized STP Facilities
K K Nagar Associated Infrastructure
O&M Charges for the first month after COD (including all cess, levies, duties etc. but excluding GST) for the K K Nagar Decentralised STP Facilities
Manpower
Maintenance and Repair
Chemicals
O&M Charges for the first month after COD (including all cess, levies, duties etc. but excluding GST) for the K K Nagar Associated Infrastructure
Manpower
Maintenance and Repair
Guaranteed Energy Consumption for the K K Nagar Decentralized STP (Note: the Bidder is required to quote the Guaranteed Energy Consumption in kWh/MLD. The value shown in quantity is computed as - (Cumulative Flow in the STPs - 1.6 MLD for Evaluation purposes)X(365x15)X(Power Unit Rate)X(Multiplication Factor) - 1.6x365x15x8.60x1.20)
Guaranteed Energy consumption for the K K Nagar Associated Infrastructure, K K Nagar Associated Infrastructure Guaranteed Energy Consumption (Note : the Bidder is required to quote the Guaranteed Energy Consumption in kWh/MLD. The value shown in quantity is computed as - (Cumulative Flow in the nalas - 1.6 MLD for Evaluation purposes)X(365x15)x(Power Unit Rate) - 1.6x5475x8.60)
Total for K K Nagar Facilities (To be filled as 0.00 by the bidder)
Northern and Tajganj Zone Package Facilities - Mau Nala Facilities (Mau Nala Decentralised STP Facilities + Mau Nala Associated Infrastructure)
Bid Project Cost for Mau Nala Facilities (Mau Nala Decentralized STP Facilities + Mau Nala Associated Infrastructure) (including all cess, levies, duties etc. but excluding GST)
Mau Nala Decentralized STP Facilities
Mau Nala Associated Infrastructure
O&M Charges for the first month after COD (including all cess, levies, duties etc. but excluding GST) for the Mau Nala Decentralised STP Facilities
Manpower
Maintenance and Repair
Chemicals
O&M Charges for the first month after COD (including all cess, levies, duties etc. but excluding GST) for the Mau Nala Associated Infrastructure
Manpower
Maintenance and Repair
Guaranteed Energy Consumption for the Mau Nala Decentralized STP (Note: the Bidder is required to quote the Guaranteed Energy Consumption in kWh/MLD. The value shown in quantity is computed as - (Cumulative Flow in the STPs - 1.13 MLD for Evaluation purposes)X(365x15)X(Power Unit Rate)X(Multiplication Factor) - 1.13x365x15x8.60x1.20)
Guaranteed Energy consumption for the Mau Nala Associated Infrastructure, Mau Nala Associated Infrastructure Guaranteed Energy Consumption (Note : the Bidder is required to quote the Guaranteed Energy Consumption in kWh/MLD. The value shown in quantity is computed as - (Cumulative Flow in the nalas/ pumping stations - 1.13 MLD for Evaluation purposes)X(365x15)x(Power Unit Rate)x(Multiplication Factor) - 1.13x5475x8.60x1.18)
Total for Mau Nala Facilities (To be filled as 0.00 by the bidder)
Northern and Tajganj Zone Package Facilities - Transport Nagar Facilities (Transport Nagar Decentralised STP Facilities + Transport Nagar Associated Infrastructure)
Bid Project Cost for Transport Nagar Facilities (Transport Nagar Decentralized STP Facilities + Transport Nagar Associated Infrastructure) (including all cess, levies, duties etc. but excluding GST)
Transport Nagar Decentralized STP Facilities
Transport Nagar Associated Infrastructure
O&M Charges for the first month after COD (including all cess, levies, duties etc. but excluding GST) for the Transport Nagar Decentralised STP Facilities
Manpower
Maintenance and Repair
Chemicals
O&M Charges for the first month after COD (including all cess, levies, duties etc. but excluding GST) for the Transport Nagar Associated Infrastructure
Manpower
Maintenance and Repair
Guaranteed Energy Consumption for the Transport Nagar Decentralized STP (Note: the Bidder is required to quote the Guaranteed Energy Consumption in kWh/MLD. The value shown in quantity is computed as - (Cumulative Flow in the STPs - 3 MLD for Evaluation purposes)X(365x15)X(Power Unit Rate)X(Multiplication Factor) - 3x365x15x8.60x1.20)
Guaranteed Energy consumption for the Transport Nagar Associated Infrastructure, Transport Nagar Associated Infrastructure Guaranteed Energy Consumption (Note : the Bidder is required to quote the Guaranteed Energy Consumption in kWh/MLD. The value shown in quantity is computed as - (Cumulative Flow in the nalas - 3 MLD for Evaluation purposes)X(365x15)x(Power Unit Rate) - 3x5475x8.60)
Total for Transport Nagar Facilities (To be filled as 0.00 by the bidder)
Northern and Tajganj Zone Package Facilities - Wyepur Facilities (Wyepur Decentralised STP Facilities + Wyepur Associated Infrastructure)
Bid Project Cost for Wyepur Facilities (Wyepur Decentralized STP Facilities + Wyepur Associated Infrastructure) (including all cess, levies, duties etc. but excluding GST)
Wyepur Decentralized STP Facilities
Wyepur Associated Infrastructure
O&M Charges for the first month after COD (including all cess, levies, duties etc. but excluding GST) for the Wyepur Decentralised STP Facilities
Manpower
Maintenance and Repair
Chemicals
O&M Charges for the first month after COD (including all cess, levies, duties etc. but excluding GST) for the Wyepur Associated Infrastructure
Manpower
Maintenance and Repair
Guaranteed Energy Consumption for the Wyepur Decentralized STP (Note: the Bidder is required to quote the Guaranteed Energy Consumption in kWh/MLD. The value shown in quantity is computed as - (Cumulative Flow in the STPs - 2.35 MLD for Evaluation purposes)X(365x15)X(Power Unit Rate)x(Multiplication Factor) - 2.35x365x15x8.60x1.20)
Guaranteed Energy consumption for the Wyepur Associated Infrastructure, Wyepur Associated Infrastructure Guaranteed Energy Consumption (Note : the Bidder is required to quote the Guaranteed Energy Consumption in kWh/MLD. The value shown in quantity is computed as - (Cumulative Flow in the nalas - 2.35 MLD for Evaluation purposes)X(365x15)x(Power Unit Rate) - 2.35x5475x8.60)
Total for Wyepur Facilities (To be filled as 0.00 by the bidder)
Eastern Zone Package Facilities - Peelakhar (New) Facilities (Peelakhar (New) STP Facilities + Peelakhar (New) Associated Infrastructure)
Bid Project Cost for Peelakhar (New) Facilities (Peelakhar (New) STP Facilities + Peelakhar (New) Associated Infrastructure) (including all cess, levies, duties etc. but excluding GST)
Peelakhar (New) STP Facilities
Peelakhar (New) Associated Infrastructure
O&M Charges for the first month after COD (including all cess, levies, duties etc. but excluding GST) for the Peelakhar (New) STP Facilities
Manpower
Maintenance and Repair
Chemicals
O&M Charges for the first month after COD (including all cess, levies, duties etc. but excluding GST) for the Peelakhar (New) Associated Infrastructure
Manpower
Maintenance and Repair
Guaranteed Energy Consumption for the Peelakhar (New) STP Facilities, Peelakhar (New) STP Guaranteed Energy Consumption (Value should be entered in all the cells from row no.s 155 to 169 and should be greater than 0)
For flow upto 23 MLD and BOD upto 100 mg/L
For flow upto 23 MLD and BOD > 100 mg/L and upto 150 mg/L
For flow upto 23 MLD and BOD > 150 mg/L and upto 200 mg/L
For flow upto 23 MLD and BOD > 200 mg/L and upto 250 mg/L
For flow upto 23 MLD and BOD > 250 mg/L and upto 300 mg/L
For flow > 23 MLD and upto 28 MLD and BOD upto 100 mg/L
For flow > 23 MLD and upto 28 MLD and BOD > 100 mg/L and upto 150 mg/L
For flow > 23 MLD and upto 28 MLD and BOD > 150 mg/L and upto 200 mg/L
For flow > 23 MLD and upto 28 MLD and BOD > 200 mg/L and upto 250 mg/L
For flow > 23 MLD and upto 28 MLD and BOD > 250 mg/L and upto 300 mg/L
For flow > 28 MLD and upto 35 MLD and BOD upto 100 mg/L
For flow > 28 MLD and upto 35 MLD and BOD > 100 mg/L and upto 150 mg/L
For flow > 28 MLD and upto 35 MLD and BOD > 150 mg/L and upto 200 mg/L
For flow > 28 MLD and upto 35 MLD and BOD > 200 mg/L and upto 250 mg/L
For flow > 28 MLD and upto 35 MLD and BOD > 250 mg/L and upto 300 mg/L
Peelakhar (New) STP Average Guaranteed Energy Consumption for the 35 MLD new STP (To be filled as 0.00 by the bidder)
Peelakhar (New) STP Power Charges for the 35 MLD new STP (Average GEC from 9.27 above)x(35 MLD)x(365x15)x(Power unit rate=8.60/kWh)x(Multiplication Factor=1.49) (To be filled as 0.00 by the bidder)
Guaranteed Energy Consumption for the Peelakhar (New) Associated Infrastructure, Peelakhar (New) Associated Infrastructure Guaranteed Energy Consumption (Note : the Bidder is required to quote the Guaranteed Energy Consumption in kWh/MLD. The value shown in quantity is computed as - (Cumulative Flow in the Pumping Stations - 35 MLD for Evaluation purposes)X(365x15)x(Power Unit Rate)x(Multiplication Factor) - 35x5475x8.60x1.29)
Land requirement for STP Facilities (Note: Land cost, as per circle rate of INR 900per sq.m, is shown in the quantity column and the Bidder has to enter the Land requirement for STP Facilities in sq.m in the rate column so that the total amount required can be calculated. The maximum land requirement quoted by the bidder should not exceed 150600 sq.m)
Total for Peelakhar (New) Facilities (To be filled as 0.00 by the bidder)
Eastern Zone Package Facilities - Dharwale Baba Facilities (Dharwale Baba STP Facilities + Dharwale Baba Associated Infrastructure)
Bid Project Cost for Dharwale Baba Facilities (Dharwale Baba Decentralized STP Facilities + Dharwale Baba Associated Infrastructure) (including all cess, levies, duties etc. but excluding GST)
Dharwale Baba Decentralized STP Facilities
Dharwale Baba Associated Infrastructure
O&M Charges for the first month after COD (including all cess, levies, duties etc. but excluding GST) for the Dharwale Baba Decentralised STP Facilities
Manpower
Maintenance and Repair
Chemicals
O&M Charges for the first month after COD (including all cess, levies, duties etc. but excluding GST) for the Dharwale Baba Associated Infrastructure
Manpower
Maintenance and Repair
Guaranteed Energy Consumption for the Dharwale Baba Decentralized STP (Note: the Bidder is required to quote the Guaranteed Energy Consumption in kWh/MLD. The value shown in quantity is computed as - (Cumulative Flow in the STPs - 1.1 MLD for Evaluation purposes)X(365x15)X(Power Unit Rate)X(Multiplication Factor) - 1.1x365x15x8.60x1.20)
Guaranteed Energy consumption for the Dharwale Baba Associated Infrastructure, Dharwale Baba Associated Infrastructure Guaranteed Energy Consumption (Note : the Bidder is required to quote the Guaranteed Energy Consumption in kWh/MLD. The value shown in quantity is computed as - (Cumulative Flow in the nalas - 1.1 MLD for Evaluation purposes)X(365x15)x(Power Unit Rate) - 1.1x5475x8.60)
Total for Dharwale Baba Facilities (To be filled as 0.00 by the bidder)
Eastern Zone Package Facilities - Indira Nagar Memorial Facilities (Indira Nagar Memorial STP Facilities + Indira Nagar Memorial Associated Infrastructure)
Bid Project Cost for Indira Nagar Memorial Facilities (Indira Nagar Memorial Decentralized STP Facilities + Indira Nagar Memorial Associated Infrastructure) (including all cess, levies, duties etc. but excluding GST)
Indira Nagar Memorial Decentralized STP Facilities
Indira Nagar Memorial Associated Infrastructure
O&M Charges for the first month after COD (including all cess, levies, duties etc. but excluding GST) for the Indira Nagar Memorial Decentralised STP Facilities
Manpower
Maintenance and Repair
Chemicals
O&M Charges for the first month after COD (including all cess, levies, duties etc. but excluding GST) for the Indira Nagar Memorial Associated Infrastructure
Manpower
Maintenance and Repair
Guaranteed Energy Consumption for the Indira Nagar Memorial Decentralized STP (Note: the Bidder is required to quote the Guaranteed Energy Consumption in kWh/MLD. The value shown in quantity is computed as - (Cumulative Flow in the STPs - 1.5 MLD for Evaluation purposes)X(365x15)X(Power Unit Rate)X(Multiplication Factor) - 1.5x365x15x8.60x1.20)
Guaranteed Energy consumption for the Indira Nagar Memorial Associated Infrastructure, Indira Nagar Memorial Associated Infrastructure Guaranteed Energy Consumption (Note : the Bidder is required to quote the Guaranteed Energy Consumption in kWh/MLD. The value shown in quantity is computed as - (Cumulative Flow in the nalas - 1.5 MLD for Evaluation purposes)X(365x15)x(Power Unit Rate) - 1.5x5475x8.60)
Total for Indira Nagar Memorial Facilities (To be filled as 0.00 by the bidder)
Eastern Zone Package Facilities - Peelipokhar Facilities (Peelipokhar STP Facilities + Peelipokhar Associated Infrastructure)
Bid Project Cost for Peelipokhar Facilities (Peelipokhar Decentralized STP Facilities + Peelipokhar Associated Infrastructure) (including all cess, levies, duties etc. but excluding GST)
Peelipokhar Decentralized STP Facilities
Peelipokhar Associated Infrastructure
O&M Charges for the first month after COD (including all cess, levies, duties etc. but excluding GST) for the Peelipokhar Decentralised STP Facilities
Manpower
Maintenance and Repair
Chemicals
O&M Charges for the first month after COD (including all cess, levies, duties etc. but excluding GST) for the Peelipokhar Associated Infrastructure
Manpower
Maintenance and Repair
Guaranteed Energy Consumption for the Peelipokhar Decentralized STP (Note: the Bidder is required to quote the Guaranteed Energy Consumption in kWh/MLD. The value shown in quantity is computed as - (Cumulative Flow in the STPs - 0.25 MLD for Evaluation purposes)X(365x15)X(Power Unit Rate)X(Multiplication Factor) - 0.25x365x15x8.60x1.20)
Guaranteed Energy consumption for the Peelipokhar Associated Infrastructure, Peelipokhar Associated Infrastructure Guaranteed Energy Consumption (Note : the Bidder is required to quote the Guaranteed Energy Consumption in kWh/MLD. The value shown in quantity is computed as - (Cumulative Flow in the nalas - 0.25 MLD for Evaluation purposes)X(365x15)x(Power Unit Rate) - 0.25x5475x8.60)
Total for Peelipokhar Facilities (To be filled as 0.00 by the bidder)
Dhandhupura (New) Package Facilities - Dhandhupura (New) Facilities (Dhandhupura (New) STP Facilities + Dhandhupura (New) Associated Infrastructure)
Bid Project Cost for Dhandhupura (New) Facilities (Dhandhupura (New) STP Facilities + Dhandhupura (New) Associated Infrastructure) (including all cess, levies, duties etc. but excluding GST)
Dhandhupura (New) STP Facilities
Dhandhupura (New) Associated Infrastructure
O&M Charges for the first month after COD (including all cess, levies, duties etc. but excluding GST) for the Dhandhupura (New) STP Facilities
Manpower
Maintenance and Repair
Chemicals
O&M Charges for the first month after COD (including all cess, levies, duties etc. but excluding GST) for the Dhandhupura (New) Associated Infrastructure
Manpower
Maintenance and Repair
Dhandhupura (New) STP Guaranteed Energy Consumption (Value should be entered in all the cells from row no.s 229 to 243 and should be greater than 0)
For flow upto 65 MLD and BOD upto 100 mg/L
For flow upto 65 MLD and BOD > 100 mg/L and upto 150 mg/L
For flow upto 65 MLD and BOD > 150 mg/L and upto 200 mg/L
For flow upto 65 MLD and BOD > 200 mg/L and upto 250 mg/L
For flow upto 65 MLD and BOD > 250 mg/L and upto 300 mg/L
For flow > 65 MLD and upto 80 MLD and BOD upto 100 mg/L
For flow > 65 MLD and upto 80 MLD and BOD > 100 mg/L and upto 150 mg/L
For flow > 65 MLD and upto 80 MLD and BOD > 150 mg/L and upto 200 mg/L
For flow > 65 MLD and upto 80 MLD and BOD > 200 mg/L and upto 250 mg/L
For flow > 65 MLD and upto 80 MLD and BOD > 250 mg/L and upto 300 mg/L
For flow > 80 MLD and upto 100 MLD and BOD upto 100 mg/L
For flow > 80 MLD and upto 100 MLD and BOD > 100 mg/L and upto 150 mg/L
For flow > 80 MLD and upto 100 MLD and BOD > 150 mg/L and upto 200 mg/L
For flow > 80 MLD and upto 100 MLD and BOD > 200 mg/L and upto 250 mg/L
For flow > 80 MLD and upto 100 MLD and BOD > 250 mg/L and upto 300 mg/L
Dhandhupura (New) STP Average Guaranteed Energy Consumption for the 100 MLD new STP (To be filled as 0.00 by the bidder)
Dhandhupura (New) STP Power Charges for the 100 MLD new STP (Average GEC from 13.27 above)x(100 MLD)x(365x15)x(Power unit rate=8.60/kWh)x(Multiplication Factor=1.40) (To be filled as 0.00 by the bidder)
Dhandhupura (New) Associated Infrastructure Guaranteed Energy Consumption (Note : the Bidder is required to quote the Guaranteed Energy Consumption in kWh/MLD. The value shown in quantity is computed as - (Cumulative Flow in the Pumping Stations - 100 MLD for Evaluation purposes)X(365x15)x(Power Unit Rate)x(Multiplication Factor) - 100x5475x8.60x1.27)
Land requirement for STP Facilities (Note: Land cost, as per circle rate of INR 2,000 per sq.m, is shown in the quantity column and the Bidder has to enter the Land requirement for STP Facilities in sq.m in the rate column so that the total amount required can be calculated. The maximum land requirement quoted by the bidder should not exceed 51100 sq.m)
Total for Dhandhupura (New) Facilities (To be filled as 0.00 by the bidder)
Currency of the Bids
Foreign Currency 1 (To be filled as NA if not opted for Foreign Currency 1)
Foreign Currency 2 (To be filled as NA if not opted for Foreign Currency 2)
Foreign Currency 3 (To be filled as NA if not opted for Foreign Currency 3)
RBI Exchange rate prevailing 28 days prior to the Bid Due Date for Foreign Currency 1 (To be filled as 0.00 if not opted for Foreign Currency 1)
RBI Exchange rate prevailing 28 days prior to the Bid Due Date for Foreign Currency 2 (To be filled as 0.00 if not opted for Foreign Currency 2)
RBI Exchange rate prevailing 28 days prior to the Bid Due Date for Foreign Currency 3 (To be filled as 0.00 if not opted for Foreign Currency 3)
Percentage of Bid Project Cost Bidder would like to receive in Foreign Currency 1 (To be filled as 0.00 if not opted for Foreign Currency 1)
Percentage of Bid Project Cost Bidder would like to receive in Foreign Currency 2 (To be filled as 0.00 if not opted for Foreign Currency 2)
Percentage of Bid Project Cost Bidder would like to receive in Foreign Currency 3 (To be filled as 0.00 if not opted for Foreign Currency 3)
GA Infra Private Limited
Triveni Engineering and Industries Ltd
PULKIT PROJECTS PVT. LTD.
Dineshchandra R Agrawal Infracon Pvt. Ltd.
HNB ENGINEERS PVT LTD
VA TECH WABAG LIMITED
Ramky Infrastructure Ltd
SMS LIMITED
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid