| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹3.8 LAccepted-AOC | ₹3.8 L | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹3.9 L+₹6,750 (1.78%)Rejected-AOC 1 ST FLOOR KUBERA CHAMBERS J M ROAD SHIVAJINAGAR PUNE PUNE MAHARASHTRA 411005 | PUNE | MAHARASHTRA | 411005 | ₹3.9 L+₹6,750 (1.78%) | L-2 | Rejected-AOC L-2 |
| 3 | L-3₹3.9 L+₹11,400 (3.00%)Rejected-AOC | ₹3.9 L+₹11,400 (3.00%) | L-3 | Rejected-AOC L-3 |
| 4 | L-4₹4.1 L+₹32,291 (8.51%)Rejected-AOC CFC 3 SHOP NO 202 302 ASMEETA TEXPA ADDITIONAL KALYAN BHIWANDI INDUSTRIAL AREA MIDC VILLAGE KON BHIWANDI THANE | ₹4.1 L+₹32,291 (8.51%) | L-4 | Rejected-AOC L-4 |
| 5 | L-5₹4.2 L+₹36,904 (9.73%)Rejected-AOC | ₹4.2 L+₹36,904 (9.73%) | L-5 | Rejected-AOC L-5 |
Tender Value
₹4.9 L
Closing Date
31 Jan 2022, 6:00 pmClosed
Asst. General Manager (Engg-Civil)
1st Floor, ATS Complex, Airports Authority of India, Aurangabad Airport
Testing for (Water Act / Air Act / Noise Act) for Environmental Monitoring and Operational Consent 2021-22 at Aurangabad Airport
2022_AAI_100921_1
AAI/AUR/E-C/2021/TESTING
Open Tender
Miscellaneous Works
Item Rate
365 days
Aurangabad Airport
As per NIT and Tender Documents
10 documents required · 10 mandatory
₹1,180
Exempted
23 Feb 2022
11 Jan 2022
2 Feb 2022
12 Jan 2022
31 Jan 2022
12 Jan 2022
12 Jan 2022 - 14 Jan 2022
Amount
STP (Sewage treatment plant) sample analysis for parameters - Biochemical Oxygen Demand (BOD 27°C, 3 days), Chemical Oxygen Demand (COD), PH, Total Suspended Soilds (TSS), Oil & Grease, Total Dissolved Solids (TDS), Chlorides, Sulphates for STP inlet -raw water & outlet - treated water etc. complete as per the direction of Engineer-in Charge.
Testing drinking water for parameters - Indian standards IS -10500-2002 (including pesticides & PAH), microbiological analysis etc. complete as per the direction of Engineer-in Charge.
Testing drinking water for parameters - Indian standards IS -10500-2002 (excluding pesticides & PAH), Microbiological analysis etc. complete as per the direction of Engineer-in Charge.
Stack emision monitoring Nitrogen Dioxide (NO2), Sulphur Dioxide (SO2), Total Particulate Matter (TPM) for DG set 04 nos. capacity more than (100 KV) etc. complete as per the direction of Engineer-in Charge.
Ambient Air quality monitoring 24 Hourly - Ammonia (NH3), Arsenic (As), Benzene (C6H6), Benzo(a)pyrene (BaP), Carbon Monoxide (CO), Lead (Pb), Nickel (Ni), Nitrogen Dioxide (NO2), Sulphur Dioxide (SO2), Ozone (O3), Particulate Matter (PM2.5), Particulate Matter (PM10) etc. complete as per the direction of Engineer-in Charge.
Noise Monitoring - 24 hours Ambient Noise Monitoring ( Day & Night) etc. complete as per the direction of Engineer-in Charge.
Filling of monthly cess format and all the formats to be submitted to MPCB during the year etc. complete as per the direction of Engineer-in Charge.
Noise Monitoring - DG set Noise level monitoring etc. complete as per the direction of Engineer-in Charge.
Filling of Environmental Statement in a prescribed format to MPCB during the year etc. complete as per the direction of Engineer-in Charge..
Mobilization of testing personnel including equipments to conduct one set of samlpe collection & report submission at Airport.
Periodical maintenance of cleaning of STP - Proper cleaning of Aeration tank, Settling tank and Filter Feed tank of dead sludge is settled at the bottom of the tanks; need to remove sludge by pumping out and disposal of the same outside the AAI premises etc. complete as per the direction of Engineer-in Charge.
Provision of new drain points if required at the bottom of settling tank, filter feed tank so that the dead sludge will not settle in these tanks etc. complete as per the direction of Engineer-in Charge.
Provision of new sludge circulation system with new pump of required capacity for the proper functioning of live culture etc. complete as per the direction of Engineer-in Charge.
MBBR (Moving bed biological reaction) media cleaning etc. complete as per the direction of Engineer-in Charge.
STP Commissioning - After cleaning of all tanks need to add new microbial culture to aeration tank & set up of inlet flow of STP etc. complete as per the direction of Engineer-in Charge.
Filling of six monthly compliance report, data sheet and monitoring report along with copy of Environment Clearance in a prescribed format to Ministry of Environment, Forests & Climate Change twice during the year etc. complete as per the direction of Engineer-in Charge..
Mitcon Consultancy and Engineering Services Ltd
Nitya Laboratories
Sky Lab Analytical Laboratory
EXCELL ENVIRO SERVICES
SV ENVIRO LABS AND CONSULTANTS
ABC TECHNO LABS INDIA PRIVATE LIMITED
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .