Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹45.7 LAccepted-AOC NO 6 51 SOUTH STREET ATHIYANALLUR KOTHATTAI PO BHUVANAGIRI TK CUDDALORE DIST 608 501 | ATHIYANALLUR | CUDDALORE | TAMIL NADU | 608501 | L1 | Accepted-AOC L1 | |
| 2 | L2₹46.9 L+₹1.2 L (2.60%)Rejected-AOC 3139 TEACHERS COLONY LALGUDI TRICHY 621 601 | TRICHY | TRICHY | TAMIL NADU | 621601 | L2 | Rejected-AOC L2 | |
| 3 | L3₹47.8 L+₹2.1 L (4.49%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹49.3 L+₹3.6 L (7.88%)Rejected-AOC 3 5 POORALKOTTAI GONUR EAST VILLAGE ANDIKARAI POST METTUR DAM 636 404 | METTUR DAM | METTUR | TAMIL NADU | 636404 | L4 | Rejected-AOC L4 | |
| 5 | L5₹53.2 L+₹7.5 L (16.3%)Rejected-AOC 002 1 NATHAKADU SRI MAHALAKSHMI DYEING PRINTING MILLS CAMPUS BHAVANI MAIN ROAD ERODE 638004 | ERODE | ERODE | TAMIL NADU | 638004 | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | creepers engineering contractors L2 | SHAKTHI CONSTRUCTION L3 | Vidhyut Nirman Corporation L5 | C.GOVINDAN L6 | ASIA BUILDER L1 | M. Kumar Contractor L4 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Clearing Scrub and Light jungle and disposing of 1km away from the site including all labour charges, lead, lift, T&Ps etc., complete as directed by the Engineer in charge. | 400 | M2 | 9 ₹3,600 | 6 ₹2,400 | 1 ₹400 Lowest | 5 ₹2,000 | 1 ₹400 Lowest | 2 ₹800 |
| 2.00 | Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders including all labour charges, lead, lift, T&Ps etc., complete as directed by the Engineer in charge. | 157 | M³ | 156 ₹24,492 | 90 ₹14,130 | 245 ₹38,465 | 123 ₹19,311 | 201 ₹31,557 | 50 ₹7,850 Lowest |
| 3.00 | Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in soft disintegrated rock, lateritie soft rock or Kankar not requring blasting including all labour charges, lead, lift, T&Ps etc., complete as directed by the Engineer in charge. | 79 | M³ | 282 ₹22,278 | 100 ₹7,900 Lowest | 245 ₹19,355 | 180 ₹14,220 | 301 ₹23,779 | 100 ₹7,900 Lowest |
| 4.00 | Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in medium and dense medium rock not requiring blasting for foundation including all labour charges, lead, lift, T&Ps etc., completeas directed by the Engineer in charge. | 27 | M³ | 393 ₹10,611 | 110 ₹2,970 Lowest | 245 ₹6,615 | 250 ₹6,750 | 401 ₹10,827 | 200 ₹5,400 |
| 5.00 | Transporting the surplus excavated earth from with a lead of 1km over the initial lead of 10m and lift of 2m, depositing in places and spreading including all labour charges, lead, lift, T&Ps etc., complete as directed by the Engineer in charge. | 75 | M³ | 43 ₹3,225 | 8 ₹600 Lowest | 150 ₹11,250 | 50 ₹3,750 | 101 ₹7,575 | 50 ₹3,750 |
| 6.00 | Refilling with excavated earth well -watered and consolidated in layers of not more than 150mm thick in foundation and basement including all labour charges, lead, lift, T&Ps etc., complete as directed by the Engineer in charge. | 75 | M³ | 43 ₹3,225 | 40 ₹3,000 Lowest | 40 ₹3,000 Lowest | 42 ₹3,150 | 51 ₹3,825 | 40 ₹3,000 Lowest |
| 7.00 | Supplying and filling M sand (Approved quarry) well watered and consolidated in foundation and basement in layers complying with standard specification,including cost of all materials, all labour charges, lead, lift, T&Ps etc., complete as directed by the Engineer in charge. | 35 | M³ | 1,702 ₹59,570 | 1,700 ₹59,500 | 800 ₹28,000 | 2,500 ₹87,500 | 1,001 ₹35,035 | 300 ₹10,500 Lowest |
| 8.00 | Providing Anti termite pre construction treatment using emulsifiable concentrate of required percentage as suggested by the manufacture and specification as per 6313 part II - 1971 around excavated Area, plinth,foundation and basement in four stages including cost of all materials, lead,lift etc., complete as directed by the Engineer in charge. | 88 | M2 | 43 ₹3,784 | 200 ₹17,600 | 25 ₹2,200 Lowest | 200 ₹17,600 | 101 ₹8,888 | 50 ₹4,400 |
| 9.00 | Providing Plain Cement Concrete in 1:4:8, using OPC 53 grade cement (DALMIA/ ULTRATECH/RAMCO) ,M sand , 40mm HBG metal (Approved quarry) including cost of cement, all materials, labour charges, curing, all leads, lifts, as per standard specification etc., complete as directed by the Engineer in charge.(By using mixer machine) | 29 | M³ | 4,070 ₹1,18,030 | 4,000 ₹1,16,000 Lowest | 5,500 ₹1,59,500 | 5,000 ₹1,45,000 | 4,001 ₹1,16,029 | 5,000 ₹1,45,000 |
| 10.00 | Providing P.C.C. 1:3:6 using OPC 53 grade cement (DALMIA/ULTRATECH/ RAMCO),M sand 12 to 20mm HBG metal (Approved quarry) for flooring and basement including cost of all materials, labour charges, curing, T&P, lead, lift etc., complete as directed by the Engineer in charge.(By using mixer machine). | 30 | M³ | 4,810 ₹1,44,300 Lowest | 5,800 ₹1,74,000 | 6,000 ₹1,80,000 | 6,000 ₹1,80,000 | 5,001 ₹1,50,030 | 5,000 ₹1,50,000 |
Tender Value
Refer Docs
EMD Value
₹54,160
Closing Date
4 Jul 2025, 2:00 pmClosed
The Superintending Engineer
SE/MEDC/Mettur
Construction of control room with cable duct and electrification works to the Thumbipady 110 22KV SS
2025_EB_569895_1
SE/MEDC/Spec.No.OT.04/25-26
Open Tender
Civil Works
Works
270 days
Thumbipady110 22 KV SS
As per BQR Conditons
2 documents required · 2 mandatory
₹0
₹54,160
30 Oct 2025
17 Jun 2025
4 Jul 2025
17 Jun 2025
4 Jul 2025
17 Jun 2025
17 Jun 2025 - 4 Jul 2025
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .