| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.2 LAccepted-AOC N HE PUNE | ₹9.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹11.7 LRejected-Finance DESIGN TOWER OFFICE NO 301 302 AND 303 THIRD FLOOR PUNE SATARA ROAD NEAR CITY PRIDE THEATER BIBWEWADI PUNE 411037 | PUNE | PUNE | MAHARASHTRA | 411037 | ₹11.7 L | L2 | Rejected-Finance L2 |
| 3 | L3₹11.8 LRejected-Finance RM 4 SAHJEEVAN HOC G BLOCK MIDC SHAHUNAGAR KSB CHOWK CHINCHWAD PUNE 411019 | PUNE | PUNE | MAHARASHTRA | 411019 | ₹11.8 L | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | Shree Ganesh Enterprises L1 | SV Biradar L3 | ARIHANT CONSTRUCTIONS INDIA PVT LTD L2 |
|---|---|---|---|---|---|---|
| 1.10 | Excavation for foundation / pipe trenches inearth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A-1/259) Lift 0 to 1.5 M MJP DSR 23-24/1/page 37 | 1 | Cum | 181 ₹181 Lowest | 191 ₹191 | 190 ₹190 |
| 1.20 | Excavation for foundation / pipe trenches in hardmurum including removing the excavated material upto a distance of 50 M and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A-2/259)Lift 0 to 1.5 M MJP DSR 23-24/2/page 37 | 1 | Cum | 205 ₹205 Lowest | 210 ₹210 | 210 ₹210 |
| 1.30 | Excavation for foundation / pipe trenches inhard rock and concrete road by chiselling, wedging, line drilling by mechanical means or by all means other than blasting including trimming and levelling the bed, removing the excavated material upto a distance of 50 metres beyond the area and lifts as below, stacking as directed by Engineer-in-charge, normal dewatering, excluding backfilling, etc. complete by all means. (Bd-A-6/259)Lift 0 to 1.5 M MJP DSR 23-24/7/page 38 | 1 | Cum | 1,230.5 ₹1,230.5 Lowest | 1,260 ₹1,260 | 1,250 ₹1,250 |
| 1.40 | Excavation for foundation / pipe trenches in all types of strata ie soft murum,Hard Murum hard rock,concrete Rd by Mechanical Means,Breaker etc including removing the excavated material upto a distance of 50 M and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Average)Lift 0 to 1.5 M MJP DSR 23-24/2/page 37-38 | 1 | Cum | 645 ₹645 Lowest | 720 ₹720 | 700 ₹700 |
| 1.50 | Desilting the suuply well MJP DSR 23-24/13/page 40 | 1 | Cum | 859 ₹859 Lowest | 900 ₹900 | 890 ₹890 |
| 1.60 | JCB/Breaker on Rent MJP DSR 23-24/13/page 15 | 1 | Hr | 1,541 ₹1,541 Lowest | 1,550 ₹1,550 | 1,550 ₹1,550 |
| 1.70 | Dewatering the excavated trenches and pool of water in the pipe line trenches etc MJP DSR 23-24/14/page 40 | 1 | HP/Hr | 97.9 ₹97.9 Lowest | 112 ₹112 | 110 ₹110 |
| 1.80 | Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard material in 15 cm layers with all leads and lifts including consolidation,surcharging, etc. complete. MJP DSR 23-24/15/page 40 | 1 | Cum | 101.6 ₹101.6 Lowest | 112 ₹112 | 105 ₹105 |
| 1.90 | Filling in plinth and floors murum bedding in trenches with approved murum from excavated materials from foundation in 15 cm to 20 cm layers including watering andcompaction, etc. complete. (Bd-A-10/263) MJP DSR 23-24/16/page 41 | 1 | Cum | 101.6 ₹101.6 Lowest | 112 ₹112 | 105 ₹105 |
| 2.00 | Filling in plinth and floors / trenches withcontractor's murum for bedding in 15 cm to20 cm layers including watering and compaction, etc. complete. (Bd-A-11/263) MJP DSR 23-24/17/page 41 | 1 | Cum | 1,003 ₹1,003 Lowest | 1,110 ₹1,110 | 1,110 ₹1,110 |
Tender Value
Refer Docs
EMD Value
₹60,000
Closing Date
13 May 2026, 3:00 pmClosed
chief Officer
Chakan Municipal Council
Supply of materials for reparing of daily water distribution pipeline for Water Supply Department of Chakan Municipal Council
2026_DMA_1299622_1
Supply of materials for reparing of daily water distribution pipeline for Water Supply Department
Open Tender
Civil Works - Water Works
Item Rate
365 days
Chakan Municipal Council
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,500
₹60,000
27 Jul 2026
1 May 2026
15 May 2026
1 May 2026
13 May 2026
1 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.1 | Excavation for foundation / pipe trenches inearth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A-1/259) Lift 0 to 1.5 M MJP DSR 23-24/1/page 37 | 1 | Cum | 181.5 | ₹181.5 |
| 1.2 | Excavation for foundation / pipe trenches in hardmurum including removing the excavated material upto a distance of 50 M and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A-2/259)Lift 0 to 1.5 M MJP DSR 23-24/2/page 37 | 1 | Cum | 205.7 | ₹205.7 |
| 1.3 | Excavation for foundation / pipe trenches inhard rock and concrete road by chiselling, wedging, line drilling by mechanical means or by all means other than blasting including trimming and levelling the bed, removing the excavated material upto a distance of 50 metres beyond the area and lifts as below, stacking as directed by Engineer-in-charge, normal dewatering, excluding backfilling, etc. complete by all means. (Bd-A-6/259)Lift 0 to 1.5 M MJP DSR 23-24/7/page 38 | 1 | Cum | 1,230.57 | ₹1,230.57 |
| 1.4 | Excavation for foundation / pipe trenches in all types of strata ie soft murum,Hard Murum hard rock,concrete Rd by Mechanical Means,Breaker etc including removing the excavated material upto a distance of 50 M and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Average)Lift 0 to 1.5 M MJP DSR 23-24/2/page 37-38 | 1 | Cum | 644.75 | ₹644.75 |
| 1.5 | Desilting the suuply well MJP DSR 23-24/13/page 40 | 1 | Cum | 859.1 | ₹859.1 |
| 1.6 | JCB/Breaker on Rent MJP DSR 23-24/13/page 15 | 1 | Hr | - | - |
| 1.7 | Dewatering the excavated trenches and pool of water in the pipe line trenches etc MJP DSR 23-24/14/page 40 | 1 | HP/Hr | 97.9 | ₹97.9 |
| 1.8 | Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard material in 15 cm layers with all leads and lifts including consolidation,surcharging, etc. complete. MJP DSR 23-24/15/page 40 | 1 | Cum | 101.64 | ₹101.64 |
| 1.9 | Filling in plinth and floors murum bedding in trenches with approved murum from excavated materials from foundation in 15 cm to 20 cm layers including watering andcompaction, etc. complete. (Bd-A-10/263) MJP DSR 23-24/16/page 41 | 1 | Cum | 101.64 | ₹101.64 |
| 2 | Filling in plinth and floors / trenches withcontractor's murum for bedding in 15 cm to20 cm layers including watering and compaction, etc. complete. (Bd-A-11/263) MJP DSR 23-24/17/page 41 | 1 | Cum | 1,003.09 | ₹1,003.09 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
BOQ_2231717.xls
BOQ • 0.51 MB
DTN.pdf
Tender Documents • 1.84 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].