| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.8 LAccepted-AOC | ₹23.8 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹26.0 L+₹2.3 L (9.61%)Rejected-AOC | ₹26.0 L+₹2.3 L (9.61%) | L2 | Rejected-AOC L2 |
| 3 | L3₹27.3 L+₹3.5 L (14.9%)Rejected-AOC NEHRU NAGAR DHARMAPURI | DHARMAPURI | TAMIL NADU | 635106 | ₹27.3 L+₹3.5 L (14.9%) | L3 | Rejected-AOC L3 |
| 4 | L4₹27.6 L+₹3.8 L (16.0%)Rejected-AOC | ₹27.6 L+₹3.8 L (16.0%) | L4 | Rejected-AOC L4 |
| 5 | L5₹31.5 L+₹7.8 L (32.7%)Rejected-AOC | ₹31.5 L+₹7.8 L (32.7%) | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | K.Mani L2 | L.Arivazhagan L1 | CHINNAMUTHU CONTRACTORS L3 | Seerangamuthu L4 | Karthikeyan Construction L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00Constrution of 60000 Ltr OHT at A.Gollahalli Colony H/O A.Gollahalli | ||||||||
| 2.00 | Earth work excavation below G.L. and depositing on bank within an initial lead of 10.00 m and an initial lift of 2.00 for the following classification of soil
First depth of 2m
In hard stiff clay, stiff black cotton soil, hard red earth, sales, murrams, gravel, stoney earth, earth mixed with small sized boulders and hard gravelly soil S.S.20B
For Column Footing
For GL Brace | 72.36 | Cum | 218.67 ₹15,822.09 | 263 ₹19,029.63 | 180 ₹13,024.08 Lowest | 228.81 ₹16,555.78 | 260 ₹18,812.56 |
| 3.00 | Second depth of 2.0m to 3.0 m | 11.77 | Cum | 218.67 ₹2,574.62 Lowest | 263 ₹3,096.56 | 240 ₹2,825.76 | 228.81 ₹2,694.01 | 260 ₹3,061.24 |
| 4.00Sand filling for foundation with clear river sand including cost of sand watering, ramming and consolidation etc complete as directed by TWAD Board officers. | ||||||||
| 5.00 | For Column Footing | 3.36 | Cum | 1,490.13 ₹5,012.8 Lowest | 1,993 ₹6,704.45 | 1,600 ₹5,382.4 | 1,563.39 ₹5,259.24 | 1,800 ₹6,055.2 |
| 6.00PCC 1:4:8 using 40mm HBG metal including mixing curing etc.,below 1.50 m from GL. | ||||||||
| 7.00 | For Column Footing | 5.05 | Cum | 4,545.64 ₹22,937.3 Lowest | 5,645 ₹28,484.67 | 5,220 ₹26,340.12 | 4,770.21 ₹24,070.48 | 5,400 ₹27,248.4 |
| 8.00RCC in M 30 mix using10mm& 20mm size HBG metal excluding cost of reinforcement and centering but including cost of mixing, laying, curing, finishing etc.complete | ||||||||
| 9.00 | A). Below 1.5m from GL
Column Footing
For rectangular portion
For trapezoidal portion | 12.23 | Cum | 7,634.21 ₹93,374.02 | 7,531.2 ₹92,114.11 | 7,500 ₹91,732.5 Lowest | 8,010.96 ₹97,982.05 | 8,900 ₹1,08,855.9 |
| 10.00 | B). 0m to 1.50m below GL
Column
Braces at GL | 2.52 | Cum | 7,634.21 ₹19,253.48 | 7,420 ₹18,713.24 Lowest | 7,800 ₹19,671.6 | 8,010.96 ₹20,203.64 | 8,900 ₹22,445.8 |
Tender Value
₹32.1 L
EMD Value
₹33,000
Closing Date
10 Feb 2026, 3:00 pmClosed
Block Development Officer(BP), Dharmapuri
Block Development Office, Dharmapuri
Constrution of 60000 Ltr OHT at A.Gollahalli Colony
2026_RDTN_651585_1
Roc.No. 408/2026/A2 dt. 2.2.26 Dharmapuri Block/ G.F.25-26 Constrution of 60000 Ltr OHT
Open Tender
Civil Works
Item Rate
90 days
Block Development Office
Can be seen in the tender documents
3 documents required · 3 mandatory
₹0
₹33,000
Yes
23 Jun 2026
5 Feb 2026
10 Feb 2026
5 Feb 2026
10 Feb 2026
5 Feb 2026
Constrution of 60000 Ltr OHT at A.Gollahalli Colony H/O A.Gollahalli
Earth work excavation below G.L. and depositing on bank within an initial lead of 10.00 m and an initial lift of 2.00 for the following classification of soil First depth of 2m In hard stiff clay, stiff black cotton soil, hard red earth, sales, murrams, gravel, stoney earth, earth mixed with small sized boulders and hard gravelly soil S.S.20B For Column Footing For GL Brace
Second depth of 2.0m to 3.0 m
Sand filling for foundation with clear river sand including cost of sand watering, ramming and consolidation etc complete as directed by TWAD Board officers.
For Column Footing
PCC 1:4:8 using 40mm HBG metal including mixing curing etc.,below 1.50 m from GL.
For Column Footing
RCC in M 30 mix using10mm& 20mm size HBG metal excluding cost of reinforcement and centering but including cost of mixing, laying, curing, finishing etc.complete
A). Below 1.5m from GL Column Footing For rectangular portion For trapezoidal portion
B). 0m to 1.50m below GL Column Braces at GL
C). 0m to 1.00m above GL Column
D). 1.00m to 4.50m above GL Column Braces at 2.875 m from GL
E). 4.50 m to 7.32 m above GL Column Braces at 5.975 m from GL
F). 7.32 m to 10.98 m above GL Column Braces at 9.075 m from GL
G). 10.98 m to 14.64 m above GL Column upto 11.40m For Floor beam For Floor Slab For Side Wall 11.85m to 14.64m For haunches
H). 14.64 m to 18.30 m above GL For Side Wall 14.64m to 15.30m For Roof slab Deduction for manhole cover for ventilater
Steel Centering, soffits of RCC works including strutting and shuttertting Charges etc. complete for the following
I). Plain Surface
A) Below GL
B). From GL to 3.30m Ist set Brace bottom Ist set Brace sides
C).From 3.31m to 4.30m For Roof Bottom Deduct for manhole Deduct side wall bottom
D).From 5.31m to 6.30m 2nd set Brace bottom at 5.975m 2nd set Brace sides
E). From 6.31m to 7.30m 2nd set Brace bottom at 5.975m 2nd set Brace sides
F). From 8.31m to 9.30m 3rd set Brace bottom at 9.075m 3rd set Brace sides
G). From 9.31m to 10.30m 3rd set Brace bottom at 9.075m 3rd set Brace sides
H) From 11.31m to 12.30m For Floor Slab bottom Floor beam Outer side Floor beam Inner side Deduct column junction
II). Square Column:
Steel Centering, soffits of RCC works including strutting and shuttertting Charges etc. complete for the following
A) Square Column Below GL and upto 3.30m above GL
B). 3.31m to 4.30m ht
C). 4.31m to 5.30m ht
D). 5.31m to 6.30m ht Deduct for 2nd set Brace junction
E). 6.31m to 7.30m ht Deduct for 2nd set Brace junction
F). 7.31m to 8.30m ht
G). 8.31m to 9.30m ht 3rd set Brace junction at 9.075m
H) 9.31m to 10.30m ht 3rd set Brace junction at 9.075m
I) 10.31m to 11.30m ht
J) 11.31m to 12.30m ht
III-A).Curved Surface - upto 3.30m ht.
B).Curved Surface - 3.30m to 4.30m ht.
Supply, fabrication, placing in position of steel rods cutting tying etc. complete including cost of reinforcement RTS rods. Upto 16mm RTS Above 16mm RTS
Painting two coatsto the exposed surface of SR using cement paint
Providing outside M.S Ladder of 45cm wide made out of 50x50x6mm MS angle for sides and steps fixed at 30 cm centre to centre etc.and providing of Landing slabs with hand rails using 32mm GI pipe and 40mmx6mm MS flat etc. as per approved design
Providing Hand rails over the Roof slab by using 32 mm GI Pipe with 40mm x 6mm MS Flat and fixied with 12mm dia Fastner Bolt 75mm long and as directed by TWAD Bd officers
Providing and fixing of RCC inner access ladder in RCC 1:1.5:3 (One cement, one and half sand and three aggregates) using 20mm HBG stone for OHT including cost of reinforcement, placing grill in position, centering shuttering charges, mixing concrete curing etc.,
Providing GI Ventilation arrangement 2 nos mosquito proof nylon net with 65 mm GI pipe and spls as directed by the TWAD Board officers 1 m 65 mm Gi pipe, 4 nos 65 mm Gi elbow , 4nos cutting and 8 nos threading and 2 nos 65 mm GI tee
Providing cut stone slab in CM 1:3 of size 0.3 m x 0.3 m x 0.15 m and as directed by TWAD Board officers
Providing manhole cover of size 0.60 x 0.60M in RCC 1:1.5:3 with suitable reinforcement and 50x50x6mm MS angle fixed along edges and as directed by TWAD Board officers
Provision for pipe connection arrangements for inlet, outlet scour and overflow etc. including cost of pipes, specials, valve, labour charge for lifting, aligning, cutting, threading, fixing and painting of GI pipes with two coats of approved quality enamel paint
65mm dia GI pipes
65mm Ø GI Tee
65mm dia GI Elbow
65mm Ø GM Gate valve
65mm dia GI Flangeset
65mm dia GI Coupling
Refilling the foundation with excavated earth including consolidation as directed by the TWAD Board officers. As per item l(a) + l(b) Less item 2,3 & 4A & 4B
Providing Fencing arrangement (Sub Estimate)
Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift etc complete
Plain Cement concrete 1:4:8 mix usin 40m HBG metal inculding cost and
Plain Cement concrete 1:2:4 mix using 20mm ISS metal including cost and inciuding cost and conveyance of all materials to site labour for mixing ,laying,curing etc complete,
Reinforced Cement concrete 1:1 1/2:3 mix using 20mm ISS metal including cost and inciuding cost and conveyance of all materials to site labour for mixing ,laying,curing etc complete,
Supplying and fabrication of steel including cost and conveyance ofsteel to site and all labour charges for straightening, cutting to length,
Supplying and erecting centering shuttering including necessary supports for plane
Providing for Chain Link - 2" x 2" using 10 Gauge Galvanised Iron Wire (of all sizes) cost and Conveyace all materials and labour charges Etc…,m Completed
Barbed Wire - 10 Gauge - Two Ply and Four Pronged (Galvanised)
Binding Wire (Black 18 G)
Labour charges for fixing Chainlink and barbed wire etc complete
Painting two coats with Emulsion Paint over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete
Provision for Main gate
PROVIDING PLAT FORM ARRANGEMENTS (Sub Estimate)
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering where ever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification.
Supply and erecting sheet centering for plane surface including all charges to complete
Cement concrete 1:2:4 using 20.m.m. H.B.G.Jelly for foundation including watering where ever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification.
Provison for Pipe line (Sub Estimate)
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Supply of 63mm PVC Pipes including cost and conveyance of all materials to site and all labour charges etc., completed. Pipe line
50 mm GI Pipe
50 mm GI Elbow
50 mm GI Union
Labour charges for laying and joining 40mm HDPE Pipes including all labour charges for laying pipes in proper alingment and gradient including cost of solvent cement etc., complete. 63mm PVC Pipe
50 mm GI Pipe
Refilling with excavated earth after laying of pipes including all labour charges Solvent cement etc., complete.
Providing Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.49 MB
Pricebid.pdf
Additional Documents • 0.53 MB
Technicalbid.pdf
Tender Documents • 0.72 MB
BOQ_781353.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .